Group Selection Page HELP DOC Controls Group Data Analysis Group ITDM WP76 DET Vacuum XRO EEE WP78 WP74 FXE SCS SPB MID HED SQS SXP Sample Environment Photon Commissioning Team Operation PSPO XO TS
OPERATION-2024 OPERATION-2023 OPERATION-2022 OPERATION-2021 OPERATION-2020 OPERATION-2019 SASE1-2018 SASE1-2017 Experiment data
  OPERATION-2024 logbook, Contact: F.Wolff-Fabris, A.Galler, H.Sinn, Page 1 of 11  Not logged in ELOG logo
ID Date Author Group Subjectdown Text Attachments
  79   10 Apr 2024, 16:35 Antje TrappXROstart of shift - statusStarting shift with mirror motor calibration:

- beam is centered on FEL imager

- pblm in XTD9 is inserted
 Init_2024-04-10_16-34-30.pngstatus_2024-04-10_16-46-01.pngFEL_imag_2024-04-10_16-40-29.pngpblm_2024-04-10_16-52-34.png 
  78   10 Apr 2024, 16:35 Antje TrappXROstart of shift - statusStarting shift with mirror motor calibration:

- found solid attenuator 0.5mm
silicon inserted
 Init_2024-04-10_16-34-30.pngstatus_2024-04-10_16-46-01.pngFEL_imag_2024-04-10_16-40-29.pngpblm_2024-04-10_16-52-34.png 
  98   09 May 2024, 10:45 Tommaso MazzaSQSotherwe needed SASE1 to be set to 0 pulses briefly
to check alignment in our experiment.

The FXE control hutch was empty.
  
  44   01 Mar 2024, 17:11 Naresh KujalaPRCStatus-Machine status

the cold compressor failure occurred
at ~16.30hr today. And it will take around
  
  48   13 Mar 2024, 10:09 Romain LetrunSPBStatusWe checked the XTD2 attenuators following
the intervention from XRO (compar ewith elog:37, before the intervention).
 7x 
  77   10 Apr 2024, 11:55 Harald SinnPRCStatusYesterday two motors of the SASE2 seeding
mono were damaged. The mono was exchanged
in the afternoon and pumped down. Currently,
  
  83   18 Apr 2024, 19:31 Jan GruenertPRCStatusThe intra-bunchtrain feedback (IBFB) was
not active until today afternoon.
Although not strictly required or
  
  89   25 Apr 2024, 21:11 Frederik Wolff-FabrisPRCStatusV0 valve for SA2 closed as the pump P22090I
at HED branch enters in wrong state. This
closed nearby vacuum valves for HED branch and
 Screenshot_2024-04-25_211325.png 
  107   17 May 2024, 10:42 Dirk RaiserSQSStatusLaser status:

After the laser issues listed in https://in.xfel.eu/elog/OPERATION-2024/99 the
  
  166   14 Sep 2024, 01:33 Peter ZaldenFXEStatusFXE received the beam and did not change
accelerator settings.

Beam alignment to FXE was re-established
  
  180   27 Sep 2024, 15:17 Jan GruenertPRCStatusBunch pattern SA1 / SA3

SQS
requests to change the bunch pattern.
Currently SA1/SA3 run interleaved
  
  186   29 Sep 2024, 12:13 Jan GruenertPRCStatusBeam is back. Current status:

SASE1 (SPB/SFX)


2.72
mJ, 352 bunches/train, 6 keV


SASE2 (MID)


880 uJ,
 JG_2024-09-29_um_12.12.28.png 
  192   07 Oct 2024, 16:34 Naresh KujalaPRCStatusDesy Laser group has fixed the issue about
the laser Synchronization.

https://ttfinfo.desy.de/XFELelog/show.jsp?dir=/2024/41/07.10_M&pos=2024-10-07T14:51:12
  
  209   24 Nov 2024, 17:23 Jan GruenertPRCStatusStatus

All beamlines in operation.
The attachment ATT#1 shows the beam
delivery of this afternoon, with the pulse
 JG_2024-11-24_um_17.22.58.png 
  53   15 Mar 2024, 18:02 Tommaso MazzaSQSStability Issueit is not clear why, but the beam position
on BIU2 has changed over time, even more
since we checked last. it is off in both
 Screenshot_from_2024-03-15_18-04-59.pngScreenshot_from_2024-03-15_18-04-39.png 
  112   26 May 2024, 21:56 Thomas BaumannSQSStability IssueWe asked the machine for two color mode
in the morning. Tuning gave good results
at first (1.6mJ second color, 100uJ first
  
  187   29 Sep 2024, 22:29 Chan KimSPBStability IssueX-ray beam is continuously drifting in
the vertical direction (XTD9_XGM)
It affects our NKB focus and focused
 Screenshot_from_2024-09-29_22-24-09_1.pngScreenshot_from_2024-09-29_22-24-00.png 
  3   27 Jan 2024, 15:17 IdoiaXROShift summarySASE3
Open Issues:
- currently it is not possible to
  
  5   31 Jan 2024, 23:26 Chan KimSPBShift summary31.01.2024 (Day shift)

X-ray delivery


10 keV
1200
  
  6   01 Feb 2024, 07:14 Natalia GerasimovaSCSShift summaryMoning shift summary (31.01 and 01.02)

Acievements:
- SRA recalibrated, cross position
  
ELOG V3.1.4-7c3fd00