Entry   Shift summary, posted by Chan Kim on 19 Feb 2025, 21:25 

X-ray delivery
-12.4 keV, 202 pulses, 0.5 MHz, 1mJ/pulse

Optical laser delivery
- ns laser (660 nm wavelength) for jet illumination

Achievements/Observations
- NKB focus optimized
- One PCS user program successfully finished
- Second PCS user program was just started

Issues
- Right before we could start with beam defocusing, the beam was gone around 8:45 pm. BKR called to let us know that there will be no beam today (cryo issues)

Entry   Shift summary, posted by Chan Kim on 20 Feb 2025, 23:29 

X-ray delivery

  • 12.4 keV, 1.1mJ/pulse, 202 pulses/train at 0.56MHz
  • Focused NKB beam was used

Optical laser delivery

  • ns laser for jet visualization

Achievements/Observations

  • Successfully finished all PCS beamtimes
  • Stable jet with PEO sheath

Issues

  • No beam in the morning
  • Unstable jet with ethanol sheath
Entry   Shift summary, posted by Mohammad Vakili on 21 Feb 2025, 23:21 

SPB/SFX shift summary user experiment 8039

**X-ray delivery**
-15 keV with Hirex monitoring, 0.5 mJ/pulse, 202 pulses/train at 0.56 MHz pulse repetition rate

**Optical laser delivery**
-810 nm laser for illumination

**Achievements/Observations**
- Collected sample data for ca. 2h 15min using a DFFN 
- XTD2 CRLs optimized and realigned
- Offset mirror M1/M2 optimized for 15 keV
- Repositioned the illumination fiber inside IRU chamber
- Germanium blades were installed for the IRU_Slit_4 (top and bottom)

**Issues**
- PP laser alignment could not be pursued as hexapod had to be repositioned first (interaction region was too close to exit cone)

 

 

 

Entry   Shift summary, posted by Jayanath Koliyadu on 25 Feb 2025, 02:41 

X-ray delivery
-15 keV with Hirex monitoring, 0.5 mJ/pulse, 202 pulses/train at 0.56 MHz pulse repetition rate
Optical laser delivery
- 810 nm laser for illumination
-PP laser for excitation, 590 nm, 51 pulses, 141 kHz
Achievements/Observations

  • Collected high resolution time resolved data
  • Collected Tve_CPC500f and Tve_CPC1n data and completed Tve_CPC20p

 

Entry   Shift summary, posted by Tokushi Sato on 27 Feb 2025, 07:02 

X-ray delivery

    up to 202/352 pulses per train (~0.8 mJ pulse energy)@13.4 keV, 0.5/1.1 MHz 

Optical laser delivery

    800 nm, less than 20 fs at sample position, no issue


Achievements/Observations

    X-ray beam de-focused to a few um for data taking

    PP laser aligned

    Fixed target measurement was finished

Entry   Shift summary, posted by Tokushi Sato on 28 Feb 2025, 06:57 

X-ray delivery

    up to 202/352 pulses per train (~0.8 mJ pulse energy)@13.4 keV, 0.5/1.1 MHz 

Optical laser delivery

    800 nm, less than 20 fs at sample position, no issue


Achievements/Observations

    X-ray beam de-focused to a few um for data taking

    PP laser aligned

    Data collection for some samples

Issues


    No major issue today

Entry   Shift summary, posted by Tokushi Sato on 01 Mar 2025, 06:56 

X-ray delivery

    up to 202/352 pulses per train (~0.8 mJ pulse energy)@13.4 keV, 0.5/1.1 MHz 

Optical laser delivery

    800 nm, less than 20 fs at sample position, no issue


Achievements/Observations

    X-ray beam de-focused to a few um for data taking

    PP laser aligned

    Data collection for some samples
 

Entry   Shift summary, posted by Tokushi Sato on 02 Mar 2025, 06:56 

X-ray delivery

    up to 175 pulses per train (~1 mJ pulse energy)@13.4 keV, 0.5 MHz

Optical laser delivery

    800 nm, less than 20 fs at sample position, no issue


Achievements/Observations

    X-ray beam de-focused to a few um for data taking

    PP laser aligned

    Data collection for some samples

Issues


    We could use 188 pulses, but last 13 pulses intensity was too weak, not used for measurement

