Group Selection Page HELP Controls Group ITDM Vacuum WP78 FXE SPB SQS SXP PSPO XO TS Migrated2Zulip Archived2GitlabPages Archived2PDF not2MigrateOrArchive MigratedByGroup
XHCrew
  XHCrew logbook, Page 50 of 72  Not logged in ELOG logo
Entry   Weiss Klimatechnik: SASE 1, posted by Orkidia Bilani on 09 Jun 2023, 19:04 IMG_20230609_180232_MP.jpgIMG_20230609_180343_MP.jpgIMG_20230609_180614_MP.jpg

@SASE1  an mehreren Weiss Klimatechnik : die Verkleidung der Rohre löst sich (siehe Bilder)

Redmine Ticket sent to D. Tscherwitschka and A. Kondraschew

Entry   Elevator TH2, posted by Orkidia Bilani on 09 Jun 2023, 19:27 

The elevator is functional again.

Talked to the technician from "Lutzaufzüge" and he said that he fixed the bug caused by "short waiting times" during transportations. He set a longer time now.

Entry   Transport from XHE1 to external storage in Ütersen, posted by Orkidia Bilani on 20 Jul 2023, 09:47 

All the parts/components of the instruments, which had to be stored in the external storage in Ütersen, have been transported and labeled there.

Coworkers: O.Bilani, L.Kersting, M. Pooch, H. Heuer.

Entry   Info, posted by Orkidia Bilani on 09 Sep 2023, 13:08 

- Supported HED with N2 and He dewars.

- Very quiet in the hall, and after 12:00 almost nobody around, machine is down.

 

Entry   400 Eintrag: Pfand und Kuchen, posted by Orkidia Bilani on 19 Sep 2023, 13:00 
 
Entry   SQS: Transport to XHE1, posted by Orkidia Bilani on 21 Sep 2023, 08:40 QR51494_51495.jpg

Transport of two granite blocks (QR 51494 and QR 514945) of SQS from XHEXP1 to XHE1.

 

Coworkers: S. Menzel, M. Peter, O. Bilani

Entry   SQS: Transport to XHEXP1, posted by Orkidia Bilani on 22 Sep 2023, 10:45 

Brought back from XHE1 to the experiment hall following parts for SQS:

QR48494 Rack
QR48493 Rack
QR47932 Kabel
QR47938 Kabel

Coworkers: S. Menzel, O. Bilani

Entry   SQS Support in XHEXP1, posted by Orkidia Bilani on 22 Sep 2023, 10:47 

SQS doesn't have many space left in their assembly area. Talked/dealed with the SQS colleagues, and managed to free spaces :-).

The parts/components will be transported to XHE1 and to Ütersen.

Sascha will do the transport to XHE1 on his shift over the weekend. The transport to Ütersen will be done next week.

 

Coworkers: O.Bilani, N. Rennhack, J. Montano, A. Igharas, S. Menzel, S. Dold

 

Entry   Cabinets, posted by Orkidia Bilani on 27 Sep 2023, 13:36 

Kai-Erik Ballak gave for XHCrew consumables storage 5 blue cabinets :-).

 

Entry   SQS: Transport, posted by Orkidia Bilani on 29 Sep 2023, 12:34 

Transport of SQS components:

QR 44455, QR 44458 and QR 49874 from XHEXP1 to XHE1.

QR 45466 from XHE1 back to XHEXP1.

 

Coworkers: O. Bilani, M. Peter, H. Heuer

Entry   MID: LN2 Dewars, posted by Orkidia Bilani on 30 Sep 2023, 11:56 

M. Petrich called in the morning saying that MID needed two more dewars than originally planned.

A. Zouzoulya did write and called that he didn't have access to the LKW Schleuse. So I came as well to support on that and to show him the dewars in the cage, since there were other filled (ohne Schlauch).

When I arrived Sascha was alreaday here and he did fill the two dewars with transferschlauch (#25578 & #25087)  for MID.

 

Entry   Si Oil leakage, posted by Orkidia Bilani on 10 Oct 2023, 18:21 

D. Lomidze and M. Turcato informed that they found the position/place where the silicon oil leakage was coming from. They are on he way to fix the problem.

Entry   SPB/SFX , posted by Orkidia Bilani on 10 Oct 2023, 18:25 

Talked with P. Vagovic to remove from the experiment hall his setup and a table.

He will write a ticket this week, so that we can tranport it to XHE1 or in Ütersen.

 

Entry   SPB/SFX Support: Craning, posted by Orkidia Bilani on 11 Oct 2023, 20:51 

SPB/SFX got a new chiller, which was then craned into the rack room. 

The borrowed chiller (the one they borrowed from SCS) was craned out of the rack room.

Coworkers: O.Bilani, S.Menzel, M. Peter, M. Sikorski, T. Dietze

 

Entry   LKW Schleuse , posted by Orkidia Bilani on 13 Oct 2023, 19:26 IMG_20231013_191509_MP.jpgIMG_20231013_192007_MP.jpg

In the truck bay, the rain water flows underneath  the Rolltor, and it goes directly under the Elektroschrank, where there are cables going down in the Kabelkanal. Put a tissue and a sponge als Dämmung.

On Monday Süleyman will be contacted. 

 

 

Entry   SASE3, posted by Orkidia Bilani on 13 Oct 2023, 21:04 IMG_20231013_205839_MP.jpgIMG_20231013_205912_MP.jpg

In SASE3 one of pipelines of the WeissKlima Technik, are very hot in certain positions. Checked the other pipes of different WeissKlimaTechnik, they do not show any temperature increase (would say similar to the hall temperature).

TS will be informed!

 

Entry   Info, posted by Orkidia Bilani on 14 Oct 2023, 18:01 IMG_20231014_143737_MP.jpg

-> Dicsarded empty boxes from the hall.

-> Sorted out a box with screws and washers which was given from instruments to the HallCrew.

Entry   SCS Support: Craning, posted by Orkidia Bilani on 16 Oct 2023, 16:50 IMG_20231016_141659_MP.jpg

Craned for SCS a component which belonged to Desy users/colleagues.

This will then be transported from SCS back to Desy.

Coworkers: O.Bilani, M.Peter, J.Shima

Entry   SCS Support , posted by Orkidia Bilani on 01 Nov 2023, 09:58 IMG_20231101_084556_MP.jpg

Supported SCS with craning of a shikane.

Co-workers: O.Bilani, JT.Delitz

 

Entry   SQS Support , posted by Orkidia Bilani on 01 Nov 2023, 11:07 IMG_20231030_131455_MP.jpgIMG_20231030_131503_MP.jpg

Discussed with T.Mazza on Monday, 30.10.2023, about storing temporarily in XHE1 the wooden boxes of an equipment they recevied recently. 

They should be stored until the equipment is tested and working, so that if something goes wrong, it can be shipped to the manufacturer with the original Verpackung 

If all fine, they will be disposed, most probably by the end of winter maintenance period.

 

Transport was done!

Co-workers: S.Menzel. O.Bilani, J. Montano

ELOG V3.1.4-7c3fd00