Issue, posted by Yifeng Jiang on 07 Apr 2023, 23:57
|
After receiving beam from SPB, we noticed that there is a werid shape of beam in the FEL imager which was not observed yesterday.
Maybe someone left X-ray component in the beam. |
Shift summary, posted by Johan Bielecki on 07 Apr 2023, 23:03
|
Beam delivery for proposal 3378
Achievements/Observations
- Collected data on liquid H20 and D20
- Found conditions where only ice were seen. approx. 4h of ice data taken. Starting to look at correlation maps
- Background at 0.88mm nozzle distance measured
To do for next shift:
Continue taking data
|
HED Shift Summary 07.04., posted by Alejandro Laso Garcia on 07 Apr 2023, 23:00
|
Morning - Users from proposal 3455 continued with their measurement program. Beam stable during the measurements.
Afternoon - Changed the setup from 3455 to 3326.
Evening - Beginning of the alignment for users. Beam stable. |
XTD2 Si500 attenuator broken, posted by Johan Bielecki on 04 Apr 2023, 11:18
|
Attachment 1: Beam in SPB hutch with Si500
Attachment 2: Beam without Si500 |
Issue, posted by Frederik Wolff-Fabris on 04 Apr 2023, 08:37
|
TUE 08:30AM:
The SA3 Cell 17 & 18 Phase shifters do not move and encoders are damaged. A ZZ is needed to exchange the encoders. Instruments are informed and access will take place Tuesday morning. Machine has separated the north branch.
*** Update 10:20AM:
ZZ is finished; beam in North Branch to restart soon.
|
Summary day shift 2023-04-04, posted by Lisa Randolph, Carsten Baehtz, Alexander Pelka on 04 Apr 2023, 07:11
|
04 Apr 2023, 07:44 we realize that the SetpointsHED Macro lost all values, probably during the Karabo Crash. Since it is a macro, the values arent stored anywhere. DOC tries to recover. Meanwhile, we found the values for 3mrad, 2.5mrad and 2mrad in old screenshots and update the macro values from that. Saving those now locally in nextcloud/user/Alex.
04 Apr 2023, 08:17 Solution by DOC: Apparently the macro CAN save the values, and that was also done during the bringupdays, but they are only saved on the GUI Server which the macro was started on, in this case GUI2. However, when Karabo was restarted, the macro was started on GUI1, so the local save files could not be retrieved. DOC copied the old save files to GUI1 now as well so we could reload the old positions for all setpoints.
|
Night shift summary 02.04.2023, posted by Loic, Yi-Ping on 03 Apr 2023, 06:38
|
Achievements:
Collected more scans on cyanocobalamin, both delays scans and dynamic XAS
Issues with bad signal in beginning but good signal in the last hours
Overall successful beamtime, demonstrating new transmission/absorption setup with liquid jet and DSSC
Problems:
None |
Late Shift Summary, posted by Benjamin van Kuiken on 02 Apr 2023, 04:46
|
Achievement
- Measured tXAS at the Fe L-edge of Fe(bpy)3 using both delay and energy scans.
Issues
- The cold traps ran empty on the chamber resulting in a pressure spike that interlocked the DSSC
- The rough vacuum of the chem DPS degraded causing TP5 to go into error. This resulted in valve closing and stopping the measurements
- Jet froze twice
|
Shift summary, posted by Tokushi Sato on 01 Apr 2023, 06:51
|
X-ray delivery
- 1-202 pulses, 564 kHz, stable delivery
- Beam was down from 06:08
Optical laser delivery
- 800nm, 50 fs, 282 kHz, stable delivery
Achievements/Observations
- Resasnable amout of data was collected
Issues
|
Shift summary, posted by Tokushi Sato on 31 Mar 2023, 06:59
|
X-ray delivery
- 1-202 pulses, 564, 282, 141 , 70.5 kHz, stable delivery
Optical laser delivery
- 800nm, 50 fs, 282 kHz, stable delivery
Achievements/Observations
- Resasnable amout of data was collected
- Sample was tested
Issues
|
Late Shift Summary, posted by Benjamin, Yi-Ping, Ru-Pan, Andreas on 31 Mar 2023, 05:10
|
Achievements
- Optimized BOZ for Co and Fe
- Estabilished Stable liquid jet flow with 30 mM Fe(bpy)3
Problems
- Jet froze several times
- Chamber warmed up earlier in the day. This led to a "dusting" of CNCbl on many surfaces and in the large turbo. We cleaned the turbo with ethanol.
