Group Selection Page HELP Controls Group Data Analysis Group ITDM WP76 DET Vacuum EEE WP78 WP74 FXE SCS SPB MID HED SQS SXP Sample Environment Operation PSPO XO TS Migrated2Zulip
XHCrew
  XHCrew logbook, Page 39 of 59  Not logged in ELOG logo
Entry   LKW abgeladen, posted by Sascha Menzel on 24 Feb 2025, 10:25 Image20250224102409.jpgImage20250224102412.jpg

Einen LKW mit R+K Lieferung (MID Schwerlasttisch & SQS Überstieg) mit dem Gabestapler abgeladen.

Entry   LKW Schleuse , posted by Orkidia Bilani on 13 Oct 2023, 19:26 IMG_20231013_191509_MP.jpgIMG_20231013_192007_MP.jpg

In the truck bay, the rain water flows underneath  the Rolltor, and it goes directly under the Elektroschrank, where there are cables going down in the Kabelkanal. Put a tissue and a sponge als Dämmung.

On Monday Süleyman will be contacted. 

 

 

Entry   Kunststoffboxen eingelagert, posted by Sascha Menzel on 11 Dec 2023, 07:37 Image20231211072626.jpg

Diverse Kunststoffboxen aus der SCS Area sortiert und auf eine Palette gestapelt. Die Boxen in die LKW Schleuse transportiert und eingelagert.

Coworkers: O.Bilani, S.Menzel

Entry   Kranschleuse, posted by Sascha Menzel on 17 Apr 2025, 09:54 

Die Kranschleuse geschlossen. 

Coworkers: S.Arslan, S.Menzel

Entry   Kranen und Transport zum XHE1, posted by Sascha Menzel on 14 Dec 2022, 14:30 6x

SCS Parts in der Hutch auf Paletten und Gitterbox gekrant, verzurrt und für den Transport zum XHE1 in die LKW Schleuse gebracht. SCS Parts und Palette von SPB/SFX nach Osdorf XHE1 transportiert.

Die Palette von SPB/SFX mit Hilfe von S.Arslan im XHE1 vom Anhänger gekrant.

SCS, SPB/SFX Parts eingelagert.

 

Coworkers: S.Menzel, M.Lüdeke, O.Bilani, S.Arslan

 

Entry   Kranen für Desy, posted by Kai-Erik Pfeiffer on 05 Mar 2025, 11:20 

Für die zwei freundlichen Desy Kollegen den Oberteil eines Reinraumzeltes auf den Transporter gekrant.

 

Coworkers:

O. Bilani, B. Wolf, K. Pfeiffer

Entry   Kranarbeit FXE, posted by Michael Luedeke on 10 Oct 2022, 12:44 IMG_20221010_113726.jpgIMG_20221010_113719.jpg

10.10.2022 ---> Kranarbeit bei FXE wie besprochen durchgeführt

Entry   Kontrollgang, posted by Paul Schoenborn on 03 Nov 2024, 15:50 

Bei einem Kontrollgang eine Luftbefeuchtereinheit und eine Dampfbefeuchtereinheit gefunden die eine Wartung benötigen.
Dementsprechend mit Foto TS per Email bescheid gegeben.

Entry   Konsolenhalter, posted by Kai-Erik Pfeiffer on 14 Jan 2025, 11:40 20250114_101848.jpg20250114_112544.jpg20250114_112553.jpg

Ein Gestell für eine Konsole in der Hutch von MID gebaut und aufgestellt.

 

Coworkers: B. Wolf, P. Schönborn, K. Pfeiffer

Entry   Klimagerät in Störung, posted by Sascha Menzel on 13 Dec 2023, 14:26 Image20231213143053.jpg

Präzisionsklimagerät E02 SASE3 zeigt dringende Störung  / Alarm Umluftventilator 2 Überstrom / Frequenzumformer. Info an A.Kondraschew gegeben.

Entry   Klima Hütte C.01 in Störung, posted by Sascha Menzel on 12 Sep 2024, 14:57 Image20240912150016.jpg

Klimagerät  Hütte C.01 in Störung "Dringende Störung: Alarm Grenzwert Regelfeuchte maximal". Info-Mail an TS geschrieben.

 

Entry   Kabelhalter, posted by Kai-Erik Pfeiffer on 15 Jan 2025, 08:45 20250115_080104.jpg

Zwei Kabelhalter mit einem Hilti Profil und zwei Winkeln in der SXP Hutch angebracht.

Entry   Joint Cleantent, posted by Orkidia Bilani on 29 Sep 2022, 19:25 

Mr. Ch. Grüner from "Spetec" came to discuss about the build up of the joint clean tent in the Exp.Hall.

He proposed not to use R+K profiles, but their own, since the R+K profiles do not provide a good stability of the cleanroom modules.

We have most of the filter units, so we do not neccessary need to buy all of them (save money).

The instruments will inform about the last filter change (actually is a yearly procedure).

The crane position for the SCS part of the clean tent can be changed (we got confirmation from J-T.Delitz).

In case it will be granted to build the cleantent from "Spetec", we agreed to have only one expert from "Spetec" to build it up, instead of four (saving money), since the entire XHCrew (O.Bilani, S.Menzel, M.Lüdeke)  will work on it.

The time scale is 2-3 weeks to complete the whole mounting and the Inbetriebnahme.

On 30.09 we will go to XHE1 to see the type of the filter units and give this information further to Mr. Ch.Grüner.

Entry   Interlock SCS, posted by Kai-Erik Pfeiffer on 15 Jan 2025, 13:09 20250115_123318.jpg20250115_123328.jpg

Das Interlock System von SCS hat den TÜV nicht bestanden, die safety switches waren etwas locker. Eine der selbstschneidenden Schrauben drehte bereits leer, eine andere war locker. Neue Gewinde geschnitten und die switches mit M6 Schrauben befestigt.

 

Coworkers: B. Wolf, K. Pfeiffer

Entry   Info, posted by Orkidia Bilani on 09 Sep 2023, 13:08 

- Supported HED with N2 and He dewars.

- Very quiet in the hall, and after 12:00 almost nobody around, machine is down.

 

Entry   Info, posted by Orkidia Bilani on 14 Oct 2023, 18:01 IMG_20231014_143737_MP.jpg

-> Dicsarded empty boxes from the hall.

-> Sorted out a box with screws and washers which was given from instruments to the HallCrew.

Entry   IT Support, posted by Sascha Menzel on 15 May 2023, 14:25 

Für Firma IBM 6 Paletten mit Server und Festplatten auf den Balkon zum Serverraum mit dem Gabelstapler gehoben.

Entry   IT Support, posted by Sascha Menzel on 23 Oct 2023, 10:47 

Für IT zwei Paletten auf die Balkonebene mit dem Gabelstapler transportiert.

Coworkers: S.Menzel, M.Peter, T.Piszcek

Entry   IT Support, posted by Sascha Menzel on 07 Nov 2023, 13:10 

Für IT einen Hubwagen für Racks mit dem Gabelstapler in die Balkonebene gehoben.

Entry   IT Support, posted by Sascha Menzel on 09 Jan 2024, 12:17 

Diverse Paletten von IT von der Anlieferung zur XHEXP1 transportiert. Mitarbeiter von IBM haben die Server ausgepackt und auf Paletten gestapelt, diese mit dem Gabelstapler auf die Balkonebene IT Serverraum gehoben.

Coworkers: S.Menzel, F.Siyli, O.Bilani, J.Malka und IBM Mitarbeiter

ELOG V3.1.4-7c3fd00