Entry   SQS Support , posted by Orkidia Bilani on 01 Nov 2023, 11:07 IMG_20231030_131455_MP.jpgIMG_20231030_131503_MP.jpg

Discussed with T.Mazza on Monday, 30.10.2023, about storing temporarily in XHE1 the wooden boxes of an equipment they recevied recently. 

They should be stored until the equipment is tested and working, so that if something goes wrong, it can be shipped to the manufacturer with the original Verpackung 

If all fine, they will be disposed, most probably by the end of winter maintenance period.

 

Transport was done!

Co-workers: S.Menzel. O.Bilani, J. Montano

Entry   SPB/SFX Support, posted by Sascha Menzel on 02 Nov 2023, 14:57 

Einen Chiller von einer Palette mittels Hallenkran gekrant.

Coworkers: O.Bilani, S.Menzel, Th.Dietze

Entry   IT Support, posted by Sascha Menzel on 07 Nov 2023, 13:10 

Für IT einen Hubwagen für Racks mit dem Gabelstapler in die Balkonebene gehoben.

Entry   SPB/SFX Support, posted by Orkidia Bilani on 10 Nov 2023, 11:34 IMG_20231110_104226_MP.jpgIMG_20231110_110437_MP.jpg

With P. Vagovic, SPB/SFX, sorted out components and trash from the hall.

Brought the table and the small box (Pic.1) to their Lab 303.

Discarded the things on the trolley and the black transport box was placed near SEC lab, 400 area (Pic.2).

 

Entry   SXP Support, posted by Sascha Menzel on 10 Nov 2023, 12:25 Image20231110113433.jpgImage20231110113437.jpgImage20231110113439.jpgImage20231110113441.jpgImage20231110113444.jpg

Eine Edelstahlleitung gekürzt und auf Maaß gebogen, diverse Adapter und eine Flexschlauch an die Leitung montiert. Die fertige Leitung angeschlossen und an das R+K Gestell befestigt. Die Leitung und Adapter kamen von P.Schmidt (TS).

 

Entry   SPB/SFX Support , posted by Orkidia Bilani on 10 Nov 2023, 14:38 IMG_20231110_143034_MP.jpgIMG_20231110_143058_MP.jpg

Together with P. Vagovic, made ready to transport to XHE1 an optical table (QR 49889)  and a detector assembly (QR 49890), and  supported on their XIM entries.

The transport will take place on Monday, 13.11.2023.

 

 

Entry   SCS Support, posted by Sascha Menzel on 14 Nov 2023, 13:12 Image20231114131158.jpg

Eine Aluplatte auf ein Gestell mit Stellmotoren gekrant und verschraubt.

Coworkers: S.Menzel, C.Broers

Entry   Transport: Vakuum, posted by Orkidia Bilani on 14 Nov 2023, 17:51 IMG_20231114_174837_MP.jpg

Two pipe transport trolleys  (QR 44462) were transported from external storage Ütersen to LKW Schleuse from TS colleagues. The third one will be transported tomorrow.

Trolleys brought to the experiment hall and placed in the Vacuum assembly area. 

 

 

Entry   SXP Support, posted by Orkidia Bilani on 17 Nov 2023, 20:48 

SXP support yesterday (M. Izquierdo) and today (V.Vardanyans) with practical things :-)

Entry   SPB/SFX Support: Craning, posted by Orkidia Bilani on 20 Nov 2023, 12:22 

Craned the Julabo chiller up to the rarck room for SPB/SFX.

Co-workers: O. Bilani, M. Peter, Th. Dietze

 

Entry   SPB/SFX: Craning the Julabo chiller, posted by Orkidia Bilani on 23 Nov 2023, 15:07 IMG_20231123_123243_MP.jpg

Supported SPB/SFX with craning down the Julabo Chiller from the rack room.

It will be shipped to the manufacturer for repair.

 

Co-workers: O. Bilani, T. Dietze 

Entry   SQS Support , posted by Orkidia Bilani on 28 Nov 2023, 19:33 

Supported SQS with carrying the top small cabinets and placing them on the bigger ones.

Co-workers: O. Bilani,  M. Peter, A. Igharas, J. Montano

Entry   SQS Support , posted by Orkidia Bilani on 29 Nov 2023, 19:46 IMG_20231129_133338_MP.jpg

Brought Back from XHE1 into the Experiment Hall the "PAM - Chambers".

Co-workers: O. Bilani, H. Heuer

 

Entry   HiBEF Support , posted by Orkidia Bilani on 29 Nov 2023, 19:50 

"Montagehilfe für Cryofan" brought down from the Laser room of HED/HiBEF to the assembly area of HiBEF. 

Mounted partly together and will be transported (next week) back to the external storage in Ütersen.

Co-workers: O. Bilani, S. Arslan, J. Hauser

Entry   MID Support , posted by Orkidia Bilani on 29 Nov 2023, 19:57 

R. Shayduk  wanted urgently the vacuum steel cover and didn't really know its location and QR code.

This was stored  in our Warehouse in September 2022 (G. Ansaldi, O. Smith and O. Bilani) , QR 37702.

Informed Roman about that, and he will pick it up tomorrow in the Warehouse.

Entry   SQS Support, posted by Orkidia Bilani on 01 Dec 2023, 10:25 

30.11.2023

Supported SQS with grouting in their hutch.

Co-Workers: M. Peter, A. Ihgaras

Entry   Next week , posted by Orkidia Bilani on 01 Dec 2023, 10:26 

Following instruments need XHCrew support next week:

SQS: transport from LKW Schleuse to the hall (Wednesday 9:30) and craning/assembly activities in the hutch (days not known yet)

SCS: Moving with airpads and mounting of a chamber in their hutch (Tuesday - Wednesday)

FXE: Bring down to the with the forklift their Julabo Chiller from the rack room (Wednesday or Thursday)

VAC: Spetec, Maik and Sascha in XHE3 (measurements/tests for the filter units of the clean tents)  (Monday between 9:00 and 10:00)

Entry   MID Support, posted by Sascha Menzel on 05 Dec 2023, 13:12 Image20231205121838.jpgImage20231205122007.jpgImage20231205121840.jpgImage20231205121843.jpg

Diverse Gewinde mit dem Gewindeschneider nachgeschnitten. 4 Standfüße zusammen gebaut und auf Maaß an montiert.

Coworkers: S.Menzel, G.Ansaldi

Entry   LN2 Dewar, posted by Orkidia Bilani on 06 Dec 2023, 11:35 

Refilled the LN2 dewar  # 44229 for H. Han.

 

Entry   SCS Support, posted by Sascha Menzel on 06 Dec 2023, 19:31 

Für SCS eine Kammer auf Air cushion mit Druckluft  aus der SCS Hutch zur Area transportiert und eine andere Kammer auf dem gleichen Weg zurück in dei Hutch transportiert.

Coworkers: S.Menzel, C.Broers, J.T.Delitz

ELOG V3.1.4-7c3fd00