XHCrew
  XHCrew logbook, Page 50 of 64  Not logged in ELOG logo
ID Date Authordown Location Severity Subject
  576   01 Mar 2024, 14:05 Orkidia BilaniXHEXPInformationGeneral

-> Stromkabel @SQS:

The yellow and the orange ones was/is on the way in the experiment hall, posing thus a Stolpergefahr. Discussed with N. Rennhack and T. Baumann, the yellow one has been removed.

With the advice of O. Engelmann, the orange one will be shared and plugged in into the distributor with SCS (Oleg already informed SCS about). More details, next week.

-> Removed from the hall the waste originating from one of the empty tunnels.

 

Attachment 1: IMG_20240301_102411_MP.jpg
IMG_20240301_102411_MP.jpg
Attachment 2: IMG_20240301_103222_MP.jpg
IMG_20240301_103222_MP.jpg
Attachment 3: IMG_20240301_135236_MP.jpg
IMG_20240301_135236_MP.jpg
  582   05 Mar 2024, 14:42 Orkidia BilaniXHEXPInformationDamaged concrete floor in SASE3 and SASE2

The damages of the concrete floor in SCS area and SASE3 in general, as well as the damages in SASE2 under the truck bay were discussed with K. Löptien.

The repair from the care takers will start very soon.

 

  590   08 Mar 2024, 15:37 Orkidia BilaniXHEXPInformationSXP Support

SXP wanted to buy and place a cabinet under the stairs in front of their experiment hutch and asked for advice. Unfortunately it wouldn't have worked, because of the narrow and low space/hight under the stairs (Stossgefahr).

In the exp. hutch they do have a (office) cabinet to store their experiment specific parts, which is not so quite allowed. 

I offered them two steel cabinets (which are in the xhcrew consumable storage) which fits their requirements and to the space in their hutch.

Was happily accepted. Next week the removal of the white cabinet from their exp.hutch and replacement with the two steel cabinets will take place.

Also Vahagn and Manuel gave a lot of consumables (screws, nuts, waschers u.Ä) for the xhcrew storage.

 

Attachment 1: IMG_20240308_133712_MP.jpg
IMG_20240308_133712_MP.jpg
Attachment 2: IMG_20240308_132948_MP.jpg
IMG_20240308_132948_MP.jpg
Attachment 3: IMG_20240308_132930_MP.jpg
IMG_20240308_132930_MP.jpg
Attachment 4: IMG_20240308_133016_MP.jpg
IMG_20240308_133016_MP.jpg
Attachment 5: IMG_20240308_133000_MP.jpg
IMG_20240308_133000_MP.jpg
  591   11 Mar 2024, 10:26 Orkidia BilaniXHEXPInformationNot needed consumables

A palett with unneeded consumables was sent to the warehouse and O. Smith will take care of that.

Attachment 1: IMG_20240311_095758_MP.jpg
IMG_20240311_095758_MP.jpg
  597   13 Mar 2024, 15:42 Orkidia BilaniXHEXPInformationSXP: Consumables Storage

V. Vardanyan (SXP) gave a box full of consumables for the consumables storage.

Attachment 1: IMG_20240313_170301_MP.jpg
IMG_20240313_170301_MP.jpg
  598   13 Mar 2024, 21:09 Orkidia BilaniXHEXPInformationConsumables Storage

Sorted out a box with screws, nuts, u.Ä., which was donated from SXP.

  603   15 Mar 2024, 10:57 Orkidia BilaniXHEXPInformationSCS: Consumables Storage

SCS gave a box full of consumables for the consumables storage.

Attachment 1: IMG_20240315_095619_MP.jpg
IMG_20240315_095619_MP.jpg
  607   18 Mar 2024, 08:03 Orkidia BilaniXHEXPInformationWaste in the Experiment Hall

Disposed waste from the Experiment Hall.

Attachment 1: IMG_20240318_075824_MP.jpg
IMG_20240318_075824_MP.jpg
  610   19 Mar 2024, 14:32 Orkidia BilaniXHEXPInformationSCS Transport

Discussed with J.T. Delitz about the transport of their components. He will label the parts and where to be transported. We'll find them tomorrow ready in the hall.

 

  611   20 Mar 2024, 10:55 Orkidia BilaniXHEXPInformationSCS Support: Transport to Warehouse

SCS: Brought a chiller and a pallet with boxes with equipment at the warehouse.

Attachment 1: IMG_20240320_102226_MP.jpg
IMG_20240320_102226_MP.jpg
Attachment 2: IMG_20240320_102653_MP.jpg
IMG_20240320_102653_MP.jpg
  614   22 Mar 2024, 13:47 Orkidia BilaniXHEXPInformationSQS: Emergency craning

Craned for SQS the chain of the manual crane. 