Entry   Shift summary, posted by Tokushi Sato on 03 Mar 2025, 07:05 

X-ray delivery

    up to 188 pulses per train (~1 mJ pulse energy)@13.4 keV, 0.5 MHz

Optical laser delivery

    800 nm, less than 20 fs at sample position, no issue


Achievements/Observations

    X-ray beam de-focused to a few um for data taking

    PP laser aligned

    Data collection for some samples

Entry   Shift summary, posted by Tokushi Sato on 04 Mar 2025, 07:05 

X-ray delivery

    up to 188/352 pulses per train (~1 mJ pulse energy)@13.4 keV, 0.5/1.1 MHz

Optical laser delivery

    800 nm, less than 20 fs at sample position, no issue


Achievements/Observations

    X-ray beam de-focused to a few um for data taking

    PP laser aligned

    Data collection for some samples

Entry   Shift summary, posted by Raphael de Wijn on 12 Mar 2025, 23:14 

SPB/SFX shift summary user experiment 6933 (setup day)

X-ray delivery
-9.6-9.72 keV with Hirex monitoring, 1.4-1.8 mJ/pulse, 352 pulses/train at 1.1 MHz pulse repetition rate, short pulses

Optical laser delivery
-ns laser for illumination

Achievements/Observations

  • Beamline aligned
  • Energy scan with Zn done and energy set around 9.72 keV (120 eV offset compared to the accelerator value)
  • Aligned and could see scattering from silver cubes
Entry   Shift summary, posted by Tokushi Sato on 09 Apr 2025, 22:46 

X-ray delivery:

20 keV, ~ 400 uJ, 128 pulses, stable delivery 

Optical Laser:

1030 nm, 850 fs, stable delivery


Achievements / Observations:

20 keV beam to sample position and cameras
Rough alignment of optical setup
 

Issues:

Optical laser from light conversion had issue with shutter control

Entry   Shift summary, posted by Tokushi Sato on 10 Apr 2025, 23:17 

X-ray delivery:

20 keV, ~ 400 uJ, 128 pulses, stable delivery 

Optical Laser:

1030 nm, 850 fs, stable delivery


Achievements / Observations:

Rough timing alignment of optical laser setup
Took some initial data 

Issues:

No major issue to report

Entry   Shift summary, posted by Tokushi Sato on 11 Apr 2025, 23:14 

X-ray delivery:

20 keV, ~ 400 uJ, 246 pulses, stable delivery

Optical Laser:

1030 nm, 850 fs, stable delivery

Achievements / Observations:

Spatial and temporal alignment of optical laser setup
Data collection

Entry   Shift summary, posted by Tokushi Sato on 12 Apr 2025, 23:15 

X-ray delivery:

20 keV, ~ 500 uJ, 246 pulses, stable delivery

Optical Laser:

1030 nm, 850 fs, stable delivery

Achievements / Observations:

Lots of data collection

Issues:

Shimadzu camera for Schlieren imaging had issue with shutter, mechanically broken.

Entry   Shift summary, posted by Tokushi Sato on 13 Apr 2025, 22:55 

Staff: PV, TS, JK, FK, + users

X-ray delivery:

20 keV, ~ 300-400 uJ, 250 pulses, stable delivery 

Optical Laser:

1030 nm, 850 fs, stable delivery


Achievements / Observations:

Lots of data collection

Issues:

No major issue today

Entry   Shift summary, posted by Tokushi Sato on 14 Apr 2025, 23:08 

X-ray delivery:

20 keV,  250-400 uJ, 250 pulses, stable delivery

Optical Laser:

1030 nm, 850 fs, stable delivery

Achievements / Observations:

Lots of data collection

Issues:

No major issue today

Entry   Shift summary, posted by Chan Kim on 17 Apr 2025, 01:39 

X-ray delivery

  • 18.8 keV, 260 uJ pulse energy

Optical laser delivery

  • No optical laser

Achievements/Observations

  • Experimental setup optimized, both instrumental side and PIXIE side
  • X-ray beam focused to the PIXIE and transmission measurement was done with several different PIXIE operation conditions.

Issues

  • No beam for ~4.5 hours due to ZZ.
  • X-ray beam not found with IRDa InlineMic after focusing X-ray beam to IRDa sample plane.
  • InlineMic Y motor is in error states. It has to be fixed during the day.
  • upstream kapton window for the downstream vacuum pipe broken. The glue has become loose. No damage by X-ray was visible.
Entry   Shift summary, posted by Jayanath Koliyadu on 24 Apr 2025, 06:56 

X-ray delivery:

10 keV, ~ 900 uJ, 128 pulses, tuning was needed for few hours

Achievements / Observations:

Alignment of crystals

Issues:

X-ray beam intensity was weak at 12.7 keV (100 uJ), so we decided to use 10 keV

Entry   Shift summary, posted by Tokushi Sato on 25 Apr 2025, 06:48 

X-ray delivery:

10 keV, ~ 850 uJ, 128 pulses, tuning was needed for 1 hour 

Optical Laser:

No PP-laser for this week


Achievements / Observations:

Finalized alignment of crystals

Issues:

No major issue today.