Group Selection Page HELP DOC Controls Group Data Analysis Group ITDM WP76 DET Vacuum XRO EEE WP78 WP74 FXE SCS SPB MID HED SQS SXP Sample Environment Photon Commissioning Team Operation PSPO XO TS
Technical integration and coordination SASE1 Status and SASE3 Readiness
  Joint Operation and Readiness Logbook, Contact: T.Haas, A. Violante, G. Wellenreuther  Not logged in ELOG logo
Entry   Status and Plans after 01:30 meeting, posted by Tobias Haas on 16 Oct 2017, 15:22 
    Reply   Status and Plans after 01:30 meeting, posted by Tobias Haas on 16 Oct 2017, 15:54 
Message ID: 403     Entry time: 16 Oct 2017, 15:54     In reply to: 402
Author: Tobias Haas 
Location: General 
Severity: Information 
Subject: Status and Plans after 01:30 meeting 

Dear Tobias,

Just to clarify that the last information that we got from SPB was the message below. From this information and the technical evaluation that we did the issue is not strong enough to classify Karabo 2.1.18 as "Currently it is not operational. An operational control system is needed soon". This statement is too strong and does not contain technical fundamental. 

Anyway, we already mentioned in the meeting that since Friday we have been working to solve the problem and we already have alternatives. We will publish a patch (Karabo 2.1.18.x) today or tomorrow.

Finally, I talked offline with Adrian and we agreed about some topics. Especially to review the "mandatory" word in the release process.

Hugo


From: "Marc Messerschmidt" <marc.messerschmidt@desy.de>
To: "Hugo Santos" <hugo.santos@xfel.eu>, "chen xu" <chen.xu@xfel.eu>, "cyril danilevski" <cyril.danilevski@xfel.eu>, "Marc Messerschmidt" <marc.messerschmidt@xfel.eu>, "Jolanta Sztuk-Dambietz" <jolanta.sztuk@xfel.eu>, "Britta Weinhausen" <britta.weinhausen@xfel.eu>, "Alessandro Silenzi" <alessandro.silenzi@xfel.eu>
Cc: "John Wiggins" <john.wiggins@xfel.eu>
Sent: Friday, 13 October, 2017 20:47:41
Subject: AW: GUI Responsiveness in SPB

I saw some issues today as well when instantiating devices, but nothing as bad as yesterday. The gui delay also seemed functional and went only up top around 30s.

Marc 

 

 

Tobias Haas wrote:

General

  • Closing of XTD2/4/9/10 foreseen for Oct 23. Possibly XTD9/10 can be re-opened afterwards and stay open until 28 October

Instruments

  • SPB:
    • A lot of cabling work was done. Cable drag chains were installed for AGIPD to move it to another posiiton
    • Roughing pipes were installed
    • Update of KARABO to 2.1.18 was not as smooth as expected. Currently it is not operational. An operational control system is needed soon
    • M. Messerschmidt sent another message with problems early today
  • FXE
    • Final testing ongoing of Gotthardt with KARABO
    • Cable management and cable re-routing was done last week

Tunnels

  • V0 valve was replaced
  • The first vacuum section down stream from V0 was successfully closed and leak tested
  • DESY Vacuum group is currently working on the respective section upstream of V0
  • Welders are here today to work on the two pipes with leaks. They spent all morning on safety trainings
  • The gas attenuator was leak tested on the "good" side (where vacuum section is currently ok/no leaks)
  • Pumping has started on the diff pumping section by Vac
  • Many small things (mostly cabling and electronics)_ remain to be done

Diagnostics

  • Group was not represented by some infos from J. Tolkiehn
  • More tests are needed for the Diff Pumping of the Diagnostics group.
  • Diff Pumping and PES require more crates to be connected

AE

  • SPB loop 5 was cycled.
  • The issues with the turbo pumps is being worked on today (Pumps do not turn on after loop is cycled)
  • Work is ongoing on the MKS gauge controller
  • In the SASE1 tunnel the motion loop will be updated tomorrow and the vacuum loop on Wednesday 
  • At this time the SPB loop in XTD9 will also be cycled
  • FXE is asked to provide information on what works need to be done
  • SASE3 Tunnel:
    • Interlock definitions arre prepared but need to be implemented
    • Many local tests still ongoing
    • There are still problems with inconsistent/wrong device names
    • Two motions loops (mov1/mov2) mov1 contains the most important components upstream
    • EPS not expected for some time

ITDM

  • GPFS upgrade today
  • redundancy data link might be done today
  • Tomorrow: DAQ SW upgrade for LPD (Is still at KARABO 2.1.16.4)

CAS

  • Long discussion happened on what the word "mandatory" means in conjunction with the most recent KARABO release
  • CAS will look into the specific problems in SPB and FXE that have been brought up
  • H. Santos discussed the scan tool with S. Brockhauser on Saturday

 

ELOG V3.1.4-7c3fd00