Group Selection Page HELP Controls Group Data Analysis Group ITDM WP76 DET Vacuum EEE WP78 WP74 FXE SCS SPB MID HED SQS SXP Sample Environment Operation PSPO XO TS Migrated2Zulip
XHCrew
  XHCrew logbook, Page 5 of 59  Not logged in ELOG logo
New entries since:Thu Jan 1 01:00:00 1970
ID Date Author Locationdown Severity Subject
  108   08 Dec 2022, 08:32 Orkidia BilaniXHEXPInformationSCS Rack Room

The door of the SCS Rack Room can't open, even when activation with the DACHS card shows a green light. It seems to be stucked.

S.Arslan informed via Redmine Ticket.

  109   08 Dec 2022, 13:12 Orkidia BilaniXHEXPInformationSCS Rack Room

The door of the SCS rack room is functional again.

The cause of the SCS rack room door jamming was a piece of cardboard that was inserted into the door latch opening by a person. That has been removed and the door is working again.

  111   09 Dec 2022, 09:44 Orkidia BilaniXHEXPInformationHiBEF: Waste

A pallet with waste from HiBEF was removed from the hall and disposed.

 

 

Attachment 1: HiBEF_Waste.jpg
HiBEF_Waste.jpg
  112   09 Dec 2022, 09:46 Orkidia BilaniXHEXPInformationHiBEF Rack

A rack to give away from HiBEF has found a new owner , the SQS (N.Rennhack).

 

 

Attachment 1: Rack_.jpg
Rack_.jpg
  113   09 Dec 2022, 11:54 Orkidia BilaniXHEXPInformationSQS

Contacted SQS (N.Rennhack) and suggested solution  for three chemical kanisters "Thermal G for Julabo" located at the entrance of their hutch.

They have been removed from there, and are now located in the chemicals' storage.

Coworkers: V. Bazhenov, O. Bilani

 

Attachment 1: SQS_ThermalG_c.jpg
SQS_ThermalG_c.jpg
Attachment 2: SQS_ThermalG_a.jpg
SQS_ThermalG_a.jpg
  114   09 Dec 2022, 13:32 Orkidia BilaniXHEXPInformationHiBEF: Bellows and pipes to give away

HiBEF had a Gitterbox with various bellows and pipes to give away.

SQS is now the new owner. :-) Are now stored in SQS labs in the E floor.

Attachment 1: Bellows_and_Pipes.jpg
Bellows_and_Pipes.jpg
  116   14 Dec 2022, 07:27 Orkidia BilaniXHEXPInformationCraning for SXP

V. Vardanyan asked for the XHCrew support in craning in the SXP experiment hutch. Will meet him on 15.12 for further details.

  119   19 Dec 2022, 12:42 Orkidia BilaniXHEXPInformationUpdate: Stored parts in XHE1

The documentation for the storeed parts in the shaft building XHE1 has been updated and uploaded to Alfresco (see link below):

https://docs.xfel.eu/share/page/site/x-ray-operations/document-details?nodeRef=workspace://SpacesStore/b34eece4-1700-4d93-b546-aff1645a00f8

 

  122   23 Dec 2022, 11:23 Sascha MenzelXHEXPInformationExtension Module Gewicht ermittelt

Das SCS GRD Extension Module-38982 QR49620 mit der Kranwage angekrant um das Gewicht zu ermitteln. 620kg

Attachment 1: Image20221223112747.jpg
Image20221223112747.jpg
  123   02 Jan 2023, 09:14 Orkidia BilaniXHEXPInformationMID pump on the exp. hutch roof

On the roof of the MID exp. hutch one of the pumps is making  strange loud noises (laut zischen). The display is off, same as the other pump close to that (which is switched off).

Contacted/called Andreas Schmidt, he assumed that, that is not good with the pump, but cannot solve the problem because he is in home office today and directed me to A.Bartmann.

Tried to reach A. Bartmann, without success (for the moment).

-----10:15----: Reached A. Bartmann, problem solved. Er hat die Stickstoffleitung ausgestellt.

 

Attachment 1: MiD_pump_roof.jpg
MiD_pump_roof.jpg
  125   05 Jan 2023, 12:51 Sascha MenzelXHEXPInformationVacuumpumpe getauscht

N.Rennhack SQS beim Tausch einer defekten Vacuum Pumpe (laute Geräusche) am Teststand unterstützt.

