Group Selection Page HELP Controls Group Data Analysis Group ITDM WP76 DET Vacuum EEE WP78 WP74 FXE SCS SPB MID HED SQS SXP Sample Environment Operation PSPO XO TS Migrated2Zulip
XHCrew
  XHCrew logbook, Page 43 of 59  Not logged in ELOG logo
ID Date Authordown Location Severity Subject
  60   07 Oct 2022, 11:04 Orkidia BilaniXHEXPInformationHall Crew from 10.10 - 23.10.2022

Next week, 10.10 - 14.10.2022 only one Hall Crew member, M.Lüdeke,  will be here. S.Menzel will be on vacation.

On 17.10  - 23.10.2022 Hall Crew is not there. M.Lüdeke and S.Menzel will attend a training

O.Bilani will the whole two weeks on vacation, but always verfügbar.

 

 

  68   26 Oct 2022, 13:45 Orkidia BilaniGeneralInformationUpdate of the Inventory List: Parts stored in XHE1

The latest/updated inventory list of the parts and components stored in the shaft building XHE1 can be found in Alfresco under:

https://docs.xfel.eu/share/page/site/x-ray-operations/document-details?nodeRef=workspace://SpacesStore/502fb8d6-d305-4447-b4f5-fc34f479ca64

 

  69   27 Oct 2022, 07:54 Orkidia BilaniXHEXPInformationWeissklima Technik at SA2

An acustic warning singal was triggered  at the Weissklima Technik unit (QR 30755) at SA2- On the display: Nicht dringende Störung.

Acustic signal has been muted, TS will check.

 

 

Attachment 1: SA2_WeissklimaTechnik.jpg
SA2_WeissklimaTechnik.jpg
  70   28 Oct 2022, 10:58 Orkidia BilaniXHEXPInformationSCS Support

Supported J.Schlappa, SCS, with the transport of a big dewar to their exp.hutch.

  74   02 Nov 2022, 14:40 Orkidia BilaniXHEXPInformationSQS support

Discussed by the end of September with T.Mullins and D. Rivas, to remove the laser tables from the exp.hall area, in case they won't be needed anymore.

Today we supported SQS in dismountig and removing these tables (1*2 m²) from the exp.hall.

Coworkers: O.Bilani, S. Menzel, D. Rivas, J. Monotano

  81   11 Nov 2022, 07:36 Orkidia BilaniXHEXPInformationHall Organization Meeting

Hall Organization Meeting on 10.11.2022:

- Only SPP/SFX and SCS were present.

- FXE didn't have time, but reported via email.

- SCS, JT.Delitz wanted support with the dismounting of a clean tent frame which was laying in their assembly area; Also support is needed for building up a cleantent in the SCS hutch.

- SPB/SFX, T. Dietze: support on removing a big optical table, which is taking space in their assembly area. A crane and a forklifter are needed, so XHCrew will coordinate this with S.Arslan. Nadja will write to us about details.

 

  83   11 Nov 2022, 15:19 Orkidia BilaniXHEXPInformationSQS: Transport from XHE1 to XHEXP1

Y. Ovcharenko wrote a Redmine Ticket to XO Transport:

The DSSC components: QR 47932,  QR 47938, QR48494 should be brought back to XHEXP1. Already booked the transporter for Thursday 17.11.2022.

  86   15 Nov 2022, 12:58 Orkidia BilaniXHEXPInformationSQS: "Igel" Kammer

M. Ilchen (with Desy Transport) removed the "Igel" chamber from the exp.hall and brought it to Desy back.

 

 

  90   16 Nov 2022, 10:02 Orkidia BilaniXHEXPInformationTransport from XHEXP1 to XHE1 and back: 17.11.2022

SPB/SFX: Transport of a big optical table from the exp.hall  to XHE1. Alreaday craned from XHCrew and S.Arslan and is now in the LKW Schleuse.

HiBEF: J. Hauser wants a component back in the exp.hall. (Will come back today with other parts to be stored in the XHE1, needs support with XIM). The other components would be transported in another day to XHE1).

 

 

 

Attachment 1: Image20221116140100.jpg
Image20221116140100.jpg
  97   24 Nov 2022, 10:38 Orkidia BilaniXHEXPInformationSCS Support

A zoom discussion with A. Reich from SCS.

SCS needs the support of the XHCrew starting from monday afternoon next week, in craning in their hutch the plates for the cleanroom. Also in building up the clean room in their hutch, our support is asked.

Further detIails will be discussed on monday in person.

  98   28 Nov 2022, 11:38 Orkidia BilaniXHEXPInformationPulserraum: HiBEF

C.Bähtz needs a temporary space in the hall, to place the materials (5 palltes and a 4m long frame) which be used during the buildiing up of the Pulserraum.

Delivery expected latest in January 2023.

Since no space is given without making space, he together with J.Hauser will sort out and remove from the hall parts and materials which are no longer needed there. :-)

 

 

  99   29 Nov 2022, 08:06 Orkidia BilaniXHEXPInformationTS

TS (A.Kondraschew, D. Tscherwitschka) contacted for temporarily space in the hall.

They need to place the materials which will be used during the maintanance period. Currently these are located near and under the stairs of the XHVrew Hutch.

  103   07 Dec 2022, 11:07 Orkidia BilaniXHEXPInformationXHCrew Hutch

Under the XHallCrew office  lights have been installed and are functional.

Attachment 1: Lights_xhcrew_hutch.jpg
Lights_xhcrew_hutch.jpg
  104   07 Dec 2022, 11:09 Orkidia BilaniXHEXPInformationHiBEF

HiBEF colleauges (mainly J.Hauser) are cleaning up the spaces from the materials which no longer are needed in the hall.

They are preparing a 1-2 pallets with waste.

Many components will be stored in the shaft building XHE1 (will support them  wth Redmine Ticket and QR codes).

Meanwhile the "Montagehilfe für Cryofan" QR 47620 has been used and can be brought back to XHE1.

 

  105   07 Dec 2022, 11:16 Orkidia BilaniXHEXPInformationSCS: Transport (XHE1, XHEXP1)

Until the end of the year SCS needs back from XHE1 to XHEXP1 the components (QR 44265, QR 49608, QR 49609 and QR 49620).

Further, other components will be stored in the XHE1. Details will follow by next week.

 

  106   07 Dec 2022, 14:07 Orkidia BilaniXHEXPInformationSQS

Together with T.Mazza checked the COMO source, which is located in XHE1.

This will be brought back in January in XHEXP1, details will follow in due time.

 

 

  108   08 Dec 2022, 08:32 Orkidia BilaniXHEXPInformationSCS Rack Room

The door of the SCS Rack Room can't open, even when activation with the DACHS card shows a green light. It seems to be stucked.

S.Arslan informed via Redmine Ticket.

  109   08 Dec 2022, 13:12 Orkidia BilaniXHEXPInformationSCS Rack Room

The door of the SCS rack room is functional again.

The cause of the SCS rack room door jamming was a piece of cardboard that was inserted into the door latch opening by a person. That has been removed and the door is working again.

  111   09 Dec 2022, 09:44 Orkidia BilaniXHEXPInformationHiBEF: Waste

A pallet with waste from HiBEF was removed from the hall and disposed.

 

 

Attachment 1: HiBEF_Waste.jpg
HiBEF_Waste.jpg
  112   09 Dec 2022, 09:46 Orkidia BilaniXHEXPInformationHiBEF Rack

A rack to give away from HiBEF has found a new owner , the SQS (N.Rennhack).

 

 

Attachment 1: Rack_.jpg
Rack_.jpg
ELOG V3.1.4-7c3fd00