Entry   VAC - Hera clean tent lamellen, posted by Orkidia Bilani on 04 Jan 2023, 14:42 
Bianca (VAC) wanted some of the Hera clean tent curtains (currently in XHE1) here in campus (in order to make a Gehäuse for the dewars, sie hatte
schon mit Lorenz darüber gesprochen).

Went together there and brought 15 pieces here, stored now in the VAC lab.
Entry   MID pump on the exp. hutch roof, posted by Orkidia Bilani on 02 Jan 2023, 09:14 MiD_pump_roof.jpg
On the roof of the MID exp. hutch one of the pumps is making  strange loud noises (laut zischen). The display is off,
same as the other pump close to that (which is switched off).

Contacted/called Andreas Schmidt, he assumed that, that is not good with the pump, but cannot solve the problem
Entry   Extension Module Gewicht ermittelt, posted by Sascha Menzel on 23 Dec 2022, 11:23 Image20221223112747.jpg
Das SCS GRD Extension Module-38982 QR49620 mit der Kranwage angekrant um das Gewicht zu ermitteln. 620kg
Entry   2 Dewar gefüllt, posted by Sascha Menzel on 21 Dec 2022, 13:08 Image20221221130815.jpg
2 Dewar #25580 & #44229 gefüllt.

 

Coworkers: S.Menzel, M.Lüdeke
Entry   SQS Frame Installation for exaust air 20.12.2022, posted by Michael Luedeke on 21 Dec 2022, 07:48 20221220_135039.jpg20221220_135103.jpg20221220_135133.jpg20221220_135109.jpg20221220_135053.jpg
 
Entry   Update: Stored parts in XHE1, posted by Orkidia Bilani on 19 Dec 2022, 12:42 
The documentation for the storeed parts in the shaft building XHE1 has been updated and uploaded to Alfresco (see link below):

https://docs.xfel.eu/share/page/site/x-ray-operations/document-details?nodeRef=workspace://SpacesStore/b34eece4-1700-4d93-b546-aff1645a00f8

 
Entry   SQS start installation frame for exhaust, posted by Michael Luedeke on 16 Dec 2022, 11:51 20221216_111621.jpg20221216_111637.jpg
 
Entry   Kranen und Transport zum XHE1, posted by Sascha Menzel on 14 Dec 2022, 14:30 6x
SCS Parts in der Hutch auf Paletten und Gitterbox gekrant, verzurrt und für den Transport zum XHE1 in die LKW Schleuse gebracht. SCS Parts und Palette
von SPB/SFX nach Osdorf XHE1 transportiert.

Die Palette von SPB/SFX mit Hilfe von S.Arslan im XHE1 vom Anhänger gekrant.
Entry   Craning for SXP, posted by Orkidia Bilani on 14 Dec 2022, 07:27 
V. Vardanyan asked for the XHCrew support in craning in the SXP experiment hutch. Will meet him on 15.12 for further details.
Entry   Transport XHE1->XHEXP1, posted by Sascha Menzel on 13 Dec 2022, 16:49 8x
HiBEF Parts QR50374, QR50375, QR50373 und QR50372 zum XHE1 transportiert und eingelagert.

Vom XHE1 SCS Parts QR44265, QR49608, QR49609 und QR49620 zur XHEXP1 transportiert und in die SCS Assembly Area gestellt.

 
Entry   HiBEF: Bellows and pipes to give away, posted by Orkidia Bilani on 09 Dec 2022, 13:32 Bellows_and_Pipes.jpg
HiBEF had a Gitterbox with various bellows and pipes to give away.

SQS is now the new owner. :-) Are now stored in SQS labs in the E floor.
Entry   SQS, posted by Orkidia Bilani on 09 Dec 2022, 11:54 SQS_ThermalG_c.jpgSQS_ThermalG_a.jpg
Contacted SQS (N.Rennhack) and suggested solution  for three chemical kanisters "Thermal G for Julabo" located at the entrance of
their hutch.

They have been removed from there, and are now located in the chemicals' storage.
Entry   HiBEF Rack , posted by Orkidia Bilani on 09 Dec 2022, 09:46 Rack_.jpg
A rack to give away from HiBEF has found a new owner , the SQS (N.Rennhack).

 

 
Entry   HiBEF: Waste, posted by Orkidia Bilani on 09 Dec 2022, 09:44 HiBEF_Waste.jpg
A pallet with waste from HiBEF was removed from the hall and disposed.

 

 
Entry   SCS clean tent installation 8.12.2022, posted by Michael Luedeke on 09 Dec 2022, 07:55 20221208_135111.jpg20221208_135102.jpg20221208_150916.jpg20221208_150854.jpg
The big aluminium plate is mounted

The frame of the clean tent is well moving

Some small tasks are missing and will be done next week
Entry   SCS Rack Room, posted by Orkidia Bilani on 08 Dec 2022, 13:12 
The door of the SCS rack room is functional again.

The cause of the SCS rack room door jamming was a piece of cardboard that was inserted into the door latch opening by a person.
That has been removed and the door is working again.
Entry   SCS Rack Room, posted by Orkidia Bilani on 08 Dec 2022, 08:32 
The door of the SCS Rack Room can't open, even when activation with the DACHS card shows a green light. It seems to be stucked.

S.Arslan informed via Redmine Ticket.
Entry   SCS clean tent 7.12.2022, posted by Michael Luedeke on 08 Dec 2022, 07:51 20221207_111414.jpg20221207_120127.jpg20221207_134755.jpg
Preparation top plate part 1 (drilling, cutting, mounting)
Entry   SQS, posted by Orkidia Bilani on 07 Dec 2022, 14:07 
Together with T.Mazza checked the COMO source, which is located in XHE1.

This will be brought back in January in XHEXP1, details will follow in due time.

 
Entry   SCS: Transport (XHE1, XHEXP1), posted by Orkidia Bilani on 07 Dec 2022, 11:16 
Until the end of the year SCS needs back from XHE1 to XHEXP1 the components (QR 44265, QR 49608, QR 49609 and QR 49620).

Further, other components will be stored in the XHE1. Details will follow by next week.

 