ID |
Date |
Author |
Location |
Severity |
Subject |
108
|
08 Dec 2022, 08:32 |
Orkidia Bilani | XHEXP | Information | SCS Rack Room |
The door of the SCS Rack Room can't open, even when activation with the DACHS card shows a green light. It seems to be stucked.
S.Arslan informed via Redmine Ticket. |
109
|
08 Dec 2022, 13:12 |
Orkidia Bilani | XHEXP | Information | SCS Rack Room |
The door of the SCS rack room is functional again.
The cause of the SCS rack room door jamming was a piece of cardboard that was inserted into the door latch opening by a person. That has been removed and the door is working again. |
111
|
09 Dec 2022, 09:44 |
Orkidia Bilani | XHEXP | Information | HiBEF: Waste |
A pallet with waste from HiBEF was removed from the hall and disposed.
|
Attachment 1: HiBEF_Waste.jpg
|
|
112
|
09 Dec 2022, 09:46 |
Orkidia Bilani | XHEXP | Information | HiBEF Rack |
A rack to give away from HiBEF has found a new owner , the SQS (N.Rennhack).
|
Attachment 1: Rack_.jpg
|
|
113
|
09 Dec 2022, 11:54 |
Orkidia Bilani | XHEXP | Information | SQS |
Contacted SQS (N.Rennhack) and suggested solution for three chemical kanisters "Thermal G for Julabo" located at the entrance of their hutch.
They have been removed from there, and are now located in the chemicals' storage.
Coworkers: V. Bazhenov, O. Bilani
|
Attachment 1: SQS_ThermalG_c.jpg
|
|
Attachment 2: SQS_ThermalG_a.jpg
|
|
114
|
09 Dec 2022, 13:32 |
Orkidia Bilani | XHEXP | Information | HiBEF: Bellows and pipes to give away |
HiBEF had a Gitterbox with various bellows and pipes to give away.
SQS is now the new owner. :-) Are now stored in SQS labs in the E floor. |
Attachment 1: Bellows_and_Pipes.jpg
|
|
116
|
14 Dec 2022, 07:27 |
Orkidia Bilani | XHEXP | Information | Craning for SXP |
V. Vardanyan asked for the XHCrew support in craning in the SXP experiment hutch. Will meet him on 15.12 for further details. |
119
|
19 Dec 2022, 12:42 |
Orkidia Bilani | XHEXP | Information | Update: Stored parts in XHE1 |
The documentation for the storeed parts in the shaft building XHE1 has been updated and uploaded to Alfresco (see link below):
https://docs.xfel.eu/share/page/site/x-ray-operations/document-details?nodeRef=workspace://SpacesStore/b34eece4-1700-4d93-b546-aff1645a00f8
|
122
|
23 Dec 2022, 11:23 |
Sascha Menzel | XHEXP | Information | Extension Module Gewicht ermittelt |
Das SCS GRD Extension Module-38982 QR49620 mit der Kranwage angekrant um das Gewicht zu ermitteln. 620kg |
Attachment 1: Image20221223112747.jpg
|
|
123
|
02 Jan 2023, 09:14 |
Orkidia Bilani | XHEXP | Information | MID pump on the exp. hutch roof |
On the roof of the MID exp. hutch one of the pumps is making strange loud noises (laut zischen). The display is off, same as the other pump close to that (which is switched off).
Contacted/called Andreas Schmidt, he assumed that, that is not good with the pump, but cannot solve the problem because he is in home office today and directed me to A.Bartmann.
Tried to reach A. Bartmann, without success (for the moment).
-----10:15----: Reached A. Bartmann, problem solved. Er hat die Stickstoffleitung ausgestellt.
|
Attachment 1: MiD_pump_roof.jpg
|
|
125
|
05 Jan 2023, 12:51 |
Sascha Menzel | XHEXP | Information | Vacuumpumpe getauscht |
N.Rennhack SQS beim Tausch einer defekten Vacuum Pumpe (laute Geräusche) am Teststand unterstützt. |
Attachment 1: Image20230105140559.jpg
|
|
Attachment 2: Image20230105140556.jpg
|
|
127
|
06 Jan 2023, 10:54 |
Orkidia Bilani | XHEXP | Information | HED |
Contacted S. Göde from HED to remove from the hall the wooden pallet with big empty boxes, currently located in front of the MID hutch. He/his colleagues will do so, and also a big wooden empty box (located next to this pallet) belongig to HED will get removed from the hall.
