ID |
Date |
Author |
Group |
Subject |
Text |
|
349
|
20 Sep 2023, 19:42 |
Peter Zalden | FXE | Issue | Connerning the phase shifter adjustment
after undulator gap scan via karabo:
At 19:30 FXE tested the scan change |
|
348
|
20 Sep 2023, 02:09 |
Jayanath Koliyadu | SPB | Shift end | X-ray delivery
7 keV, 2.1 mJ, stable delivery
Optical
laser delivery |
|
347
|
19 Sep 2023, 18:58 |
Jan Gruenert | PRC | SA1 status | Concerning SASE1:
Please note that for this week
the "remote power limit" was set |
|
346
|
18 Sep 2023, 19:14 |
Yifeng Jiang | FXE | Issue |
We found that the x-ray pulse energy
dropped a lot when we changed the undulator
from 5.5 keV to 5.45 keV. We called BKR to |
|
345
|
15 Sep 2023, 14:54 |
Chan Kim | SPB | Issue | Vacuum issue at XTD2 tunnel which might
be triggered by SA1_XTD2_ATT Arm5 (1.2mm
thick CVD diamond) |
|
344
|
14 Sep 2023, 23:03 |
Tokushi Sato | SPB | Shift summary | X-ray delivery
1.1 mj, 564 kHz, 93 pulses,
stable delivery
Optical |
|
343
|
14 Sep 2023, 16:49 |
Thomas Baumann | | Summary: Night 13th and Day 14th | The late shift on the 13th fixed remaining
problems with the DLD and the calibration
pipeline. |
|
342
|
14 Sep 2023, 00:05 |
Tokushi Sato | SPB | Shift summary | X-ray delivery
1.1 mj, 564 kHz, 93 pulses,
stable delivery
Optical |
|
341
|
13 Sep 2023, 02:18 |
Tokushi Sato | SPB | Shift summary | X-ray delivery
0.5 mj, improved to 1.1
mj xray energy in the evening
Optical |
|
340
|
09 Sep 2023, 15:03 |
Naresh Kujala | PRC | Status | Info from Machine RC (Lars):
----------------------------------------------------------------------------------------------------------------------------------------
Author: Froehlich |
|
339
|
09 Sep 2023, 11:36 |
Naresh Kujala | PRC | Status | - Due to the failure of the cryo cold
compressor. The machine is down.
- Next update 9 pm today |
|
338
|
09 Sep 2023, 07:54 |
Naresh Kujala | PRC | Status | Info from MRC (Lars)
-----------------------------------------------------------------------------
The cryo crew reports that the |
|
337
|
09 Sep 2023, 07:00 |
Erik Brambrink | HED | Shift summary |
Data taken from 11 to cryo failure
Beam
conditions stable
Timing scan
for different energy
Operation |
|
336
|
08 Sep 2023, 06:22 |
Erik Brambrink | HED | Shift summary |
Improved the alignment procedure:
Using
the pin to make sure of the spatial overlap
SAXS
signal is used to make sure the pin is well |
|
335
|
07 Sep 2023, 23:46 |
Andreas Scherz | SCS | Shift summary | Shift summary 07.09.2023
Achievements:
1. found t0 on LSCO x=0.15 |
|
334
|
07 Sep 2023, 07:24 |
Justine Schlappa, Guiseppe Mercurio | SCS | Shift summary, September 7 after nightshift | Achievements:
- Optimized hRIXS settings for OK
edge at 145 deg scattering angle, resolution |
|
333
|
06 Sep 2023, 23:33 |
Ben, Andreas | SCS | Shift Summary | Achievements
Determined temporal overlap
between the X-ray and laser
measured |
|
332
|
06 Sep 2023, 06:35 |
Giuseppe Mercurio | SCS | Giuseppe, Justine | achievements:
- we found optimum hRIXS settings
for 1020 eV but moving the detector arm |
|
331
|
05 Sep 2023, 22:33 |
Oliver Humphries | HED | Shift summary |
Received the beam from day shift,
aligned to beam stop (low signal due to 4m
air scatter, only 700uJ upstream)
ZYLA5 |
|
330
|
29 Aug 2023, 03:14 |
Wonhyuk Jo | MID | Shift summary | Shift summary for 29th of Aug.
- Conducted Time-resolved Bragg
CDI experiment using 3rd harmonic pump laser. |
|
|