ID |
Date |
Author |
Group |
Subject |
79
|
10 Apr 2024, 16:35 |
Antje Trapp | XRO | start of shift - status |
Starting shift with mirror motor calibration:
- beam is centered on FEL imager
- pblm in XTD9 is inserted
We removed both silicon solid attenuator and pblm |
Attachment 1: Init_2024-04-10_16-34-30.png
|
|
Attachment 2: status_2024-04-10_16-46-01.png
|
|
Attachment 3: FEL_imag_2024-04-10_16-40-29.png
|
|
Attachment 4: pblm_2024-04-10_16-52-34.png
|
|
78
|
10 Apr 2024, 16:35 |
Antje Trapp | XRO | start of shift - status |
Starting shift with mirror motor calibration:
- found solid attenuator 0.5mm silicon inserted
- beam is centered on FEL imager
- pblm in XTD9 is inserted
We removed both silicon solid attenuator and pblm |
Attachment 1: Init_2024-04-10_16-34-30.png
|
|
Attachment 2: status_2024-04-10_16-46-01.png
|
|
Attachment 3: FEL_imag_2024-04-10_16-40-29.png
|
|
Attachment 4: pblm_2024-04-10_16-52-34.png
|
|
98
|
09 May 2024, 10:45 |
Tommaso Mazza | SQS | other |
we needed SASE1 to be set to 0 pulses briefly to check alignment in our experiment.
The FXE control hutch was empty. we could not reach either Chris nor Mykola by phone. The XFEL_StatusPublic shows that the FXE shutter is closed (we can also see the exp hutch door open from outside the control hutch).
Neither PRC nor BKR had any information about the FXE status.
We discussed with PRC and concluded that they are likely not using the beam, so in agreement with PRC we went ahead and got BKR setting SASE1 to 0 pulses at ~10:20. After few seconds, we got BKR setting SASE1 back to 30 pulses.
edit: PRC got in contact with FXE. Turns out they were (are) working in their ILH. we have a contact procedure for the next occasions now. |
44
|
01 Mar 2024, 17:11 |
Naresh Kujala | PRC | Status |
-Machine status
the cold compressor failure occurred at ~16.30hr today. And it will take around 35 hr to fix it. I will update via email (local contacts for experiments) and Operation Elog tomorrow with more details.
Naresh
|
48
|
13 Mar 2024, 10:09 |
Romain Letrun | SPB | Status |
We checked the XTD2 attenuators following the intervention from XRO (compar ewith elog:37, before the intervention).
The wavefront shows similar distortions with the 75 and 150 um as earlier, which is not too surprising since the cracks are vertical.
Attachments 1-5: Beam on SPB_XTD9_SCR with XTD2 attenuator CVDs
Attachments 6-7: Beam on FEL imager with XTD2 75 and 150 um CVDs |
Attachment 1: CVD_75um_2024-03-13_09-48-27.png
|
|
Attachment 2: CVD_150um_2024-03-13_09-49-48.png
|
|
Attachment 3: CVD_300um_2024-03-13_09-50-08.png
|
|
Attachment 4: CVD_600um_2024-03-13_09-50-33.png
|
|
Attachment 5: CVD_1200um_2024-03-13_09-51-41.png
|
|
Attachment 6: CVD_75um_2024-03-13_08-06-53.png
|
|
Attachment 7: CVD_150um_2024-03-13_08-06-07.png
|
|
77
|
10 Apr 2024, 11:55 |
Harald Sinn | PRC | Status |
Yesterday two motors of the SASE2 seeding mono were damaged. The mono was exchanged in the afternoon and pumped down. Currently, an issue with the vertical cystal motion is being investigated. The vacuum improved much faster than expected after this intervention, so the hope is that the tunnel can be searched soon and electrons could go through SASE2 already this afternoon. Watch for updates in the program for SASE2 in the DESY logbook under 'Schedule'. |
83
|
18 Apr 2024, 19:31 |
Jan Gruenert | PRC | Status |
The intra-bunchtrain feedback (IBFB) was not active until today afternoon.
Although not strictly required or requested for the current week experiments,
it was decided to turn on this feedback, which should generally be active to
stabilize and improve the arrival time of the photon pulses along pulse trains.
In order to avoid complications during long data acquisitions, the PRC checked back with all ongoing experiments,
identified a suitable time slot, and the IBFB was activated without issues at aound 16h45. |
89
|
25 Apr 2024, 21:11 |
Frederik Wolff-Fabris | PRC | Status |
V0 valve for SA2 closed as the pump P22090I at HED branch enters in wrong state. This closed nearby vacuum valves for HED branch and consequently V0. Vacuum levels at the section remained in 10^-9 all time.
