Zylinder tausch Mobiler Kran, posted by Sascha Menzel on 30 Sep 2022, 11:33
|
Hall Crew hat den Hubzylinder vom mobilen Kran durch einen neuen Zylinder ersetzt.
Der Ersatzzylinder wurde von J.Hauser zur Verfügung gestellt (er hatte einen Ersatzteil bestellt).
|
XO Hutch, posted by Sascha Menzel on 29 Jan 2024, 09:53
|
Die PC´s abgebaut und erstmal ins Schraubenlager gestellt. Zusammen mit M.Pooch und H.Heuer die Tische und Schränke aus der Hutch transportiert,
damit der Tischler am 31.01. die Möbel einbauen kann.
Coworkers: F.Siyli, S.Menzel, M.Pooch, H.Heuer |
XO Hutch, posted by Sascha Menzel on 09 Feb 2024, 19:53
|
In der XO Hutch die Rechner und Monitore angeschlossen. |
XHE1 Organization, posted by Orkidia Bilani on 09 Feb 2023, 15:02
|
Went with Lorenz to XHE1 and discussed the structuring of XHE1 and the future Lagerhalle in Ütersen. The few empty boxes of the instruments as well
as parts/materials which will not be used within 1 year by the instruments, will be placed in the new Lagerhalle in Ütersen.
Waste and unknown stuff in XHE1, which is there before XHCrew time will be sorted out by TS. |
XHE1, posted by Orkidia Bilani on 30 Sep 2022, 10:40
|
XHCrew went to shaft building and took note of the series numbers of the filter units. There are still 8 pieces left and their functionality is somehow
unclear.
Checked the spaces for the next week's transport. |
XHCrew consumables' storage , posted by Orkidia Bilani on 16 Jun 2024, 21:13
|
Filled (15.-16.06) the drawers with all the M5 screws and M6 upt to M6x60. Rest to continue. |
XHCrew Storage, posted by Orkidia Bilani on 09 Jun 2023, 19:02
|
► In the consumables' storage
found this box with various M3 screws.
► No idea from whom, anyway |
XHCrew Hutch, posted by Orkidia Bilani on 07 Dec 2022, 11:07
|
Under the XHallCrew office lights have been installed and are functional. |
Work on the Consumables' Storage, posted by Orkidia Bilani on 27 Mar 2024, 14:06
|
26.03.2024: Planned and worked on the consumables's storage.
O. Bilani, S. Menzel |
Weissklima Technik at SA2, posted by Orkidia Bilani on 27 Oct 2022, 07:54
|
An acustic warning singal was triggered at the Weissklima Technik unit (QR 30755) at SA2- On the display: Nicht dringende Störung.
Acustic signal has been muted, TS will check.
|
Weiss Klimatechnik: acoustic warning signal, posted by Orkidia Bilani on 12 Jan 2023, 08:28
|
In the balcony between SA4 and SA5 an acousitic signal was triggered. It is nothing serious (automatische Wartung, every 300 hours?) TS
gets the notification anyway. |
Weiss Klimatechnik: SASE 1, posted by Orkidia Bilani on 09 Jun 2023, 19:04
|
► @SASE1 an
mehreren Weiss Klimatechnik : die Verkleidung der Rohre löst sich (siehe Bilder)
► Redmine Ticket sent to D. |
Water from the XHQ roof, posted by Orkidia Bilani on 23 Nov 2024, 12:55
|
At around 12:40 there was a lot of water in the XHQ 2nd. floor. It comes from the roof, snow melting.
Called TN here at the gate, and they will take care for the moment about it.
Update 13:50: TN brought three buckets and a warning sign. While I meet the cleaning lady and she dried everything up and placed another |
Waste: Cardboard boxes, posted by Orkidia Bilani on 01 Apr 2023, 09:37
|
Removed from the experiment hall all the empty cardboard boxes scattered around. |
Waste in the Experiment Hall , posted by Orkidia Bilani on 18 Mar 2024, 08:03
|
Disposed waste from the Experiment Hall. |
Waste brought out of the Hall, posted by Orkidia Bilani on 15 Sep 2024, 09:52
|
-> Disposed fire load materials and a beacon (Bake) left over from a construction company, which were located in the hall (SXP and
SCS Empore).
-> Brought in the warehouse a box with useless black screws. |
Waste , posted by Orkidia Bilani on 10 Apr 2024, 08:16
|
Disposed waste (Brandlast) out of the Experiment Hall. |
Waste, posted by Orkidia Bilani on 17 Feb 2024, 10:30
|
Disposed all the Plastik/Karton waste out from the experiment hall (waste belonged to: SCS, HiBEF and MID) |
Wasserkreislauf aufgebaut, posted by Sascha Menzel on 28 Sep 2023, 18:07
|
SQS hat seine undichten Magnetspulen instand gesetzt und möchte diese auf Dichtigkeit prüfen. Bei Sase1 an den 20°C Vorlauf und 26°C
Rücklauf, auf die Zwischenabgänge zwei Adapter und Schläuche montiert, diese an die Spule angeschlossen und die Spule auf Undichtigkeit
geprüft. |
Vorgeschichte des Aufuzgs: Hatte doch Störung, posted by Orkidia Bilani on 09 Jun 2023, 14:43
|
The S. Arslan answer of the Redmine Ticket concerning the elevator (see pic below). And today the elevator was again out of order, see the previous
entry frpm S. Menzel.
|