  OPERATION-2025 logbook, Contact: F.Wolff-Fabris, A.Galler, H.Sinn  Not logged in ELOG logo
Message ID: 40     Entry time: 03 Apr 2025, 07:34
Author: Harald Sinn 
Group: PRC 
Subject: SA1 status 

7:20 FXE reports a problem with laser synchronisation (yellow warning light and could not change delay). BKR informs the DESY laser sync group. 

7:51 DESY sync group reported that there was a CPU failing about 6 am this morning which led to the yellow warning light. However, synchronisation was very likely all the time ok withing 5-10fs. The CPU was now reset and everything should be wokring now. 