Thanks to VAC-OCD Denis Finze we removed this pump signal from interlock to allow operation in SA2 at MID branch. Further investigation will follow on Friday. |
Attachment 1: Screenshot_2024-04-25_211325.png
|
|
107
|
17 May 2024, 10:42 |
Dirk Raiser | SQS | Status |
Laser status:
After the laser issues listed in https://in.xfel.eu/elog/OPERATION-2024/99 the late shift was finally able to find a timing setting for the amplifier trigger that was beyond stable settings under usual conditions, but which allowed to continue taking data runs for the rest of the beamtime reliably. The users were already able to reveal indications of a pump-probe signal in their data.
The issue itself remains but didn't show up in form of unstabilities anymore. After the beamtime LAS took some effort to investigate and narrow down to either a faulty trigger going into the front-end amplifier or on the front-end amplifier itself. To the best of our knowledge this circumstance will need to involve EEE support or even a service from the manufacturer and cannot be solved solely by LAS. LAS ensured that the highest priority will be to deliver stable laser pulses for next week's beamtime as well.
FEL status:
we found the FEL poynting to be very stable troughout the last weeks beamtime (despite some short down-times), which allowed to reliably verify the spatial overlap. |
166
|
14 Sep 2024, 01:33 |
Peter Zalden | FXE | Status |
FXE received the beam and did not change accelerator settings.
Beam alignment to FXE was re-established using the new values for the old M1/M2 offset.
Monochromator aligned to the SPB energy setpoint.
THz source aligned to Xrays and several reference positions for Xray pointing taken. Further steps require THz radiation, which is not available at this point.
Xrays realigned back to SPB XTD9 screen. |
180
|
27 Sep 2024, 15:17 |
Jan Gruenert | PRC | Status |
Bunch pattern SA1 / SA3
SQS requests to change the bunch pattern.
Currently SA1/SA3 run interleaved as 131313...
The first bunch in the train (for SA1, non-lasing in SA3) nevertheless is visible as a small pre-peak in the diode signal which SQS uses to check the timing.
Therefore SQS requests to change to 31313131....
It was checked with SA1 (SPB/SFX) and the accelerator experts that this should not cause any issues (AGIPD detector is running on dynamic trigger),
therefore it was agreed that SPB/SFX informs BKR when there is a good moment without data acquisition, and BKR will make this change after informing SQS.
This change will happen within the next hour (as of 15h20). |
186
|
29 Sep 2024, 12:13 |
Jan Gruenert | PRC | Status |
Beam is back. Current status:
SASE1 (SPB/SFX)
- 2.72 mJ, 352 bunches/train, 6 keV
SASE2 (MID)
- 880 uJ, 1 bunch/train, 8 keV
SASE3 (SQS)
- 4.56 mJ, 1 bunch/train, 400 eV (3.1nm)
|
Attachment 1: JG_2024-09-29_um_12.12.28.png
|
|
192
|
07 Oct 2024, 16:34 |
Naresh Kujala | PRC | Status |
Desy Laser group has fixed the issue about the laser Synchronization.
https://ttfinfo.desy.de/XFELelog/show.jsp?dir=/2024/41/07.10_M&pos=2024-10-07T14:51:12
Naresh
PRC
wk41 |
209
|
24 Nov 2024, 17:23 |
Jan Gruenert | PRC | Status |
Status
All beamlines in operation.
The attachment ATT#1 shows the beam delivery of this afternoon, with the pulse energies on the left and the number of bunches on the right.
SA2 was not affected, SA1 was essentially without beam from 13h45 to 16h15 (2.5h) and SA3 didn't get enough (386) pulses in about the same period.