Also, talked to him about the coffee corner in front of the HED hutch, which is untidy and still with rest boiled coffee from the last user run and unwashed cups. He will take care of that quite soon.
|
Attachment 1: HED_1.jpg
|
|
Attachment 2: HED_2.jpg
|
|
128
|
06 Jan 2023, 12:30 |
Sascha Menzel | XHEXP | Information | PC Einschübe |
4 PC Einschübe für den Unterbau am Schreibtisch aus Blech geschnitten und gekanntet.
Coworkers: S.Menzel, M.Lüdeke |
Attachment 1: Image20230106123002.jpg
|
|
Attachment 2: Image20230106123005.jpg
|
|
130
|
09 Jan 2023, 11:41 |
Orkidia Bilani | XHEXP | Information | HED: Update entry of 06.01.2023 |
-> The pallet with empty Kartonkisten as well as the other one with the big empty wooden box are removed from the hall (carried out by the HED colleagues).
-> The coffee rests and dirty mugs were cleaned up (carreied out by the HED colleagues).
|
Attachment 1: HED_1_9Jan23.jpg
|
|
Attachment 2: HED_2_9Jan23.jpg
|
|
135
|
10 Jan 2023, 14:50 |
Sascha Menzel | XHEXP | Information | PC´s montiert |
4 PC´s mit den angefertigten Einschüben unter den Schreibtischen der XO/HallCrew Hütte montiert. |
Attachment 1: Image20230110145331.jpg
|
|
Attachment 2: Image20230110145334.jpg
|
|
Attachment 3: Image20230110145337.jpg
|
|
137
|
11 Jan 2023, 13:17 |
Sascha Menzel | XHEXP | Information | Pulser Komponente gekrant |
Die Komponenten für den Pulser von der LKW Schleuse in die Halle/XHEXP1 gekrant und den Steiger aus der Halle in die LKW Schleuse gekrant.
Coworkers: S.Arslan, S.Menzel |
Attachment 1: Image20230111131528.jpg
|
|
Attachment 2: Image20230111131532.jpg
|
|
Attachment 3: Image20230111131535.jpg
|
|
Attachment 4: Image20230111131537.jpg
|
|
Attachment 5: Image20230111131540.jpg
|
|
Attachment 6: Image20230111131545.jpg
|
|
138
|
11 Jan 2023, 17:53 |
Orkidia Bilani | XHEXP | Information | Lights in the Experiment Hall |
Lights in the experiment hall needed to be exchanged, and in the SA1 and SA2, three of them were not working.
Torsten Schön was informed already last year, and in the RedMine he replied today following:
"The first row, between northern outer wall and SASE3 has been exchanged with the new lights for testing. The new lights are accepted and ordered. Delivery time 6 weeks at least." |
139
|
11 Jan 2023, 17:58 |
Orkidia Bilani | XHEXP | Information | SQS Support: 19-20.01.2023 |
SQS requested the following support from XHCrew:
Thursday and Friday of next week SQS expect to carry on some installation works in their hutch with expected activities:
- To make modifications to an existing frame
- To assemble a new frame
- Support with craning into the hutch of COMO source
|
140
|
12 Jan 2023, 08:28 |
Orkidia Bilani | XHEXP | Information | Weiss Klimatechnik: acoustic warning signal |
In the balcony between SA4 and SA5 an acousitic signal was triggered. It is nothing serious (automatische Wartung, every 300 hours?) TS gets the notification anyway.
The acoustic signal was muted.
Video file can be found under: N:\bilani\public
|
147
|
18 Jan 2023, 14:29 |
Sascha Menzel | XHEXP | Information | PC Einschübe |
2 PC Einschübe angefertigt und mit den PC´s unter die Schreibtische montiert, PC´s angeschlossen.
Coworkers: S.Menzel, M,Lüdeke |
Attachment 1: Image20230118142913.jpg
|
|
Attachment 2: Image20230118142916.jpg
|
|