Entry   Messpunkte überklebt, posted by Sascha Menzel on 15 Jun 2023, 19:06 Image20230615185747.jpg

Dieverse Messpunkte am Boden in der Halle mit Klebeband überklebt.

Entry   Messpunkte vom Storage bis zu SCS, posted by Paul Schoenborn on 16 Sep 2024, 14:29 

Messpunkte vom Storage bis zu SCS mit neuem Warnklebeband überklebt nachdem das alte beschädigt war.

Entry   Messpunkte am Hallenboden überklebt., posted by Sascha Menzel on 16 Sep 2022, 11:27 IMG_6860.jpg

Die Messpunkte am Hallenboden dür den Transport von Kammern mit Luftkissen (Newport) gereinigt und neu überklebt.

Coworkers: M.Lüdeke, S.Menzel

Entry   Materialgewinnung, posted by Benjamin Wolf on 20 Feb 2025, 17:56 

R und K Profile eines alten Reinraumzeltes zerlegt und die Materialien dem Bestand zugeführt.

Entry   Manual red Crane, posted by Orkidia Bilani on 04 Oct 2022, 14:29 Manual_Crane.jpg

The manual red crane (from HiBEF) was tested and it WORKS!

Nevertheless an external specialist will take care for the Inbetriebnahme/Zulassung  very soon (S.Arslan will contact him).

Instruments (FXE, HiBEF, HED) happy about it

Entry   MID: LN2 Dewars, posted by Orkidia Bilani on 30 Sep 2023, 11:56 

M. Petrich called in the morning saying that MID needed two more dewars than originally planned.

A. Zouzoulya did write and called that he didn't have access to the LKW Schleuse. So I came as well to support on that and to show him the dewars in the cage, since there were other filled (ohne Schlauch).

When I arrived Sascha was alreaday here and he did fill the two dewars with transferschlauch (#25578 & #25087)  for MID.

 

Entry   MID: He 5.0, posted by Orkidia Bilani on 11 May 2024, 12:24 

Moin Sascha,

wie telefonisch besprochen, am Montag früh braucht MID He 5.0. Es sind fünf flaschen beim Gasenlager (nahe Guesthouse) und zwei bei den Stickstoffgitter. Es müssten vielleicht/eventuell (je nach dem was für Experimentzwecke/Experimentverbrauch) alle 2 Stunden welche eingebaut/ausgetauscht in deren Gasschrank. 

Ulrike (sie hat am Montag Frühschicht)  bzw. MID Kollegen werden dir den Druckminderer im Schrank zeigen. Inzwischen sie wird SRP (Vasilii) kontaktieren, dass sie eine Einweisung/Safety vorziehen um später das Flaschenwechsel selbst machen zu können (ab der Zeitpunkt wann Safety gemacht ist/wenn du Feierabend hast, in deren Spät- und Nachtschicht) 

Mehr wirst du am Montag erfahren. 

Lorenz rief um 12:18 an und teilte mit, dass Peter sich bei ihn meldete und zwar auch Peter hätte/kann den Druck nicht höher stellen, es geht nicht. Also bleibt die Flaschenlösung.

LG,

Orkidia

Entry   MID: Consumables for the XHCrew Storage, posted by Orkidia Bilani on 04 Nov 2024, 14:21 IMG_20241104_125740_HDR.jpgIMG_20241104_130955_HDR.jpgIMG_20241104_125752_HDR.jpg

A. Schmidt donated consumables for the XHCrew storage. To be placed in the cabinets during the week.

Entry   MID: Consumables for the XHCrew Storage, posted by Orkidia Bilani on 24 Jan 2025, 10:53 

MID (A. Schmidt) donated consumables for the XHCrew Storage.

Sorted out and placed in the respective drawers.

Co-Workers: B. Wolf; K-E- Pfeiffer; O. Bilani

Entry   MID support, posted by Frank Siyli on 19 Feb 2024, 14:37 IMG_4747.jpgIMG_4749.jpg

Support for Gabriele Ansaldi.

Switched mounting direction of the adapter plate and mounted the component on the MDS_2.

