Group Selection Page HELP Controls Group Data Analysis Group ITDM WP76 DET Vacuum EEE WP78 FXE SPB MID HED SQS SXP Sample Environment Operation PSPO XO TS Migrated2Zulip
OPERATION-2025 OPERATION-2024 OPERATION-2023 OPERATION-2022 OPERATION-2021 OPERATION-2020 OPERATION-2019 SASE1-2018 SASE1-2017 Experiment data
  OPERATION-2025 logbook, Contact: F.Wolff-Fabris, A.Galler, H.Sinn, Page 2 of 5  Not logged in ELOG logo
ID Date Author Groupdown Subject
  28   25 Feb 2025, 02:41 Jayanath KoliyaduSPBShift summary

X-ray delivery
-15 keV with Hirex monitoring, 0.5 mJ/pulse, 202 pulses/train at 0.56 MHz pulse repetition rate
Optical laser delivery
- 810 nm laser for illumination
-PP laser for excitation, 590 nm, 51 pulses, 141 kHz
Achievements/Observations

  • Collected high resolution time resolved data
  • Collected Tve_CPC500f and Tve_CPC1n data and completed Tve_CPC20p

 

  29   27 Feb 2025, 07:02 Tokushi SatoSPBShift summary

X-ray delivery

    up to 202/352 pulses per train (~0.8 mJ pulse energy)@13.4 keV, 0.5/1.1 MHz 

Optical laser delivery

    800 nm, less than 20 fs at sample position, no issue


Achievements/Observations

    X-ray beam de-focused to a few um for data taking

    PP laser aligned

    Fixed target measurement was finished

  30   28 Feb 2025, 06:57 Tokushi SatoSPBShift summary

X-ray delivery

    up to 202/352 pulses per train (~0.8 mJ pulse energy)@13.4 keV, 0.5/1.1 MHz 

Optical laser delivery

    800 nm, less than 20 fs at sample position, no issue


Achievements/Observations

    X-ray beam de-focused to a few um for data taking

    PP laser aligned

    Data collection for some samples

Issues


    No major issue today

  31   01 Mar 2025, 06:56 Tokushi SatoSPBShift summary

X-ray delivery

    up to 202/352 pulses per train (~0.8 mJ pulse energy)@13.4 keV, 0.5/1.1 MHz 

Optical laser delivery

    800 nm, less than 20 fs at sample position, no issue


Achievements/Observations

    X-ray beam de-focused to a few um for data taking

    PP laser aligned

    Data collection for some samples
 

  33   02 Mar 2025, 06:56 Tokushi SatoSPBShift summary

X-ray delivery

    up to 175 pulses per train (~1 mJ pulse energy)@13.4 keV, 0.5 MHz

Optical laser delivery

    800 nm, less than 20 fs at sample position, no issue


Achievements/Observations

    X-ray beam de-focused to a few um for data taking

    PP laser aligned

    Data collection for some samples

Issues


    We could use 188 pulses, but last 13 pulses intensity was too weak, not used for measurement

  34   03 Mar 2025, 07:05 Tokushi SatoSPBShift summary

X-ray delivery

    up to 188 pulses per train (~1 mJ pulse energy)@13.4 keV, 0.5 MHz

Optical laser delivery

    800 nm, less than 20 fs at sample position, no issue


Achievements/Observations

    X-ray beam de-focused to a few um for data taking

    PP laser aligned

    Data collection for some samples

  35   04 Mar 2025, 07:05 Tokushi SatoSPBShift summary

X-ray delivery

    up to 188/352 pulses per train (~1 mJ pulse energy)@13.4 keV, 0.5/1.1 MHz

Optical laser delivery

    800 nm, less than 20 fs at sample position, no issue


Achievements/Observations

    X-ray beam de-focused to a few um for data taking

    PP laser aligned

    Data collection for some samples

  36   12 Mar 2025, 23:14 Raphael de WijnSPBShift summary

SPB/SFX shift summary user experiment 6933 (setup day)

X-ray delivery
-9.6-9.72 keV with Hirex monitoring, 1.4-1.8 mJ/pulse, 352 pulses/train at 1.1 MHz pulse repetition rate, short pulses

Optical laser delivery
-ns laser for illumination

Achievements/Observations

  • Beamline aligned
  • Energy scan with Zn done and energy set around 9.72 keV (120 eV offset compared to the accelerator value)
  • Aligned and could see scattering from silver cubes
  38   17 Mar 2025, 06:51 Romain LetrunSPBIssue

The status of the FXE shutter in the Public status display DOOCS panel is incorrect. Here appears as opened, when it is actually closed.

