  305   23 May 2023, 21:41 Orkidia BilaniXHEXPInformationDay and Evening Report

SQS: The chiller at SQS is running very hot, currently at 21:35 is by 36.3°C. A ventilator is nonstop trying to "cool down". No one from SQS now present (see pics 1 and 2)

SCS: L.Adriano wants to bring a  Werkzeugschrank and a Rollwagen (inkl. the box with liquid gases and accessories/supplies) into the shaft building. Transport on Tuesday at around 13:00. He also mentioned that he has 1-2 cabinets, to give us, but needs to check first where they are

            (see pic 3)

MID: They will dismount the clean tent located near their hutch (close to the yellow beam pipes). Sascha will support with craning on 24.05.2023 at ca. 13:00. Also they will remove/dispose non usable things from the hall. (see pics 4 and 5)

ITDM: The waste of the IBM computers u.ä. was disposed.

Consumables: The grey box is completely finished, :-) . Sascha please name them (I placed already the yellow sticky note to the drawer nr.4). Sorting out is almost at the end.

 

Attachment 1: IMG_20230523_213646_MP.jpg
IMG_20230523_213646_MP.jpg
Attachment 2: IMG_20230523_213659_MP.jpg
IMG_20230523_213659_MP.jpg
Attachment 3: IMG_20230523_213359_MP.jpg
IMG_20230523_213359_MP.jpg
Attachment 4: IMG_20230523_213440_MP.jpg
IMG_20230523_213440_MP.jpg
Attachment 5: IMG_20230523_213449_MP.jpg
IMG_20230523_213449_MP.jpg
  306   24 May 2023, 20:01 Sascha MenzelXHEXPInformationMID Support

Der Reinraum von MID ist demontiert worden und benötigte dabei Unterstützung von XHCrew. Die Filtereinheiten mit dem Hallenkran vom Reinraumdach auf Paletten gekrant, danach den ganzen Reinraum mit dem Hallenkran angehoben und die Beine/Füße demontiert. Die Dacheinheit abgelassen und den Rest demontiert. Diverse Profile und Lamellen auf Paletten gelegt. Die Paletten wurden in die Lkw-Schleuse transportiert und werden von der Desy Transportgruppe am 25.05 abgeholt.

Coworkers: S.Menzel, A.Bartmann, 4 Personen von Desy

Attachment 1: IMG_20230523_213440_MP.jpg
IMG_20230523_213440_MP.jpg
Attachment 2: Image20230524200041.jpg
Image20230524200041.jpg
Attachment 3: Image20230524152834.jpg
Image20230524152834.jpg
Attachment 4: Image20230524200038.jpg
Image20230524200038.jpg
Attachment 5: Image20230524200029.jpg
Image20230524200029.jpg
Attachment 6: Image20230524200033.jpg
Image20230524200033.jpg
  308   25 May 2023, 16:34 Sascha MenzelXHEXPInformationMetallschrank umgestellt

Einen Metallschrank von der Vacuum Gruppe umgestellt.

Attachment 1: Image20230525163435.jpg
Image20230525163435.jpg
  313   30 May 2023, 14:35 Sascha MenzelXHEXPInformationTransport zum XHE1

Für SCS einen #56300 Metallschrank auf Rollen und einen #46867Rollwagen aus der Halle zum XHE1 transportiert und dort eingelagert.

Coworkers: O.Bilani, S.Menzel 

  314   31 May 2023, 20:35 Sascha MenzelXHEXPInformationSCS Support

In der SCS Hutch 2 Rohrleitungen siehe Bild 1 mit dem Danish Sience Design und der Kammer im Reinraum miteinander verbunden.

Coworkers: S.Menzel, B.Hübner, A.Reich

Attachment 1: Image20230511170625.jpg
Image20230511170625.jpg
Attachment 2: Image20230531203508.jpg
Image20230531203508.jpg
Attachment 3: Image20230531203512.jpg
Image20230531203512.jpg
Attachment 4: Image20230531203515.jpg
Image20230531203515.jpg
Attachment 5: Image20230531203517.jpg
Image20230531203517.jpg
Attachment 6: Image20230531203520.jpg
Image20230531203520.jpg
  315   01 Jun 2023, 14:38 Sascha MenzelXHEXPInformationMID Support

Einen Aludeckel zur Passprobe an eine Kammer mit dem Hallenkran anschließend an den Deckel einen Flansch zur Probe angebaut und danach alles wieder zurückgebaut.

Coworkers: S.Menzel, G.Ansaldi

Attachment 1: Image20230601143742.jpg
Image20230601143742.jpg
Attachment 2: Image20230601143746.jpg
Image20230601143746.jpg
Attachment 3: Image20230601143748.jpg
Image20230601143748.jpg
Attachment 4: Image20230601143751.jpg
Image20230601143751.jpg
  318   06 Jun 2023, 20:52 Orkidia BilaniXHEXPInformationShift report

SPB/SFX:  gave to XHCrew (more or less sorted out) various screws and Gewindestifte (pic. 1). Sorted them out in boxes and placed in the cabinet (pic.2, pic.3).

SQS:        I gave back the Rollwagen (placed it by the door near the control hutch).

SCS:        Needs our support by next week. The plan "when will happen what and who is needed when" will be sent soon by Jan Torben.

TS:          The elevator near the LKW Schleuse seemed to have some real troubles. A Redmine Ticket already sent to TS bzw. Süleyman.

