Entry   Issue, posted by Jan Gruenert on 08 Jun 2023, 17:05 image.png
SA2_XTD1_ATT solid attenuator vacuum issue

Info from VAC (Raul Villanueva) 12h30:

It seems to be a leak in the arm nr. 6 (2.4mm CVD Diamond). This has escalated to trip several times the vacuum sector interlock.
On top of that, we also discover an issue with the configuration of a ion pump controller that have required the intervention of DOC / EEE. 
Entry   Issue, posted by Jan Gruenert on 09 Jun 2023, 12:37 
Repair of SA2_XTD1_ATT

Status 12h30:
The current MID users took beam until 9am, only then the machine could start preparing for the tunnel access e.g. by decoupling the South branch,
Entry   Issue, posted by Jan Gruenert on 10 Jun 2023, 18:46 
18h05 : RC informs:

Machine is down, because Cryo-OK was lost.
Apparently it is a turbine but not the cold compressors.
Entry   Status, posted by Jan Gruenert on 10 Jun 2023, 21:52 JG_2023-06-10_um_21.55.46.png
The Cryo team solved the problems, beam is back.
Downtime from 17h59 until 21h03.
Entry   Issue, posted by Michaela Petrich on 16 Jun 2023, 06:28 
staus of JUN16, 11:30

SA1 and SA3 have been adjusted to acceptable conditions to be compatible with simultaneus operation at SA2

tuning on SA2 is ongoing
Entry   Status, posted by Frederik Wolff-Fabris on 23 Jul 2023, 17:28 
Photon Activities by XPD colleagues in SA3 are concluded on Sunday 23.07 at 17:00. The photon commissioning activities are concluded for this
week.

The PRC agrees with RCs to handle beam back to BKR for further tuning activities while touching common nobs.
Entry   Status, posted by Harald Sinn on 25 Jul 2023, 19:18 
After the 12 hour cryo failure last night, it was decided to exchange a faulty window with some reduced transmission at the injector laser today
(see email by Andreas to xo-info yesterday). 

This was sucessful and the injector tunnel was closed today 16:40 and restart of the gun is ongoing. Tomorrow ramp up and SASE tuning.
Entry   Status, posted by Harald Sinn on 28 Jul 2023, 14:46 
As discussed, there will be a beam interuption form 14:45 until probably 15:45 related to jitter studies at A1 that the BKR would like to try out. 

Harald
Entry   Status, posted by Harald Sinn on 28 Jul 2023, 15:37 
Good news: The 'jitter'-tests was sucessful and BKR could identify the jitter source related to a wrong software setting around the AH1 module
of injector.

This was now fixed and the jitter has disappeared 
Entry   Issue, posted by Harald Sinn on 29 Jul 2023, 17:57 
The hutch search of SASE3, SXP became defective around 5am. 

DESY MPS group replaced a defective warning light unit and now it seems ok.
Entry   Issue, posted by Raśl Villanueva-Guerrero on 10 Aug 2023, 22:43 image_2023-08-10_225040511.png
Here is a capture of the observed issue with the SPB shutter the past night.

 

Observe the two opening/closing incidents: the first kept the shutter "OPEN" signal during 4 minutes aprox., and the second did
Entry   SA1 status, posted by Naresh Kujala on 22 Aug 2023, 15:52 
SA1 photon beam line status

- CRL1 lenses are in the beam. 

- The shutter between XTD2 and XTD9 is closed (The reason is not known)
Entry   SA1 status, posted by Naresh Kujala on 22 Aug 2023, 15:56 
SA1 photon beam line status

- CRL1 lenses are in the beam. 

- The shutter between XTD2 and XTD9 is closed (The reason is not known)
Entry   Status, posted by Naresh Kujala on 22 Aug 2023, 18:15 
Photon beam delivery status:

- Machine informed that beam will be handover to instruments SA1 (SPB/SFX) and SA3 (SXP) at 18.30hr

- Machine needs more time for SA2 and the next update will be at 20hr.
Entry   Status, posted by Naresh Kujala on 26 Aug 2023, 08:23 
- Machine updates;

Saturday 1:30 hr Cold compressor failed. The initial estimation of downtime was 20 hr, later in today morning crew gave a new estimation of time
of 30 hr. So the machine will be switched on and beam delivery to instruments will be tomorrow morning. Today at 3 pm, I will get more information and
Entry   Status, posted by Naresh Kujala on 26 Aug 2023, 18:02 
Dear All,

Two important machine updates.

1) Still, the forecasted time for the start-up of the machine will be tomorrow morning.
Entry   Status, posted by Naresh Kujala on 09 Sep 2023, 07:54 
Info from MRC (Lars)

-----------------------------------------------------------------------------

The cryo crew reports that the cold compressor that failed is, alas!,
Entry   Status, posted by Naresh Kujala on 09 Sep 2023, 11:36 
- Due to the failure of the cryo cold compressor. The machine is down.

- Next update 9 pm today

Please do watch public display for status info.
Entry   Status, posted by Naresh Kujala on 09 Sep 2023, 15:03 
Info from Machine RC (Lars):

----------------------------------------------------------------------------------------------------------------------------------------

Author: Froehlich
Entry   SA1 status, posted by Jan Gruenert on 19 Sep 2023, 18:58 
Concerning SASE1:

Please note that for this week the "remote power limit" was set to 5 Watt in order to protect CRL1.
The photon energies this week are 5.5 keV (FXE, day) and up to 7keV (SPB/SFX, night).