Transport: Vakuum, posted by Orkidia Bilani on 14 Nov 2023, 17:51
|
Two pipe transport trolleys (QR 44462) were transported from external storage Ütersen to LKW Schleuse from TS colleagues. The third one
will be transported tomorrow.
Trolleys brought to the experiment hall and placed in the Vacuum assembly area. |
SXP Support, posted by Orkidia Bilani on 17 Nov 2023, 20:48
|
SXP support yesterday (M. Izquierdo) and today (V.Vardanyans) with practical things :-) |
SPB/SFX Support: Craning, posted by Orkidia Bilani on 20 Nov 2023, 12:22
|
Craned the Julabo chiller up to the rarck room for SPB/SFX.
Co-workers: O. Bilani, M. Peter, Th. Dietze
|
SPB/SFX: Craning the Julabo chiller, posted by Orkidia Bilani on 23 Nov 2023, 15:07
|
Supported SPB/SFX with craning down the Julabo Chiller from the rack room.
It will be shipped to the manufacturer for repair.
|
SQS Support , posted by Orkidia Bilani on 28 Nov 2023, 19:33
|
Supported SQS with carrying the top small cabinets and placing them on the bigger ones.
Co-workers: O. Bilani, M. Peter, A. Igharas, J. Montano |
SQS Support , posted by Orkidia Bilani on 29 Nov 2023, 19:46
|
Brought Back from XHE1 into the Experiment Hall the "PAM - Chambers".
Co-workers: O. Bilani, H. Heuer
|
HiBEF Support , posted by Orkidia Bilani on 29 Nov 2023, 19:50
|
"Montagehilfe für Cryofan" brought down from the Laser room of HED/HiBEF to the assembly area of HiBEF.
Mounted partly together and will be transported (next week) back to the external storage in Ütersen.
Co-workers: O. Bilani, S. Arslan, J. Hauser |
MID Support , posted by Orkidia Bilani on 29 Nov 2023, 19:57
|
R. Shayduk wanted urgently the vacuum steel cover and didn't really know its location and QR code.
This was stored in our Warehouse in September 2022 (G. Ansaldi, O. Smith and O. Bilani) , QR 37702.
Informed Roman about that, and he will pick it up tomorrow in the Warehouse. |
SQS Support, posted by Orkidia Bilani on 01 Dec 2023, 10:25
|
30.11.2023
Supported SQS with grouting in their hutch.
Co-Workers: M. Peter, A. Ihgaras |
Next week , posted by Orkidia Bilani on 01 Dec 2023, 10:26
|
Following instruments need XHCrew support next week:
SQS: transport from LKW Schleuse to the hall (Wednesday 9:30) and craning/assembly activities in the hutch (days not known yet)
SCS: Moving with airpads and mounting of a chamber in their hutch (Tuesday - Wednesday) |
MID Support, posted by Sascha Menzel on 05 Dec 2023, 13:12   
|
Diverse Gewinde mit dem Gewindeschneider nachgeschnitten. 4 Standfüße zusammen gebaut und auf Maaß an montiert.
Coworkers: S.Menzel, G.Ansaldi |
LN2 Dewar, posted by Orkidia Bilani on 06 Dec 2023, 11:35
|
Refilled the LN2 dewar # 44229 for H. Han.
|
SCS Support, posted by Sascha Menzel on 06 Dec 2023, 19:31
|
Für SCS eine Kammer auf Air cushion mit Druckluft aus der SCS Hutch zur Area transportiert und eine andere Kammer auf dem gleichen Weg
zurück in dei Hutch transportiert.
Coworkers: S.Menzel, C.Broers, J.T.Delitz |
SQS Support, posted by Sascha Menzel on 08 Dec 2023, 07:13  
|
Eine Kammer auf Granitblöcken 2200kg mit dem Hutchkran und den mobilen roten Kran von einer Palette gekrant. Um die Last gleichmäßig
zu verteilen wurden zwei Kräne genutzt. Halter zur Stabilisierung montiert.
Coworker: S.Menzel, O.Bilani, J.Montano, A.Igharas |
LN2 Dewars, posted by Orkidia Bilani on 12 Dec 2023, 13:50
|
Refilled dewars #25579 and #25089 for J. Moore and S. Göde respectively.
Co-workers: S. Menzel, O. Bilani |
SCS Support, posted by Sascha Menzel on 12 Dec 2023, 19:18   
|
Zur Probe eine Alu Platte mit weiteren Alu Profilen zusammen gebaut und auf das blaue Gestell mit dem Hallenkran gekrant und das Gewicht mit der
Kranwage ermittelt. Es werden am 13.12 weitere Bauteile instaliert.
Coworkers: S.Menzel, A.Reich |
Klimagerät in Störung, posted by Sascha Menzel on 13 Dec 2023, 14:26
|
Präzisionsklimagerät E02 SASE3 zeigt dringende Störung / Alarm Umluftventilator 2 Überstrom / Frequenzumformer. Info an A.Kondraschew
gegeben. |
SCS Support, posted by Sascha Menzel on 13 Dec 2023, 14:33   
|
Fortsetzung vom Vortag: Zugeschnittene R+K Profile zu ein Gestell zusammengebaut und diverse Aluplatten mit Hochdruckpumpen montiert und auf das Gestell
gekrant. Anschließend auf das große Gestell gekrant und befestigt. Eine fertige Komponente mit Hochdruckpumpen und Rohren auf das große
Gestell gekrant und befestigt. An das ganze die Anschläge für den Schwerpunkt ermittelt und gekennzeichnet. Das Gesamtgewicht mittels Kranwaage |
SCS Support, posted by Sascha Menzel on 15 Dec 2023, 10:08  
|
14.12.2023
Das blaue Gestell in die SCS Hutch transportiert und mit dem Hutchkran in die richtige Position gebracht und befestigt. Gestellerweiterung gekrant
und befestigt. Einen verstellbaren Tisch auf das Gestell gekrant und befestigt. |
SASE1, posted by Orkidia Bilani on 05 Jan 2024, 10:16 
|
In SASE1, the Zuluftkanal (near room D.22) has an air leckage (pic.1).
Also on the top of the Präzisionsklimagerät (QR 30585) another air leckage
was detected (pic.2). |