Group Selection Page HELP DOC Controls Group Data Analysis Group ITDM WP76 DET Vacuum XRO EEE WP78 WP74 FXE SCS SPB MID HED SQS SXP Sample Environment Photon Commissioning Team Operation PSPO XO TS
OPERATION-2024 OPERATION-2023 OPERATION-2022 OPERATION-2021 OPERATION-2020 OPERATION-2019 SASE1-2018 SASE1-2017 Experiment data
  OPERATION-2023 logbook, Contact: F.Wolff-Fabris, A.Galler, L.Samoylova, H.Sinn, Page 8 of 24  Not logged in ELOG logo
ID Date Author Group Subject Text Attachments
  329   28 Aug 2023, 23:03 Tokushi SatoSPBShift summaryX-ray delivery


9.3 keV, up to 185 pulses
at 564 kHz, 2.3  mJ, stable delivery


Optical
  
  328   28 Aug 2023, 02:14 Wonhyuk JoMIDShift summaryShift summary for 28th of Aug.
- Realigned the center of rotation. 
- MID took the seeded beam at about
  
  327   27 Aug 2023, 23:09 Tokushi SatoSPBShift summaryX-ray delivery


9.3 keV, up to 185 pulses
at 564 kHz, 2.4  mJ, stable delivery


Optical
  
  326   26 Aug 2023, 18:02 Naresh KujalaPRCStatusDear All,

Two
important machine updates.
  
  325   26 Aug 2023, 08:23 Naresh KujalaPRCStatus- Machine updates;

Saturday 1:30 hr Cold compressor
failed. The initial estimation of downtime
  
  324   26 Aug 2023, 02:07 Felix BrausseMIDShift summary
Shift
summary the 25th of Aug


Found laser and X-ray spatiotemporal
  
  323   25 Aug 2023, 23:03 Tokushi SatoSPBShift summaryX-ray delivery


9.3 keV, up to 185 pulses
at 564 kHz, 2.7  mJ, stable delivery


Optical
  
  322   25 Aug 2023, 07:29 Tommaso MazzaSQSShift summaryproblems with machine operation

very low yield at 1.8keV, took
~2hrs tuning time to get 600uJ (linear taper)
 Screenshot_from_2023-08-25_02-31-19.png 
  321   25 Aug 2023, 06:20 Johannes MoellerMIDShift summary
Shift
summary the 24th of Aug


MID takes the seeded beam
  
  320   24 Aug 2023, 22:51 Tokushi SatoSPBShift summaryX-ray delivery


9.3 keV, up to 185 pulses
at 564 kHz, 3.7  mJ, stable delivery


Optical
  
  319   23 Aug 2023, 22:56 Tokushi SatoSPBShift summaryX-ray delivery


9.3 keV, up to 185 pulses
at 564 kHz, 3.7  mJ, beam intensity
  
  318   22 Aug 2023, 23:32 Tokushi SatoSPBShift summaryX-ray delivery


9.3 keV, up to 178 pulses
at 564 kHz, 3.7  mJ, stable delivery
Beam
  
  317   22 Aug 2023, 18:15 Naresh KujalaPRCStatusPhoton beam delivery status:

- Machine informed that beam will
be handover to instruments SA1 (SPB/SFX)
  
  316   22 Aug 2023, 15:56 Naresh KujalaPRCSA1 statusSA1 photon beam line status

- CRL1 lenses are in the beam. 

- The shutter between XTD2 and
  
  Draft   22 Aug 2023, 15:52 Naresh KujalaPRCSA1 statusSA1 photon beam line status

- CRL1 lenses are in the beam. 

- The shutter between XTD2 and
  
  314   21 Aug 2023, 04:31 Konopkova ZuzanaHEDExperiment summarybeam: 7.7 keV seeded, ~300 uJ/pulse, 2.2
MHz, 20 pulses


user experiment finilized,
  
  313   19 Aug 2023, 07:16 Sergii, ManuelSCSNoght shift sammary 18.08.2023
Night
shift summary on 18.03.2023


Finished XAS series at
  
  312   19 Aug 2023, 06:20 Konopkova ZuzanaHEDShift summarybeam parameters: 7.7 keV seeded, 2.2 MHz,
up to 20 pulses, 150 uJ/pulse


user program, measuring
  
  311   17 Aug 2023, 23:54 Justine SchlappaSCSAfternoon Shift Summary on 17.08.2023Achievements:
1. Finalized tr-RIXS series at 1.74
mJ/cm2
  
  310   17 Aug 2023, 11:09 Sergii Parchenko, Manuel HarderSCSNight shift summary on 16.08.23Achievements


Acquired tr-RIXS data with
4.0 mJ/cm² laser power for 21 delays
  
ELOG V3.1.4-7c3fd00