This because the REMI needed to be repaired. 

The core of REMI was craned manually by Rebekka, Ares and Sergey.

They will crane it back to the chamber around 4-5 p.m.

 

Attachment 1: IMG_20240322_111619_MP.jpg
IMG_20240322_111619_MP.jpg
  621   25 Mar 2024, 14:22 Orkidia BilaniXHEXPProblemTerminal at XHEXP1: TH1 near SQS

The transponder system on the turnstile near SQS (TH1)  doesn't work. Informed SRP and they are working on it.

 

  623   27 Mar 2024, 14:06 Orkidia BilaniXHEXPInformationWork on the Consumables' Storage

26.03.2024: Planned and worked on the consumables's storage.

 

O. Bilani, S. Menzel

  629   03 Apr 2024, 08:27 Orkidia BilaniXHEXPInformationHiBEF Waste

Disposed the left over waste from the pulser (Baureste) out of the Experiment Hall.

Co-workers: B.Näser, O.Bilani

Attachment 1: IMG_20240403_081513_MP.jpg
IMG_20240403_081513_MP.jpg
Attachment 2: IMG_20240403_081937_MP.jpg
IMG_20240403_081937_MP.jpg
  635   10 Apr 2024, 08:16 Orkidia BilaniXHEXPInformationWaste

Disposed waste (Brandlast) out of the Experiment Hall.

Attachment 1: IMG_20240410_080713_MP.jpg
IMG_20240410_080713_MP.jpg
  664   26 Apr 2024, 16:19 Orkidia BilaniXHEXPInformationConsumables' storage

The four pallets with consumables, which O.Smith gave, have been all placed ordered in the cabinets of XHCrew consumables' storage.

Brought the empty pallets and boxes back to the warehouse.

 

Attachment 1: IMG_20240426_140309_MP.jpg
IMG_20240426_140309_MP.jpg
Attachment 2: IMG_20240426_140319_MP.jpg
IMG_20240426_140319_MP.jpg
  679   09 May 2024, 14:25 Orkidia BilaniXHEXPInformationSASE3: Dräger, SCS Empore

T. Mazza (SQS) called to inform about an alarm at the Dräger gas cabinet.

Went to quit/mute the alarm (yellow alarm level) took pictures, informed and sent the pics to TS OCD (C. Holz), who will take care tomorrow early in the morning (in case this will not affect the experiment today).

 

Attachment 1: IMG_20240509_105827_MP.jpg
IMG_20240509_105827_MP.jpg
Attachment 2: IMG_20240509_105859_MP.jpg
IMG_20240509_105859_MP.jpg
  680   11 May 2024, 11:39 Orkidia BilaniXHEXPInformationSASE3: Dräger, SCS Empore

The battery for the "Notstromausfall" needs to be exchanged. C.Holz ordered already new ones and will exchange them as soon as they are delivered. 

Attachment 1: IMG_20240511_091631_MP.jpg
IMG_20240511_091631_MP.jpg
  681   11 May 2024, 12:24 Orkidia BilaniXHEXPInformationMID: He 5.0

Moin Sascha,

wie telefonisch besprochen, am Montag früh braucht MID He 5.0. Es sind fünf flaschen beim Gasenlager (nahe Guesthouse) und zwei bei den Stickstoffgitter. Es müssten vielleicht/eventuell (je nach dem was für Experimentzwecke/Experimentverbrauch) alle 2 Stunden welche eingebaut/ausgetauscht in deren Gasschrank. 

Ulrike (sie hat am Montag Frühschicht)  bzw. MID Kollegen werden dir den Druckminderer im Schrank zeigen. Inzwischen sie wird SRP (Vasilii) kontaktieren, dass sie eine Einweisung/Safety vorziehen um später das Flaschenwechsel selbst machen zu können (ab der Zeitpunkt wann Safety gemacht ist/wenn du Feierabend hast, in deren Spät- und Nachtschicht) 

Mehr wirst du am Montag erfahren. 

Lorenz rief um 12:18 an und teilte mit, dass Peter sich bei ihn meldete und zwar auch Peter hätte/kann den Druck nicht höher stellen, es geht nicht. Also bleibt die Flaschenlösung.

LG,

Orkidia

  682   11 May 2024, 13:36 Orkidia BilaniXHEXPInformationSCS: Pumpedisplay

Near the SCS Clean Tent, where the big chamber is, below, on the pump there is a control monitor/display. It peeps and perhpas there is something with that.

 

Attachment 1: IMG_20240511_125033.jpg
IMG_20240511_125033.jpg
Attachment 2: IMG_20240511_125056_MP.jpg
IMG_20240511_125056_MP.jpg