  XHCrew logbook, Page 39 of 59  Not logged in ELOG logo
ID Date Author Location Severity Subjectdown
  1065   24 Feb 2025, 10:25 Sascha MenzelGeneralInformationLKW abgeladen

Einen LKW mit R+K Lieferung (MID Schwerlasttisch & SQS Überstieg) mit dem Gabestapler abgeladen.

  440   13 Oct 2023, 19:26 Orkidia BilaniGeneralProblemLKW Schleuse

In the truck bay, the rain water flows underneath  the Rolltor, and it goes directly under the Elektroschrank, where there are cables going down in the Kabelkanal. Put a tissue and a sponge als Dämmung.

On Monday Süleyman will be contacted. 

 

 

  495   11 Dec 2023, 07:37 Sascha MenzelGeneralInformationKunststoffboxen eingelagert

Diverse Kunststoffboxen aus der SCS Area sortiert und auf eine Palette gestapelt. Die Boxen in die LKW Schleuse transportiert und eingelagert.

Coworkers: O.Bilani, S.Menzel

  1177   17 Apr 2025, 09:54 Sascha MenzelGeneralInformationKranschleuse

Die Kranschleuse geschlossen. 

Coworkers: S.Arslan, S.Menzel

  117   14 Dec 2022, 14:30 Sascha MenzelGeneralInformationKranen und Transport zum XHE1

SCS Parts in der Hutch auf Paletten und Gitterbox gekrant, verzurrt und für den Transport zum XHE1 in die LKW Schleuse gebracht. SCS Parts und Palette von SPB/SFX nach Osdorf XHE1 transportiert.

Die Palette von SPB/SFX mit Hilfe von S.Arslan im XHE1 vom Anhänger gekrant.

SCS, SPB/SFX Parts eingelagert.

 

Coworkers: S.Menzel, M.Lüdeke, O.Bilani, S.Arslan

 

  1081   05 Mar 2025, 11:20 Kai-Erik PfeifferGeneralInformationKranen für Desy

Für die zwei freundlichen Desy Kollegen den Oberteil eines Reinraumzeltes auf den Transporter gekrant.

 

Coworkers:

O. Bilani, B. Wolf, K. Pfeiffer

  63   10 Oct 2022, 12:44 Michael LuedekeGeneralInformationKranarbeit FXE

10.10.2022 ---> Kranarbeit bei FXE wie besprochen durchgeführt

  904   03 Nov 2024, 15:50 Paul SchoenbornGeneralInformationKontrollgang

Bei einem Kontrollgang eine Luftbefeuchtereinheit und eine Dampfbefeuchtereinheit gefunden die eine Wartung benötigen.
Dementsprechend mit Foto TS per Email bescheid gegeben.

  998   14 Jan 2025, 11:40 Kai-Erik PfeifferGeneralInformationKonsolenhalter

Ein Gestell für eine Konsole in der Hutch von MID gebaut und aufgestellt.

 

Coworkers: B. Wolf, P. Schönborn, K. Pfeiffer

  501   13 Dec 2023, 14:26 Sascha MenzelXHEXPProblemKlimagerät in Störung

Präzisionsklimagerät E02 SASE3 zeigt dringende Störung  / Alarm Umluftventilator 2 Überstrom / Frequenzumformer. Info an A.Kondraschew gegeben.

  807   12 Sep 2024, 14:57 Sascha MenzelXHEXPProblemKlima Hütte C.01 in Störung

Klimagerät  Hütte C.01 in Störung "Dringende Störung: Alarm Grenzwert Regelfeuchte maximal". Info-Mail an TS geschrieben.

 

  999   15 Jan 2025, 08:45 Kai-Erik PfeifferGeneralInformationKabelhalter

Zwei Kabelhalter mit einem Hilti Profil und zwei Winkeln in der SXP Hutch angebracht.

  38   29 Sep 2022, 19:25 Orkidia BilaniXHEXPInformationJoint Cleantent

Mr. Ch. Grüner from "Spetec" came to discuss about the build up of the joint clean tent in the Exp.Hall.

He proposed not to use R+K profiles, but their own, since the R+K profiles do not provide a good stability of the cleanroom modules.

We have most of the filter units, so we do not neccessary need to buy all of them (save money).

The instruments will inform about the last filter change (actually is a yearly procedure).

The crane position for the SCS part of the clean tent can be changed (we got confirmation from J-T.Delitz).

In case it will be granted to build the cleantent from "Spetec", we agreed to have only one expert from "Spetec" to build it up, instead of four (saving money), since the entire XHCrew (O.Bilani, S.Menzel, M.Lüdeke)  will work on it.

The time scale is 2-3 weeks to complete the whole mounting and the Inbetriebnahme.

On 30.09 we will go to XHE1 to see the type of the filter units and give this information further to Mr. Ch.Grüner.

  1001   15 Jan 2025, 13:09 Kai-Erik PfeifferGeneralProblemInterlock SCS

Das Interlock System von SCS hat den TÜV nicht bestanden, die safety switches waren etwas locker. Eine der selbstschneidenden Schrauben drehte bereits leer, eine andere war locker. Neue Gewinde geschnitten und die switches mit M6 Schrauben befestigt.

 

Coworkers: B. Wolf, K. Pfeiffer

  387   09 Sep 2023, 13:08 Orkidia BilaniXHEXPInformationInfo

- Supported HED with N2 and He dewars.

- Very quiet in the hall, and after 12:00 almost nobody around, machine is down.

 

  442   14 Oct 2023, 18:01 Orkidia BilaniXHEXPInformationInfo

-> Dicsarded empty boxes from the hall.

-> Sorted out a box with screws and washers which was given from instruments to the HallCrew.

  300   15 May 2023, 14:25 Sascha MenzelXHEXPInformationIT Support

Für Firma IBM 6 Paletten mit Server und Festplatten auf den Balkon zum Serverraum mit dem Gabelstapler gehoben.

  446   23 Oct 2023, 10:47 Sascha MenzelXHEXPInformationIT Support

Für IT zwei Paletten auf die Balkonebene mit dem Gabelstapler transportiert.

Coworkers: S.Menzel, M.Peter, T.Piszcek

  463   07 Nov 2023, 13:10 Sascha MenzelXHEXPInformationIT Support

Für IT einen Hubwagen für Racks mit dem Gabelstapler in die Balkonebene gehoben.

  516   09 Jan 2024, 12:17 Sascha MenzelXHEXPInformationIT Support

Diverse Paletten von IT von der Anlieferung zur XHEXP1 transportiert. Mitarbeiter von IBM haben die Server ausgepackt und auf Paletten gestapelt, diese mit dem Gabelstapler auf die Balkonebene IT Serverraum gehoben.

Coworkers: S.Menzel, F.Siyli, O.Bilani, J.Malka und IBM Mitarbeiter