Entry   SXP Support, posted by Sascha Menzel on 06 Jun 2024, 15:05 Image20240606150515.jpgImage20240606150518.jpgImage20240606150520.jpg

Die oberen Monitore in der Kontoll Hutch von SXP abgenommen, die Halter nach links verschoben und die Monitore an die HAlter wieder angehängt und angeschlossen.

Coworkers: S.Menzel, M.Pooch (TS)

Entry   MID Support, posted by Sascha Menzel on 05 Jun 2024, 19:47 Image20240605194705.jpg

Für MID in der Werkstatt ein Alu Profil zum festsetzen des Laser Vohanges in der MID exp.Hutch angefertigt.

Entry   Dewar gefüllt, posted by Sascha Menzel on 05 Jun 2024, 19:46 

Einen Dewar für SCS gefüllt

Entry   SQS Support, posted by Sascha Menzel on 05 Jun 2024, 15:50 Image20240605155246.jpgImage20240605155248.jpg

Eine Pumpe und eine Kammer mit dem Hallenkran gekrant.

 

Entry   SXP Support, posted by Sascha Menzel on 05 Jun 2024, 13:58 

Einen Granit in der SCS Hutch an den Verstellschrauben in eine andere Position verstellt.

Entry   Dewar gefüllt, posted by Sascha Menzel on 04 Jun 2024, 18:35 

Einen Dewar für SCS gefüllt und zwei nachgefüllt.

Entry   Erste Hilfe und Feuerlöscher Kennzeichnung, posted by Sascha Menzel on 04 Jun 2024, 15:38 Image20240604205833.jpg

Bei Sase3 Balkon Ebene Bereich SCS Rack Room, den Feuerlöscher und den Erste Hilfe Kasten mit den dafür vorgesehenen Schilder gekennzeichnet.

Entry   Transport zum XHE1, posted by Sascha Menzel on 03 Jun 2024, 17:54 Image20240603175558.jpg

Eine Kiste von HIBEF QR50374 zum XHE1 transportiert und dort eingelagert.

Entry   Dewar gefüllt, posted by Sascha Menzel on 01 Jun 2024, 18:25 

2 Weitere Dewar für SCS gefüllt und 2 nachgefüllt.

Entry   Dewar gefüllt, posted by Sascha Menzel on 30 May 2024, 10:51 

2 Dewar für Vacuum gefüllt.

Entry   Dewar gefüllt, posted by Sascha Menzel on 29 May 2024, 14:33 

Dewar #25576 & #25086 für SCS gefüllt.

Entry   SQS Support, posted by Sascha Menzel on 28 May 2024, 20:26 

Das REMI auf Airpads aus der exp.Hutch per Luftdruck zur SQS Area transportiert und eine andere Kammer auf Airpads in die exp.Hutch transportiert.

 

Entry   MID Support, posted by Sascha Menzel on 28 May 2024, 10:52 Image20240528112528.jpg

Das WAXS-Fenster mit dem Hutch-Kran auf die Kammer gekrant und befestigt.

Coworkers: S.Menzel, J.Möller, J.-E.Pudell

Entry   SXP Support, posted by Sascha Menzel on 27 May 2024, 14:41 Image20240527144002.jpg

An 2 Posterrahmen Magnete montiert und diese an die SXP exp.Hutch Stahltür geheftet.

Entry   Si Oil in the hall, posted by Orkidia Bilani on 26 May 2024, 18:49 Screenshot_20240526-184847.png

The communication with D. Lomidze (DET) concerning the Si Oil dripping from the ceiling (pic.).

Entry   Doors of MID Optics Hutch, posted by Orkidia Bilani on 25 May 2024, 13:32 VID_20240525_112407.mp4

Both doors of the MID optics hutch show a blinking orange light (see video below).

On Monday will ask TS if all is fine.

Entry   Oil dripping in XHEXP1, posted by Orkidia Bilani on 25 May 2024, 11:01 IMG_20240525_091952_MP.jpg

Again oil drips from the detector lab down into the the experiment hall in the SCS assembly area (near the clean tent). On 15.05 the problem was solved, still the oil drips again. Contacted DET OCD (N. Duarte), who checked in the lab upstairs, but did not have access to another room there.

 According to N. Duarte, so far it looks good, and in the 14:00 shift, D. Lomidze will check the other room and will give/update more information.

 

 

Entry   MID Support, posted by Sascha Menzel on 24 May 2024, 18:37 IMG_8391.jpgIMG_8392.jpgIMG_8393.jpgIMG_8394_(2).jpg

Der Laservorhang in der MID-Exp.Hutch muss um ca.10cm höher gesetzt werden damit ein Bauteil in die Exp.Hutch gefahren werden kann. Der Laservorhang wurde demontiert, dieverse R+K Profile in der Werksattt zugeschnitten und anschließend alles wieder auf neues Maaß zusammengebaut. Das Stützgestell wurde auf einer Ecke eingekürzt (abgewinkelt), um den Durchgang und das kranen diverser Bauteile zu gewährleisten.

Coworkers: S.Menzel, A.Schmidt

Entry   Dewar gefüllt, posted by Sascha Menzel on 24 May 2024, 18:36 

2 Dewar für Vacuum gefüllt.

Coworkers: S.Menzel, O.Bilani

Entry   Transport zum XHE1, posted by Sascha Menzel on 23 May 2024, 14:35 Image20240523143732.jpgImage20240523143729.jpgImage20240523143737.jpg

Holzbox QR50379 von HIBEF zum XHE1 transportiert und dort eingelagert. Holzbox QR50374 vom XHE1 zum XFEL / XHEXP1 transportiert und bei HIBEF abgestellt. 