Group Selection Page HELP Controls Group ITDM Vacuum WP78 FXE SPB SQS SXP PSPO XO TS Migrated2Zulip Archived2GitlabPages Archived2PDF not2MigrateOrArchive MigratedByGroup
XHCrew
  XHCrew logbook, Page 51 of 72  Not logged in ELOG logo
ID Date Authordown Location Severity Subject
  466   10 Nov 2023, 11:34 Orkidia BilaniXHEXPInformationSPB/SFX Support

With P. Vagovic, SPB/SFX, sorted out components and trash from the hall.

Brought the table and the small box (Pic.1) to their Lab 303.

Discarded the things on the trolley and the black transport box was placed near SEC lab, 400 area (Pic.2).

 

Attachment 1: IMG_20231110_104226_MP.jpg
IMG_20231110_104226_MP.jpg
Attachment 2: IMG_20231110_110437_MP.jpg
IMG_20231110_110437_MP.jpg
  469   10 Nov 2023, 14:38 Orkidia BilaniXHEXPInformationSPB/SFX Support

Together with P. Vagovic, made ready to transport to XHE1 an optical table (QR 49889)  and a detector assembly (QR 49890), and  supported on their XIM entries.

The transport will take place on Monday, 13.11.2023.

 

 

Attachment 1: IMG_20231110_143034_MP.jpg
IMG_20231110_143034_MP.jpg
Attachment 2: IMG_20231110_143058_MP.jpg
IMG_20231110_143058_MP.jpg
  474   14 Nov 2023, 17:51 Orkidia BilaniXHEXPInformationTransport: Vakuum

Two pipe transport trolleys  (QR 44462) were transported from external storage Ütersen to LKW Schleuse from TS colleagues. The third one will be transported tomorrow.

Trolleys brought to the experiment hall and placed in the Vacuum assembly area. 

 

 

Attachment 1: IMG_20231114_174837_MP.jpg
IMG_20231114_174837_MP.jpg
  476   17 Nov 2023, 20:48 Orkidia BilaniXHEXPInformationSXP Support

SXP support yesterday (M. Izquierdo) and today (V.Vardanyans) with practical things :-)

  477   20 Nov 2023, 12:22 Orkidia BilaniXHEXPInformationSPB/SFX Support: Craning

Craned the Julabo chiller up to the rarck room for SPB/SFX.

Co-workers: O. Bilani, M. Peter, Th. Dietze

 

  479   23 Nov 2023, 15:07 Orkidia BilaniXHEXPInformationSPB/SFX: Craning the Julabo chiller

Supported SPB/SFX with craning down the Julabo Chiller from the rack room.

It will be shipped to the manufacturer for repair.

 

Co-workers: O. Bilani, T. Dietze 

Attachment 1: IMG_20231123_123243_MP.jpg
IMG_20231123_123243_MP.jpg
  480   28 Nov 2023, 19:33 Orkidia BilaniXHEXPInformationSQS Support

Supported SQS with carrying the top small cabinets and placing them on the bigger ones.

Co-workers: O. Bilani,  M. Peter, A. Igharas, J. Montano

  481   29 Nov 2023, 19:46 Orkidia BilaniXHEXPInformationSQS Support

Brought Back from XHE1 into the Experiment Hall the "PAM - Chambers".

Co-workers: O. Bilani, H. Heuer

 

Attachment 1: IMG_20231129_133338_MP.jpg
IMG_20231129_133338_MP.jpg
  482   29 Nov 2023, 19:50 Orkidia BilaniXHEXPInformationHiBEF Support

"Montagehilfe für Cryofan" brought down from the Laser room of HED/HiBEF to the assembly area of HiBEF. 

Mounted partly together and will be transported (next week) back to the external storage in Ütersen.

Co-workers: O. Bilani, S. Arslan, J. Hauser

  483   29 Nov 2023, 19:57 Orkidia BilaniXHEXPInformationMID Support

R. Shayduk  wanted urgently the vacuum steel cover and didn't really know its location and QR code.

This was stored  in our Warehouse in September 2022 (G. Ansaldi, O. Smith and O. Bilani) , QR 37702.

Informed Roman about that, and he will pick it up tomorrow in the Warehouse.

  484   30 Nov 2023, 11:23 Orkidia BilaniGeneralInformationDewars

Refilled the following dewars:

#25584 for C. Schmid

#25583 for M. Planas

#25580 for H. Han

  485   01 Dec 2023, 10:25 Orkidia BilaniXHEXPInformationSQS Support

30.11.2023

Supported SQS with grouting in their hutch.

Co-Workers: M. Peter, A. Ihgaras

  486   01 Dec 2023, 10:26 Orkidia BilaniXHEXPInformationNext week

Following instruments need XHCrew support next week:

SQS: transport from LKW Schleuse to the hall (Wednesday 9:30) and craning/assembly activities in the hutch (days not known yet)

SCS: Moving with airpads and mounting of a chamber in their hutch (Tuesday - Wednesday)

FXE: Bring down to the with the forklift their Julabo Chiller from the rack room (Wednesday or Thursday)

VAC: Spetec, Maik and Sascha in XHE3 (measurements/tests for the filter units of the clean tents)  (Monday between 9:00 and 10:00)

  489   06 Dec 2023, 11:35 Orkidia BilaniXHEXPInformationLN2 Dewar

Refilled the LN2 dewar  # 44229 for H. Han.

 

  499   12 Dec 2023, 13:50 Orkidia BilaniXHEXPInformationLN2 Dewars

Refilled dewars #25579 and #25089 for J. Moore and S. Göde respectively.

Co-workers: S. Menzel, O. Bilani

  507   18 Dec 2023, 09:16 Orkidia BilaniGeneralInformationVac: LN2

Filled a LN2 dewar für Vacuum/XRO (for B.Hübner/A. Trapp).

Transport of the empty one from XHE1 to the fill station and then the filled dewar again back to XHE1.

 

Co-workers: O. Bilani, M. Pooch

  513   05 Jan 2024, 10:16 Orkidia BilaniXHEXPProblemSASE1

In SASE1, the Zuluftkanal (near room D.22) has an air leckage (pic.1).

Also on the top of the Präzisionsklimagerät (QR 30585) another air leckage was detected (pic.2).

Contacted and inspected them with D. Tscherwitschka from TS, and he will isolate them with Si by next week.

Co-workers: O.Bilani, F. Siyli, D. Tscherwitschka

Attachment 1: IMG_20240105_084958_MP.jpg
IMG_20240105_084958_MP.jpg
Attachment 2: IMG_20240105_090149_MP.jpg
IMG_20240105_090149_MP.jpg
  514   05 Jan 2024, 13:36 Orkidia BilaniXHEXPInformationSCS Support

SCS Support:

Dismounted and craned the "Chem DPS" from the big "Chem". 

Co-workers: O. Bilani, F. Siyli, JT. Delitz.

Attachment 1: IMG_20240105_114458_MP.jpg
IMG_20240105_114458_MP.jpg
Attachment 2: IMG_20240105_120721_MP.jpg
IMG_20240105_120721_MP.jpg
  521   10 Jan 2024, 11:15 Orkidia BilaniGeneralInformationLN2 Dewars

Refilled LN2 dewars # 25580 and # 25584 for H. Han.

 

Co-workers: XH Crew :-)

  549   07 Feb 2024, 11:06 Orkidia BilaniXHEXPFeedbackHappy birthday Sascha! :-)
ELOG V3.1.4-7c3fd00