Beam delivery to all experiments is ok since ~16h15, and SCS is just not taking more pulses for other (internal) reasons. |
Attachment 1: JG_2024-11-24_um_17.22.58.png
|
|
53
|
15 Mar 2024, 18:02 |
Tommaso Mazza | SQS | Stability Issue |
it is not clear why, but the beam position on BIU2 has changed over time, even more since we checked last. it is off in both directions
we see the GATT aperture projection drifting, so it is a change in the beam transport, not in the source.
see the beam, cut by the DIAG1 slit, compared to the cross it should be centred to.
the motor encoders in the beamline have not changed since the beginning, when the beam was pointing correctly. |
Attachment 1: Screenshot_from_2024-03-15_18-04-59.png
|
|
Attachment 2: Screenshot_from_2024-03-15_18-04-39.png
|
|
112
|
26 May 2024, 21:56 |
Thomas Baumann | SQS | Stability Issue |
We asked the machine for two color mode in the morning. Tuning gave good results at first (1.6mJ second color, 100uJ first color), but as soon as any of the colors was switched off and on again the pulse energy dropped (~600uJ) and BKR had to retune to even get a fraction of the pulse energy back back. The same happened when changing the delay
|
187
|
29 Sep 2024, 22:29 |
Chan Kim | SPB | Stability Issue |
X-ray beam is continuously drifting in the vertical direction (XTD9_XGM)
It affects our NKB focus and focused beam is also drifting continuously. |
Attachment 1: Screenshot_from_2024-09-29_22-24-09_1.png
|
|
Attachment 2: Screenshot_from_2024-09-29_22-24-00.png
|
|
3
|
27 Jan 2024, 15:17 |
Idoia | XRO | Shift summary |
SASE3
Open Issues:
- currently it is not possible to change the number of pulses because of Instruments beam permission interlock
Done:
- VSLIT was calibrated with diffraction fringes (it was off by 41 microns, the bottomo blade encoder was recalibrated to compensate this error)
https://in.xfel.eu/elog/XRO+Beam+Commissioning/319
- various setting points were checked at 20 mrad using mirror switch, no particular problems found
https://in.xfel.eu/elog/XRO+Beam+Commissioning/310
https://in.xfel.eu/elog/XRO+Beam+Commissioning/306
- ESLITS width was measured using diffracted beam. No Calibration was applied, we will discuss with instruments if this is needed/wished
https://in.xfel.eu/elog/XRO+Beam+Commissioning/323
https://in.xfel.eu/elog/XRO+Beam+Commissioning/324
https://in.xfel.eu/elog/XRO+Beam+Commissioning/325
- ATTENTION: SQS ans SXP ESLITS motors are now moving in the opposite direction as before (please look at the updated picture on the scene). Software limit switches are real limits: do not deactivate them
SCS ESLIT was already in this way: now all the ESLITs are configured similarly (no Elmo controllers anymore)
- SRA calibration was recalibrated
https://in.xfel.eu/elog/XRO+Beam+Commissioning/313
- FEL imager cross adjusted to GATT
https://in.xfel.eu/elog/XRO+Beam+Commissioning/307
SASE2
Open Issues
- HED Mono1 still not going through until HED popin. Paralleism of crystals achieved. Transmission is ok until Beam Monitor but not further.
Beam height was checked but the problem remained
Done:
- M3 mirror realigned, Euler motion roughly calibrated.
ATTENTION: Old saved values are no longer usable. "XRO setpoints" must be used as a starting point for further alignment
- Positions C and E were saved
- The fast flipping positions were almost found, see here: https://in.xfel.eu/elog/XRO+Beam+Commissioning/322
Unfortunately, beam was suddenly off and the procedure was not complete
- No particular problems found
SASE1
- FXE and SPB trajectory rechecked, no particular problems found
ATTENTION:
- M1 & M2 motors were found with wrong scaling factors (since some times). They are corrected while maintaining the mirror positions. (Most affected was M1 vertical motors which is rarely used).
- saved positions are using the "fast flipping option" meaning that you can switch between the two only using M2 RY
https://in.xfel.eu/elog/XRO+Beam+Commissioning/283
https://in.xfel.eu/elog/XRO+Beam+Commissioning/282
- CRL1 motor calibrations were lost, and restored from 6th Dec. In case if there are further issues, contact Control. |
5
|
31 Jan 2024, 23:26 |
Chan Kim | SPB | Shift summary |
31.01.2024 (Day shift)
X-ray delivery
- 10 keV
- 1200 - 400 uJ (significant pulse energy slope within train)
Optical laser delivery
Achievements/Observations
- Flat fields and timing scans were measured for AGIPD (1.1MHz, normal CDS mode)
Issues
To do for next shift
- Continue with the detector program
|
6
|
01 Feb 2024, 07:14 |
Natalia Gerasimova | SCS | Shift summary |
Moning shift summary (31.01 and 01.02)
Acievements:
- SRA recalibrated, cross position on FEL imager found
- VSLIT in SA3 check calibration
- LEPM angle changed for LRGR. Calibration of photon energy server done with help of Ne in GATT.
- Several configurations for SCS have been adjusted/established
|