Coworkers: Gabriele Ansaldi, Frank Siyli

 

Entry   MID pump on the exp. hutch roof, posted by Orkidia Bilani on 02 Jan 2023, 09:14 MiD_pump_roof.jpg

On the roof of the MID exp. hutch one of the pumps is making  strange loud noises (laut zischen). The display is off, same as the other pump close to that (which is switched off).

Contacted/called Andreas Schmidt, he assumed that, that is not good with the pump, but cannot solve the problem because he is in home office today and directed me to A.Bartmann.

Tried to reach A. Bartmann, without success (for the moment).

-----10:15----: Reached A. Bartmann, problem solved. Er hat die Stickstoffleitung ausgestellt.

 

Entry   MID Support , posted by Orkidia Bilani on 29 Nov 2023, 19:57 

R. Shayduk  wanted urgently the vacuum steel cover and didn't really know its location and QR code.

This was stored  in our Warehouse in September 2022 (G. Ansaldi, O. Smith and O. Bilani) , QR 37702.

Informed Roman about that, and he will pick it up tomorrow in the Warehouse.

Entry   MID Support, posted by Orkidia Bilani on 09 Feb 2023, 15:15 

MID (K.Sukharnikov)  asked for our support for the Change of Configuration in their hutch. This will take place next week Thursday, 16.02.2023 after the Hall Organization Meeting (around 10:15)

Entry   MID Support, posted by Sascha Menzel on 14 Feb 2023, 13:58 Image20230214135148.jpgImage20230214141444.jpgImage20230214141638.jpgImage20230214135151.jpg

MID unterstüzt beim abkoppeln/abschrauben der Strahl (Bellow) leitung  und diese anschließend verschoben. Den Mamorboden zum schutz mit Gummibelag ausgelegt und die neue Strahlleitung für das anschließen vorbereitet.

Die Arbeiten werden am 15.02 ab 10:00 fortgeführt.

 

Coworkers: K.Sukharnikov, A.Bartmann, O.Biliani, S.Menzel, M.Lüdeke

Entry   MID Support, posted by Sascha Menzel on 22 Feb 2023, 14:27 Image20230222142713.jpgImage20230222142717.jpgImage20230222142719.jpg

G.Ansaldi beim Aufbau des R+K Gestell für das SDL-LiquidJet Project unterstützt.

Coworkers: O.Bilani, G.Ansaldi, S.Menzel

Entry   MID Support, posted by Sascha Menzel on 27 Feb 2023, 17:22 Image20230214135151.jpgImage20230214141638.jpgImage20230227172015.jpg

MID unterstüzt beim hochklappen der Strahlleitung, danach den Gummibelag vom Marmorboden entfernt und den Bellow wieder verschoben.

Coworkers: G.Ansaldi, O.Bilani, S.Menzel

Entry   MID Support, posted by Sascha Menzel on 28 Feb 2023, 13:52 Image20230228135022.jpgImage20230228135034.jpg

MID unterstüzt bei der Montage des PINK Modul und das Gestell SDL-LiquidJet Project in deren Hutch.

Cowokers: G.Ansaldi, S.Menzel

Entry   MID Support, posted by Sascha Menzel on 22 Mar 2023, 13:59 Image20230322135856.jpg

An einem frame an den unteren Seiten 4 Luftkissen montiert.

Coworkers: G.Ansaldi, O.Bilani, S.Menzel

Entry   MID Support, posted by Sascha Menzel on 28 Mar 2023, 20:22 Image20230328202813.jpgImage20230328202816.jpgImage20230328202819.jpg

Am Rahmen von MID zwei Laufschienen montiert und diverse Bolzen nachgefeilt anschließend 4 Gleitstücke mit Öl befüllt und auf die Schienen montiert, sowie 2 Gleitstücke mit pneumatischer Bremse.

Coworkers: G.Ansaldi, S.Menzel 

Entry   MID Support, posted by Sascha Menzel on 31 Mar 2023, 17:18 Image20230331172324.jpg

Die Gleitschienen und die Gleitstücke auf dem Rahmen um eine Bohrung verschoben, den Ramen mittels Hallenkran von der Palette gekrant und danach den großen mobilen Kompressor an die vier Luftkissen angeschossen um deren Funktion zu prüfen. Nach erfolgreicher Prüfung den Rahmen wieder auf die Palette gekrant.

Coworkers: G.Ansaldi, O.Bilani, S.Menzel