Attachment 1: Screenshot_from_2025-03-17_06-45-52.png
Screenshot_from_2025-03-17_06-45-52.png
  39   27 Mar 2025, 22:57 Tokushi SatoSPBShift end

**X-ray delivery:**
* 16 keV, ~upto 1 mJ, 160 pulses
**Optical Laser:**
* None
**Achievements / Observations:**
* Alignement
* Recorded first explosions

  46   09 Apr 2025, 22:46 Tokushi SatoSPBShift summary

X-ray delivery:

20 keV, ~ 400 uJ, 128 pulses, stable delivery 

Optical Laser:

1030 nm, 850 fs, stable delivery


Achievements / Observations:

20 keV beam to sample position and cameras
Rough alignment of optical setup
 

Issues:

Optical laser from light conversion had issue with shutter control

  47   10 Apr 2025, 23:17 Tokushi SatoSPBShift summary

X-ray delivery:

20 keV, ~ 400 uJ, 128 pulses, stable delivery 

Optical Laser:

1030 nm, 850 fs, stable delivery


Achievements / Observations:

Rough timing alignment of optical laser setup
Took some initial data 

Issues:

No major issue to report

  48   11 Apr 2025, 23:14 Tokushi SatoSPBShift summary

X-ray delivery:

20 keV, ~ 400 uJ, 246 pulses, stable delivery

Optical Laser:

1030 nm, 850 fs, stable delivery

Achievements / Observations:

Spatial and temporal alignment of optical laser setup
Data collection

  49   12 Apr 2025, 23:15 Tokushi SatoSPBShift summary

X-ray delivery:

20 keV, ~ 500 uJ, 246 pulses, stable delivery

Optical Laser:

1030 nm, 850 fs, stable delivery

Achievements / Observations:

Lots of data collection

Issues:

Shimadzu camera for Schlieren imaging had issue with shutter, mechanically broken.

  50   13 Apr 2025, 22:55 Tokushi SatoSPBShift summary

Staff: PV, TS, JK, FK, + users

X-ray delivery:

20 keV, ~ 300-400 uJ, 250 pulses, stable delivery 

Optical Laser:

1030 nm, 850 fs, stable delivery


Achievements / Observations:

Lots of data collection

Issues:

No major issue today

  52   14 Apr 2025, 23:08 Tokushi SatoSPBShift summary

X-ray delivery:

20 keV,  250-400 uJ, 250 pulses, stable delivery

Optical Laser:

1030 nm, 850 fs, stable delivery

Achievements / Observations:

Lots of data collection

Issues:

No major issue today

  53   17 Apr 2025, 01:39 Chan KimSPBShift summary

X-ray delivery

  • 18.8 keV, 260 uJ pulse energy

Optical laser delivery

  • No optical laser

Achievements/Observations

  • Experimental setup optimized, both instrumental side and PIXIE side
  • X-ray beam focused to the PIXIE and transmission measurement was done with several different PIXIE operation conditions.

Issues

  • No beam for ~4.5 hours due to ZZ.
  • X-ray beam not found with IRDa InlineMic after focusing X-ray beam to IRDa sample plane.
  • InlineMic Y motor is in error states. It has to be fixed during the day.
  • upstream kapton window for the downstream vacuum pipe broken. The glue has become loose. No damage by X-ray was visible.
  54   24 Apr 2025, 06:56 Jayanath KoliyaduSPBShift summary

X-ray delivery:

10 keV, ~ 900 uJ, 128 pulses, tuning was needed for few hours

Achievements / Observations:

Alignment of crystals

Issues:

X-ray beam intensity was weak at 12.7 keV (100 uJ), so we decided to use 10 keV

  56   25 Apr 2025, 06:48 Tokushi SatoSPBShift summary

X-ray delivery:

10 keV, ~ 850 uJ, 128 pulses, tuning was needed for 1 hour 

Optical Laser:

No PP-laser for this week


Achievements / Observations:

Finalized alignment of crystals

Issues:

No major issue today.

  57   26 Apr 2025, 06:55 Tokushi SatoSPBShift summary

Staff: PV, TS, JK + external collaborators 

X-ray delivery:

10 keV, ~ 800 uJ, 128 pulses, tuning was needed for 10 min. 

Optical Laser:

No PP-laser for this week


Achievements / Observations:

Finalized alignment of X-ray setup

Issues:

No major issue today.

ELOG V3.1.4-7c3fd00