Attachment 1: Image20230105140559.jpg
Image20230105140559.jpg
Attachment 2: Image20230105140556.jpg
Image20230105140556.jpg
  127   06 Jan 2023, 10:54 Orkidia BilaniXHEXPInformationHED

Contacted S. Göde from HED to remove from the hall the wooden pallet with big empty boxes, currently located in front of the MID hutch. He/his colleagues will do so, and also a big wooden empty box (located next to this pallet)  belongig to HED will get removed from the hall.

Also, talked to him about the coffee corner in front of the HED hutch, which is untidy and still with rest boiled coffee from the last user run and unwashed cups. He will take care of that quite soon.

 

 

Attachment 1: HED_1.jpg
HED_1.jpg
Attachment 2: HED_2.jpg
HED_2.jpg
  128   06 Jan 2023, 12:30 Sascha MenzelXHEXPInformationPC Einschübe

4 PC Einschübe für den Unterbau am Schreibtisch aus Blech geschnitten und gekanntet.

Coworkers: S.Menzel, M.Lüdeke 

Attachment 1: Image20230106123002.jpg
Image20230106123002.jpg
Attachment 2: Image20230106123005.jpg
Image20230106123005.jpg
  130   09 Jan 2023, 11:41 Orkidia BilaniXHEXPInformationHED: Update entry of 06.01.2023

-> The pallet with empty Kartonkisten as well as the other one with the big empty wooden box are removed from the hall (carried out by the HED colleagues).

-> The coffee rests and dirty mugs were cleaned up (carreied out by the HED colleagues).

 

Attachment 1: HED_1_9Jan23.jpg
HED_1_9Jan23.jpg
Attachment 2: HED_2_9Jan23.jpg
HED_2_9Jan23.jpg
  135   10 Jan 2023, 14:50 Sascha MenzelXHEXPInformationPC´s montiert

4 PC´s mit den angefertigten Einschüben unter den Schreibtischen der XO/HallCrew Hütte montiert.

Attachment 1: Image20230110145331.jpg
Image20230110145331.jpg
Attachment 2: Image20230110145334.jpg
Image20230110145334.jpg
Attachment 3: Image20230110145337.jpg
Image20230110145337.jpg
  137   11 Jan 2023, 13:17 Sascha MenzelXHEXPInformationPulser Komponente gekrant

Die Komponenten für den Pulser von der LKW Schleuse in die Halle/XHEXP1 gekrant und den Steiger aus der Halle in die LKW Schleuse gekrant.

 

Coworkers: S.Arslan, S.Menzel

Attachment 1: Image20230111131528.jpg
Image20230111131528.jpg
Attachment 2: Image20230111131532.jpg
Image20230111131532.jpg
Attachment 3: Image20230111131535.jpg
Image20230111131535.jpg
Attachment 4: Image20230111131537.jpg
Image20230111131537.jpg
Attachment 5: Image20230111131540.jpg
Image20230111131540.jpg
Attachment 6: Image20230111131545.jpg
Image20230111131545.jpg
  138   11 Jan 2023, 17:53 Orkidia BilaniXHEXPInformationLights in the Experiment Hall

Lights in the experiment hall needed to be exchanged, and in the SA1 and SA2, three of them were not working.

Torsten Schön was informed already last year, and in the RedMine he replied today following:

"The first row, between northern outer wall and SASE3 has been exchanged with the new lights for testing. The new lights are accepted and ordered. Delivery time 6 weeks at least."

  139   11 Jan 2023, 17:58 Orkidia BilaniXHEXPInformationSQS Support: 19-20.01.2023

SQS requested the following support  from XHCrew:


Thursday and Friday of next week SQS expect to carry on some installation works in their hutch with expected activities:

- To make modifications to an existing frame
- To assemble a new frame
- Support with craning into the hutch of COMO source

 

  140   12 Jan 2023, 08:28 Orkidia BilaniXHEXPInformationWeiss Klimatechnik: acoustic warning signal

In the balcony between SA4 and SA5 an acousitic signal was triggered. It is nothing serious (automatische Wartung, every 300 hours?)  TS gets the notification anyway.

The acoustic signal was muted.

Video file can be found under:   N:\bilani\public

 

  147   18 Jan 2023, 14:29 Sascha MenzelXHEXPInformationPC Einschübe

2 PC Einschübe angefertigt und mit den PC´s unter die Schreibtische montiert, PC´s angeschlossen.

 

Coworkers: S.Menzel, M,Lüdeke 

Attachment 1: Image20230118142913.jpg
Image20230118142913.jpg
Attachment 2: Image20230118142916.jpg
Image20230118142916.jpg
ELOG V3.1.4-7c3fd00