Entry   Joint Cleantent, posted by Orkidia Bilani on 29 Sep 2022, 19:25 

Mr. Ch. Grüner from "Spetec" came to discuss about the build up of the joint clean tent in the Exp.Hall.

He proposed not to use R+K profiles, but their own, since the R+K profiles do not provide a good stability of the cleanroom modules.

We have most of the filter units, so we do not neccessary need to buy all of them (save money).

The instruments will inform about the last filter change (actually is a yearly procedure).

The crane position for the SCS part of the clean tent can be changed (we got confirmation from J-T.Delitz).

In case it will be granted to build the cleantent from "Spetec", we agreed to have only one expert from "Spetec" to build it up, instead of four (saving money), since the entire XHCrew (O.Bilani, S.Menzel, M.Lüdeke)  will work on it.

The time scale is 2-3 weeks to complete the whole mounting and the Inbetriebnahme.

On 30.09 we will go to XHE1 to see the type of the filter units and give this information further to Mr. Ch.Grüner.

Entry   SCS Support, posted by Sascha Menzel on 29 Sep 2022, 16:25 IMG_6911.jpg

Hall Crew unterstützt beim Reinraumzelt Aufbau auf dem Balkon.

 

Coworkers: S.Menzel, C,Broers

Entry   Elevator at TH2, posted by Orkidia Bilani on 29 Sep 2022, 15:52 

Nils Rennhack called because the elevator at TH2 has stopped between the floors.

L. Kersting was immediately informed, and he is taking care to solve the problem.

 

 

Entry   TS Support, posted by Sascha Menzel on 29 Sep 2022, 12:10 

P. Schmidt bat um unterstützung beim Dewars füllen mit flüssigen Stickstoff. 2 Dewars für Vacuum gefüllt.

 

Coworkers: S.Menzel

Entry   Hall Organization Meeting, posted by Orkidia Bilani on 29 Sep 2022, 10:39 

-> FXE:  mentioned, as two days ago, that they will need support on 10.10 for craning of the Kappa Goniometer: Hall Crew will try to find the best solution for that and organize a meeting between FXE, HallCrew and S. Arslan.

              They asked if we know when can they have He again, but we made it clear that XHCrwe doesn't have any news about that and we are not the point of contact for gases.

 

-> SXP: support on finishing the building up of the Frame for the  Momentum Microscope (Tuesday 4.10.2022). V. Vardanyan was aksed to start mounting early in the morning and HallCrew will join for support at 10:00 am.

              needs support on craning a pump (details on what and when exactly will follow).

 

-> PLA: must/have to drill few holes for the central pressurized air into the pillars (Säule) in the exp.hall. Since they must drill only on mondays (when there is no beam and the measurements do not get disturbed from vibrations) and 3.10 is a holyday, they asked for  permission to drill on Tuesday  (4.10), but not the entire day.

            FXE. HED, SQS and SCS do not see a problem on that. Other Instruments still to be asked.

 

-> The instruments' representative were informed that from 10.10 - 15.10 only M. Lüdeke is present from XHCrew and the week after, 17.10 - 21.10 no member of XHCrew is there due to vacation/training. O.Bilani will check anyway regularly the emails and will be telefonisch erreichbar in any case and reminded the colleagues to keep the hall free from any chaos, danger and waste.

 

 

 

 

Entry   SCS Support, posted by Sascha Menzel on 28 Sep 2022, 18:54 

Transport von R+K Lieferung (diverse Profile) aus dem Warehouse in die Halle (XHEXP1 Balkon) und Paletten / Verpackung entsorgt.

 

Coworkers: M.Lüdeke, C.Broers

Entry   R+K Regal fuer SQS weiter komplettiert, posted by Sascha Menzel on 28 Sep 2022, 18:52 

Seitenteil und Deckel für das R+K Regal (SQS) montiert.

 

Coworkers: M.Lüdeke, S.Menzel

Entry   Regal fuer die Hall Crew Huette fertig gestellt, posted by Sascha Menzel on 28 Sep 2022, 18:48 IMG_6908.jpg

Rückwand vom Regal für die Hall Crew Hütte befestiegt und das Regal in der Hütte aufgestellt..

 

Coworkers: S.Menzel, M.Lüdeke

Entry   SQS: Support, posted by Orkidia Bilani on 28 Sep 2022, 13:44 

Yevheniy sent a ticket to XO Transport, as following:

"Hi   Hall Crew, 
We would like to transport from experimental hall to XHE1 the following
components:

-> Cluster source  with QR44455 
-> The DSSC components: QR 47932,  QR 47938, QR48494, QR48493

-> The big CF300 VAT valve for the DSSC experiments with QR44459

-> The pnCCD rack with QR5802 "

 

He was supported with the Ticket, QR and the XIM.

