ID |
Date |
Author |
Location |
Severity |
Subject |
113
|
09 Dec 2022, 11:54 |
Orkidia Bilani | XHEXP | Information | SQS |
Contacted SQS (N.Rennhack) and suggested solution for three chemical kanisters "Thermal G for Julabo" located at the entrance of their hutch.
They have been removed from there, and are now located in the chemicals' storage.
Coworkers: V. Bazhenov, O. Bilani
|
Attachment 1: SQS_ThermalG_c.jpg
|
|
Attachment 2: SQS_ThermalG_a.jpg
|
|
114
|
09 Dec 2022, 13:32 |
Orkidia Bilani | XHEXP | Information | HiBEF: Bellows and pipes to give away |
HiBEF had a Gitterbox with various bellows and pipes to give away.
SQS is now the new owner. :-) Are now stored in SQS labs in the E floor. |
Attachment 1: Bellows_and_Pipes.jpg
|
|
116
|
14 Dec 2022, 07:27 |
Orkidia Bilani | XHEXP | Information | Craning for SXP |
V. Vardanyan asked for the XHCrew support in craning in the SXP experiment hutch. Will meet him on 15.12 for further details. |
119
|
19 Dec 2022, 12:42 |
Orkidia Bilani | XHEXP | Information | Update: Stored parts in XHE1 |
The documentation for the storeed parts in the shaft building XHE1 has been updated and uploaded to Alfresco (see link below):
https://docs.xfel.eu/share/page/site/x-ray-operations/document-details?nodeRef=workspace://SpacesStore/b34eece4-1700-4d93-b546-aff1645a00f8
|
123
|
02 Jan 2023, 09:14 |
Orkidia Bilani | XHEXP | Information | MID pump on the exp. hutch roof |
On the roof of the MID exp. hutch one of the pumps is making strange loud noises (laut zischen). The display is off, same as the other pump close to that (which is switched off).
Contacted/called Andreas Schmidt, he assumed that, that is not good with the pump, but cannot solve the problem because he is in home office today and directed me to A.Bartmann.
Tried to reach A. Bartmann, without success (for the moment).
-----10:15----: Reached A. Bartmann, problem solved. Er hat die Stickstoffleitung ausgestellt.
|
Attachment 1: MiD_pump_roof.jpg
|
|
124
|
04 Jan 2023, 14:42 |
Orkidia Bilani | General | Information | VAC - Hera clean tent lamellen |
Bianca (VAC) wanted some of the Hera clean tent curtains (currently in XHE1) here in campus (in order to make a Gehäuse for the dewars, sie hatte schon mit Lorenz darüber gesprochen).
Went together there and brought 15 pieces here, stored now in the VAC lab.
|
127
|
06 Jan 2023, 10:54 |
Orkidia Bilani | XHEXP | Information | HED |
Contacted S. Göde from HED to remove from the hall the wooden pallet with big empty boxes, currently located in front of the MID hutch. He/his colleagues will do so, and also a big wooden empty box (located next to this pallet) belongig to HED will get removed from the hall.
Also, talked to him about the coffee corner in front of the HED hutch, which is untidy and still with rest boiled coffee from the last user run and unwashed cups. He will take care of that quite soon.
|
Attachment 1: HED_1.jpg
|
|
Attachment 2: HED_2.jpg
|
|
130
|
09 Jan 2023, 11:41 |
Orkidia Bilani | XHEXP | Information | HED: Update entry of 06.01.2023 |
-> The pallet with empty Kartonkisten as well as the other one with the big empty wooden box are removed from the hall (carried out by the HED colleagues).
-> The coffee rests and dirty mugs were cleaned up (carreied out by the HED colleagues).
|
Attachment 1: HED_1_9Jan23.jpg
|
|
Attachment 2: HED_2_9Jan23.jpg
|
|
138
|
11 Jan 2023, 17:53 |
Orkidia Bilani | XHEXP | Information | Lights in the Experiment Hall |
Lights in the experiment hall needed to be exchanged, and in the SA1 and SA2, three of them were not working.
