ID Date Author Group Subject Text Attachments
  349   20 Sep 2023, 19:42 Peter ZaldenFXEIssueConnerning the phase shifter adjustment
after undulator gap scan via karabo:

At 19:30 FXE tested the scan change
  
  348   20 Sep 2023, 02:09 Jayanath KoliyaduSPBShift endX-ray delivery


7 keV, 2.1 mJ, stable delivery


Optical
laser delivery
  
  347   19 Sep 2023, 18:58 Jan GruenertPRCSA1 statusConcerning SASE1:

Please note that for this week
the "remote power limit" was set
  
  346   18 Sep 2023, 19:14 Yifeng JiangFXEIssue
We found that the x-ray pulse energy
dropped a lot when we changed the undulator
from 5.5 keV to 5.45 keV. We called BKR to
 11111.PNG3435.PNG 
  345   15 Sep 2023, 14:54 Chan KimSPBIssueVacuum issue at XTD2 tunnel which might
be triggered by SA1_XTD2_ATT Arm5 (1.2mm
thick CVD diamond)
 Screenshot_from_2023-09-15_14-51-56.pngScreenshot_from_2023-09-15_15-06-49.png 
  344   14 Sep 2023, 23:03 Tokushi SatoSPBShift summaryX-ray delivery


1.1 mj, 564 kHz, 93 pulses,
stable delivery


Optical
  
  343   14 Sep 2023, 16:49 Thomas Baumann Summary: Night 13th and Day 14thThe late shift on the 13th fixed remaining
problems with the DLD and the calibration
pipeline.
  
  342   14 Sep 2023, 00:05 Tokushi SatoSPBShift summaryX-ray delivery


1.1 mj, 564 kHz, 93 pulses,
stable delivery


Optical
  
  341   13 Sep 2023, 02:18 Tokushi SatoSPBShift summaryX-ray delivery


0.5 mj, improved to 1.1
mj xray energy in the evening


Optical
  
  340   09 Sep 2023, 15:03 Naresh KujalaPRCStatusInfo from Machine RC (Lars):

----------------------------------------------------------------------------------------------------------------------------------------

Author: Froehlich
  
  339   09 Sep 2023, 11:36 Naresh KujalaPRCStatus- Due to the failure of the cryo cold
compressor. The machine is down.

- Next update 9 pm today
  
  338   09 Sep 2023, 07:54 Naresh KujalaPRCStatusInfo from MRC (Lars)

-----------------------------------------------------------------------------

The cryo crew reports that the
  
  337   09 Sep 2023, 07:00 Erik BrambrinkHEDShift summary
Data taken from 11 to cryo failure
Beam
conditions stable
Timing scan
for different energy
Operation
  
  336   08 Sep 2023, 06:22 Erik BrambrinkHEDShift summary
Improved the alignment procedure:

Using
the pin to make sure of the spatial overlap
SAXS
signal is used to make sure the pin is well
  
  335   07 Sep 2023, 23:46 Andreas ScherzSCSShift summaryShift summary 07.09.2023

Achievements:
1. found t0   on LSCO x=0.15
  
  334   07 Sep 2023, 07:24 Justine Schlappa, Guiseppe MercurioSCSShift summary, September 7 after nightshiftAchievements:
- Optimized hRIXS settings for OK
edge at 145 deg scattering angle, resolution
  
  333   06 Sep 2023, 23:33 Ben, AndreasSCSShift SummaryAchievements


Determined temporal overlap
between the X-ray and laser
measured
  
  332   06 Sep 2023, 06:35 Giuseppe MercurioSCSGiuseppe, Justineachievements:

- we found optimum hRIXS settings
for 1020 eV but moving the detector arm
  
  331   05 Sep 2023, 22:33 Oliver HumphriesHEDShift summary
Received the beam from day shift,
aligned to beam stop (low signal due to 4m
air scatter, only 700uJ upstream)

ZYLA5
  
  330   29 Aug 2023, 03:14 Wonhyuk JoMIDShift summaryShift summary for 29th of Aug.

- Conducted Time-resolved Bragg
CDI experiment using 3rd harmonic pump laser. 
  
ELOG V3.1.4-7c3fd00