16.02.2024 HiBEF: Transport to the experiment hall, posted by Orkidia Bilani on 17 Feb 2024, 06:05
|
Transported from XHE1 to XHEXP1 a box with parts for T. Toncian of HiBEF.
Co-workers: O. Bilani, S. Menzel |
Waste, posted by Orkidia Bilani on 17 Feb 2024, 10:30
|
Disposed all the Plastik/Karton waste out from the experiment hall (waste belonged to: SCS, HiBEF and MID) |
MID support, posted by Frank Siyli on 19 Feb 2024, 14:37 
|
Support for Gabriele Ansaldi.
Switched mounting direction of the adapter plate and mounted the component on the MDS_2.
Coworkers: Gabriele Ansaldi, Frank Siyli |
Transport to XHE1, posted by Orkidia Bilani on 21 Feb 2024, 10:00
|
Transport to XHE1 a component, linear stage for the XFELO project, from ME (M. di Felice); QR 61162
He will need it in the summer maintenance period.
Co-workers: O. Bilani, F. Siyli |
HiBEF: LN2 Dewar, posted by Orkidia Bilani on 21 Feb 2024, 13:14
|
Filled a LN2 dewar for HiBEF (C. Baehtz).
|
Transport to XHEXP1: SCS, posted by Orkidia Bilani on 27 Feb 2024, 10:03
|
Transport from XHE1 to XHEXP items (QR: 44451, 44452, 44453 and 46867) for SCS.
Co-workers: M. Pooch, O. Bilani |
SCS support, posted by Frank Siyli on 27 Feb 2024, 15:27  
|
Supported Carsten Broers to unscrew parts of the experimental structure. |
SQS Support in XHE1, posted by Orkidia Bilani on 27 Feb 2024, 15:43
|
Suppoerted SQS in XHE1 with disassembling parts from the cluster source and transported these components back to XHEXP1.
Co-workers: Y. Ovcharenko, A. Igharas, O. Bilani |
SCS support, posted by Frank Siyli on 29 Feb 2024, 16:45
|
Air pad powered instrument move from SCS to the assembly area.
Coworkers: J.T. Delitz, C Broers, F.Siyli |
General, posted by Orkidia Bilani on 01 Mar 2024, 14:05  
|
-> Stromkabel @SQS:
The yellow and the orange ones was/is on the way in the experiment hall, posing thus a Stolpergefahr. Discussed with N. Rennhack and T. Baumann,
the yellow one has been removed. |
04.03 SCS Support, posted by Sascha Menzel on 05 Mar 2024, 07:13  
|
04.03.2024
Eine Kammer vom SCS Bereich in derem Hutch mittels Luftdruck transportiert und auf die richtige Position gebracht/befestigt.
Vom blauen Untergestell die Verlängerung gelöst und mit dem Hutch-Kran auf eine Palette gekrant. Das blaue Untergestell mit dem |
SCS Support, posted by Sascha Menzel on 05 Mar 2024, 11:28
|
In der SCS Hutch ein DSCC Detektor von einem R+K Gestell mit dem Hutch-Kran auf einen Tisch gekrant und befestigt
Coworkers: L.Le Guyader, F.Siyli, S.Menzel |
A+S Support, posted by Sascha Menzel on 05 Mar 2024, 11:45
|
Firma A+S Brandschutztechnik das Gerüst aus dem Kran Gitter herausgegeben und beim Aufbau unterstützt.
|
Damaged concrete floor in SASE3 and SASE2, posted by Orkidia Bilani on 05 Mar 2024, 14:42
|
The damages of the concrete floor in SCS area and SASE3 in general, as well as the damages in SASE2 under the truck bay were discussed with K. Löptien.
The repair from the care takers will start very soon.
|
05.03 SCS Support, posted by Sascha Menzel on 06 Mar 2024, 07:14 
|
05.03
Ein Bauteil auf ein fahrbares Gestell mit einer von SCS angeschaften Traverse gekrant und zur SCS Hutch transportiert, dort mit dem Hutch-Kran
und der Traverse aud das blaue Gestell gekrant. |
SCS Support, posted by Sascha Menzel on 06 Mar 2024, 10:32
|
4x 13mm Löcher in eine Aluplatte gebohrt und diese mit M12 Schrauben und Nutensteine am blauen Gestell verschraubt.
Coworkers: F.Siyli, S.Menzel |
Schraubenschränke, posted by Sascha Menzel on 06 Mar 2024, 10:37 
|
3 Schraubenschränke von der Warenannahme zur XHEXP1 transportiert und im Schraubenlager XOHutch aufgestellt.
Coworkers: F.Siyli, S.Menzel |
SPB/SFX Support, posted by Sascha Menzel on 06 Mar 2024, 14:59
|
In der SPB/SFX Hutch diverse Bauteile auf der Schiene verschoben und auf die Kabelführung geachtet.
Coworkers: T.Dietze, N.Reimers, F.Siyli, S.Menzel |
SCS Support, posted by Sascha Menzel on 07 Mar 2024, 12:48
|
Den Mamorboden in der SCS Hutch freigelegt / Bodenplatten entfernt und den Detektor auf Airpads in den Arbeits/Messbereich verschoben
und befestigt.
Coworkers: J.T.Delitz, F.Siyli, S.Menzel |
SXP Support , posted by Orkidia Bilani on 08 Mar 2024, 15:37    
|
SXP wanted to buy and place a cabinet under the stairs in front of their experiment hutch and asked for advice. Unfortunately it wouldn't have worked,
because of the narrow and low space/hight under the stairs (Stossgefahr).
In the exp. hutch they do have a (office) cabinet to store their experiment specific parts, which is not so quite allowed. |