Torsten Schön was informed already last year, and in the RedMine he replied today following:
"The first row, between northern outer wall and SASE3 has been exchanged with the new lights for testing. The new lights are accepted and ordered. Delivery time 6 weeks at least." |
139
|
11 Jan 2023, 17:58 |
Orkidia Bilani | XHEXP | Information | SQS Support: 19-20.01.2023 |
SQS requested the following support from XHCrew:
Thursday and Friday of next week SQS expect to carry on some installation works in their hutch with expected activities:
- To make modifications to an existing frame
- To assemble a new frame
- Support with craning into the hutch of COMO source
|
140
|
12 Jan 2023, 08:28 |
Orkidia Bilani | XHEXP | Information | Weiss Klimatechnik: acoustic warning signal |
In the balcony between SA4 and SA5 an acousitic signal was triggered. It is nothing serious (automatische Wartung, every 300 hours?) TS gets the notification anyway.
The acoustic signal was muted.
Video file can be found under: N:\bilani\public
|
149
|
18 Jan 2023, 14:37 |
Orkidia Bilani | XHEXP | Information | Updated Inventory List of the Stored Parts in XHE1 |
Inventory of the parts and components stored in XHE1 has been updated and uploaded into the Alfresco page of XO:
https://docs.xfel.eu/share/page/site/x-ray-operations/document-details?nodeRef=workspace://SpacesStore/895aab2e-f0fe-4167-adff-f938f7a12235 |
175
|
09 Feb 2023, 15:02 |
Orkidia Bilani | XHEXP | Information | XHE1 Organization |
Went with Lorenz to XHE1 and discussed the structuring of XHE1 and the future Lagerhalle in Ütersen. The few empty boxes of the instruments as well as parts/materials which will not be used within 1 year by the instruments, will be placed in the new Lagerhalle in Ütersen.
Waste and unknown stuff in XHE1, which is there before XHCrew time will be sorted out by TS.
In the still Außerlager near Campus recently there is one Werkzeugschrank dazu gekommen. This we will take on Tusday, 14.02 for the Storage Center of Consumables under XHCrew hutch. |
176
|
09 Feb 2023, 15:15 |
Orkidia Bilani | XHEXP | Information | MID Support |
MID (K.Sukharnikov) asked for our support for the Change of Configuration in their hutch. This will take place next week Thursday, 16.02.2023 after the Hall Organization Meeting (around 10:15) |
177
|
13 Feb 2023, 10:11 |
Orkidia Bilani | XHEXP | Information | Cabinet from EEE |
We got a cabinet from EEE which would be brought in the consumables' storage under the XHCrew hutch.
They will give us two more in the near future.
Thanks to: Kai-Erik Ballak and Patrick Geßler |
Attachment 1: Schrank_1.jpg
|
|
178
|
13 Feb 2023, 13:03 |
Orkidia Bilani | XHEXP | Information | Cainet brought into the XHEXP1 |
The cabinet is now in the consumables' storage under the XHCrew hutch.
Co-workers: M.Lüdeke, O. Bilani |
190
|
17 Feb 2023, 11:56 |
Orkidia Bilani | XHEXP | Information | Transport to XHE1 |
The "Gestelle" of the Vacuum group transported to XHE1: QR: 44460 and QR 44462 (3x).
Co-workers: H.Heuer, M. Pooch, O.Bilani |
Attachment 1: VAC_3.jpg
|
|
Attachment 2: VAC_4.jpg
|
|
191
|
20 Feb 2023, 10:05 |
Orkidia Bilani | XHEXP | Information | SCS: Craning |
Supported SCS in their hutch: craned the DSSC Detector and mounted it on the final operation position.
Coworkers: S.Menzel, O.Bilani, JT. Delitz. L. Le Guyader
|
Attachment 1: Image20230220095950.jpg
|
|
Attachment 2: Image20230220095953.jpg
|
|
Attachment 3: Image20230220095956.jpg
|
|
213
|
08 Mar 2023, 09:47 |
Orkidia Bilani | XHEXP | Information | FXE Support |
Went with Mykola to XHE1, checking the content of two FXE stored boxes.
The two boxes can be (not final yet) disposed.
|
214
|
09 Mar 2023, 14:03 |
Orkidia Bilani | XHEXP | Information | FXE Support |
Information from Mykola: The wooden boxes can be disposed. |