Plan for Night Shift
- Continue measuring stitic XAS with BOZ scheme.
|
shift summary March 30th, posted by Jörg Hallmann on 31 Mar 2023, 01:51
|
- seeding at ~800 uJ
- repaired the laser interlock of A.08
- EPIX back in operation
- timing difference of both branches of the SDL measured with the optical laser (~4ps)
- measurement of samples with single & both branches (damage threshold, crystallization studies & studies on reversible changes)
|
Shift summary, posted by Tokushi Sato on 30 Mar 2023, 06:53
|
X-ray delivery
- 1-202 pulses, 564, 282, 141 kHz, stable delivery
Optical laser delivery
- 800nm, 50 fs, 282 kHz, stable delivery
Achievements/Observations
- Alignment for Pump-probe experiment was finished
- Sample was tested
Issues
|
Shift Summary, posted by Benjamin, Robert, Yi-Ping, Ru-Pan on 30 Mar 2023, 04:16
|
Achievements
- Found coarse timing between XFEL and optical laser
Problems
- Did not see a observe fine timing signal from silicon nitride measurement
Plan for night shift
- Continue with liquid jet optimization and static measurements
|
shift summary March 29th, posted by Jörg Hallmann on 30 Mar 2023, 02:37
|
achievments: alignment of the SDL (both branches)
measuring of samples & calibrants
issues:
- broken laser interlock - cannot be set - PRC is informed and contacted SRP - repair expected in the morning
- ScannerX broken - morning shift might contact DOC or expert
- EPIXs do not send data after rearrangement of the modules - expert consulation might be necessary |
Shift summary March 28th, posted by Jörg Hallmann on 29 Mar 2023, 01:31
|
Seeding at 9 keV with 800 - 1000uJ intensity
1. alignment of the lower branch of the SDL
2. focussing with CRL2 and check of the beam size using wire scans (slightly more than 10 um)
3. calibration of the EPIX2 position using calibrant LaB6 and optimizing its position
4. measuring scattering of the sample (not a conclusive behaviour yet) |
Issue, posted by Angel Rodriguez Fernandez on 28 Mar 2023, 15:26
|
The door from MID side entrance was smashed and we lost the radiation permit.
The acciedent happened between 11 (when the door was lest use by MID members) and 14:19 (when the picture was taken).
It is possible that we will have the permit in the next hours to countinue.
The Door was repared by TS (thank you for the fast answer) and at 15:40 Eric gave us the right to proceed after the crosscheck of all the systems. |
Shift end, posted by Jayanath Koliyadu on 26 Mar 2023, 23:27
|
X-ray delivery
- 1-165 pulses, 1.1 MHz - 56.4 kHz, upto 350 uJ @ 50 pC
Optical laser delivery
Achievements/Observations
- Collected data for about 6 hours with different samples
- Data collection at lower repetiton rates with less number of pulses
- Data to characterize the divergence of ASE collected
- Photodiode calibrated at 8 keV again
|
Status, posted by Naresh Kujala on 26 Mar 2023, 13:26
|
Machine RC Raimond informed PRC that there is an issue with the A4 module that needs to fix to have a continuous operation. To fix this they need 20 min.
Agreed with all instruments (SPB, SQS, and HED) that at 13:30hr machine will take over the beam for 20 min.
Update: 13:55hr
Machine finished fixing the issue for the A4 module and beam handover to all beamlines.
|
Shift end, posted by Jayanath Koliyadu on 25 Mar 2023, 23:18
|
X-ray delivery
- 1-165 pulses, 1.1 MHz - 56.4 kHz, upto 350 uJ @ 50 pC
Optical laser delivery
Achievements/Observations
- Collected data for 3 to 4 hours with different samples
- Data collection at lower repetiton rate (113 kHz) with less number of pulses
- Data to characterize the divergence of ASE collected
|