The transport will be carried out next week.

(A big laser table can also be stored to XHE1. T.Mullins will let know by latest end of the week.)

Coworkers: Y. Ovcharenko, O. Bilani

 

Entry   FXE Support, posted by Orkidia Bilani on 27 Sep 2022, 20:15 

FXE (P.Frankenberger, M.Knoll)  needs our support on craning Kappa Goniometer (ca.180kg) and attaching it into the beamline. Since the space is quite limited, one would need a special crane (the manual one that HiBEF has left to HallCrew to be used by all instruments when needed, which unfortunately, due to a leak problem, is out of service; the talk between S.Arslan and T. Toncian is still pending).

The support is needed on 10.10.2022, where only M.Lüdeke is available from Hall Crew and maybe P.Zalden from FXE (all the rest are on vacation).

We will discuss on Tuesday, 4.10., with S. Arslan to find a solution on time.

 

Entry   SQS: Transport to XHE1, posted by Orkidia Bilani on 27 Sep 2022, 17:32 

SQS asks for support to transport from Experimental Hall to XHE1 the following components:

-> Cluster source  with QR44455
-> The DSSC components: QR 47932,  QR 47938

Yevheniy will clairify, if  the racks with QR 47938 and  QR47932 (part of DSSC), have to be transported to XHE1 or not.

Coworkers: O.Bilani, Y. Ovcharenko

Entry   2 Dewars gefuellt, posted by Sascha Menzel on 27 Sep 2022, 16:46 

Am 26.09.2022 um 09:00 Uhr -> (TS Peter Schmidt bat um Unterstützung) 2 Dewars mit Flüssigstickstoff für Vasilii gefüllt.

 

Coworkers: S.Menzel 

Entry   Regal für Hall Crew Huette angepasst, posted by Sascha Menzel on 27 Sep 2022, 16:37 IMG_6906.jpg

Ein Holzregal was in die Hall Crew Hütte soll, mittels einer Stichsäge ausgesägt damit es wegen dem Kabelkanal ganz an die Wand passt.

 

Coworkers: S.Menzel, M.Lüdeke

Entry   Aluminiumplatten für das SQS Regal montiert, posted by Sascha Menzel on 27 Sep 2022, 16:33 IMG_6905.jpg

Aluminiumplatten an das R+K Regal für SQS montiert.

 

Coworkers: S.Menzel, M.Lüdeke

Entry   SQS Support, posted by Sascha Menzel on 26 Sep 2022, 15:23 

Granitsteine (wo der 1D XUV spectrometer drauf steht) mittels Hutch-Kran versetzt.

Coworkers: Th.Baumann, O.Bilani, M.Lüdeke, S.Menzel

Entry   SQS Support, posted by Orkidia Bilani on 22 Sep 2022, 19:44 sqs_22Sept2022_a.jpgsqs_22Sept2022_b.jpgsqs_22Sept2022_c.jpgsqs_22Sept2022_d.jpgsqs_22Sept2022_.jpg

SQS support:

-> Completed the building up of the vacuum pump and mounted it in the beamline (pic.a and b).

-> Craned and mounted (attached) the 1D XUV spectrometer (from Uppsala) into the beamline (pic.c and d).

 

Coworkers: O,Bilani, Th. Baumann, J. Montano

 

Entry   Hall Crew Techniker Fortbildung Fraesen , posted by Sascha Menzel on 22 Sep 2022, 17:14 11x

Vom 19.09.2022 bis 23.09.2022

Hall Crew Techniker zur Fortbildung (Fräsen) beim bfw (Berufsfortbildungswerk) siehe Bilder und Video.

Coworkers: S.Menzel, M.Lüdeke

Entry   SQS support, posted by Orkidia Bilani on 21 Sep 2022, 15:47 sqs_21Sept2022.jpg

SQS supported on building up and preparing for mounting the vacuum pump (see pic below).

Work on going...

Coworkers: O,Bilani, J. Montano

Entry   Gas cabinets: TüV, posted by Orkidia Bilani on 20 Sep 2022, 14:52 

Tobias Bartsch wird bis ende nächste Woche die Gasschränke in SA1 and SA3 prüfen (die TüVs sind fällig).

Entry   SQS support, posted by Orkidia Bilani on 19 Sep 2022, 15:26 sqs_19Sept2022.jpg

Support of the SQS with:

- dismounting of coils in the big coils' frame

- Tischfuss: brought into the workshop (M. Schrage)  two times  (gefräst 0.2mm and then again 0.1mm more)

- AQS chamber, dismounted, craned and mounted/attached  to another chamber

- Tomorrow more...

 

Coworkers: T. Baumann, J. Montano, A. de Fanis, O. Bilani