 

 

 

Attachment 1: IMG_20230606_155020_MP.jpg
IMG_20230606_155020_MP.jpg
Attachment 2: IMG_20230606_201948_MP.jpg
IMG_20230606_201948_MP.jpg
Attachment 3: IMG_20230606_201955_MP.jpg
IMG_20230606_201955_MP.jpg
  323   09 Jun 2023, 14:43 Orkidia BilaniXHEXPInformationVorgeschichte des Aufuzgs: Hatte doch Störung

The S. Arslan answer of the Redmine Ticket  concerning the elevator (see pic below). And today the elevator was again out of order, see the previous entry frpm S. Menzel.

 

Attachment 1: Elevator_Redmine_7-8Juni2023.png
Elevator_Redmine_7-8Juni2023.png
  324   09 Jun 2023, 18:52 Orkidia BilaniXHEXPProblemElevator in TH2

The elevator in TH2 is again <Out of Order>.  The door doesn't close and it got stuck in U3.

S.Arslan (in cc.L.Kersting) were informed via email.

Still called S.Arslan to notify the staff via email, as well as to talk to the "Lutzaufzüge" technicians. Süleyman called back, a technician from "Lutz" will possibly come (until now not yet here).

 

 

  325   09 Jun 2023, 19:02 Orkidia BilaniXHEXPInformationXHCrew Storage

In the consumables' storage found this box with various M3 screws.

No idea from whom, anyway a "thank you" for the anonymous donator :-)

Attachment 1: IMG_20230609_154557_MP.jpg
IMG_20230609_154557_MP.jpg
  326   09 Jun 2023, 19:04 Orkidia BilaniXHEXPProblemWeiss Klimatechnik: SASE 1

@SASE1  an mehreren Weiss Klimatechnik : die Verkleidung der Rohre löst sich (siehe Bilder)

Redmine Ticket sent to D. Tscherwitschka and A. Kondraschew

Attachment 1: IMG_20230609_180232_MP.jpg
IMG_20230609_180232_MP.jpg
Attachment 2: IMG_20230609_180343_MP.jpg
IMG_20230609_180343_MP.jpg
Attachment 3: IMG_20230609_180614_MP.jpg
IMG_20230609_180614_MP.jpg
  327   09 Jun 2023, 19:27 Orkidia BilaniXHEXPInformationElevator TH2

The elevator is functional again.

Talked to the technician from "Lutzaufzüge" and he said that he fixed the bug caused by "short waiting times" during transportations. He set a longer time now.

  330   14 Jun 2023, 20:25 Sascha MenzelXHEXPInformationSCS Support

Am 13.06 SCS bei der Demontage der pipes und beim kranen auf Paletten unterstüzt.

Heute wurde das große blaue Gestell zum Transport zum XHE1 am 19.06 vorbereitet, dafür ein kleines vom großen getrennt, auf Paletten gekrant und mit Gurten verzurrt.

Attachment 1: Image20230614202439.jpg
Image20230614202439.jpg
Attachment 2: Image20230614202436.jpg
Image20230614202436.jpg
Attachment 3: Image20230614202441.jpg
Image20230614202441.jpg
Attachment 4: Image20230614202443.jpg
Image20230614202443.jpg
Attachment 5: Image20230614202446.jpg
Image20230614202446.jpg
  331   14 Jun 2023, 20:34 Sascha MenzelXHEXPInformationPlatte angefertigt

Für die Tür von unserem Lager eine Platte im XHWS angefertigt und an die Tür angebracht.

Attachment 1: Image20230614202449.jpg
Image20230614202449.jpg
Attachment 2: Image20230614202453.jpg
Image20230614202453.jpg
  332   14 Jun 2023, 20:39 Sascha MenzelXHEXPInformationSCS Support

An einer pipe von SCS einen Kunststoffflansch an den bellow angebracht und mit drei Gewindestangen fixiert.

Attachment 1: Image20230614202455.jpg
Image20230614202455.jpg
Attachment 2: Image20230614202457.jpg
Image20230614202457.jpg
  334   15 Jun 2023, 18:59 Sascha MenzelXHEXPInformationGittertür vom XHCrew Lager mit einem Knauf versehen

An der Gittertür vom XHCrew Lager die Drückeramatur demontiert, zwei Löcher in die Tür gebohrt und Gewinde geschnitten. Vierkannteisen gekürzt und einen Knauf an die Außentür montiert.

Attachment 1: Image20230615185738.jpg
Image20230615185738.jpg
Attachment 2: Image20230615185741.jpg
Image20230615185741.jpg
Attachment 3: Image20230615185745.jpg
Image20230615185745.jpg
  335   15 Jun 2023, 19:06 Sascha MenzelXHEXPInformationMesspunkte überklebt

Dieverse Messpunkte am Boden in der Halle mit Klebeband überklebt.

Attachment 1: Image20230615185747.jpg
Image20230615185747.jpg
  341   28 Jun 2023, 10:22 Sascha MenzelXHEXPInformationSQS Support

Für SQS eine Verstelleinheit aus einer Kammer mit den Hallenkran heraus gekrant und für den transport in die SQS Hutch auf einen Wagen gelegt.

Coworkers: S.Menzel, A.De Fanis

Attachment 1: Image20230628102227.jpg
Image20230628102227.jpg
  342   30 Jun 2023, 13:01 Sascha MenzelXHEXPProblemLeckage Sase2

AM 27.06 beim Kontrollgang eine Leckage an einer Leitung vom Verdampfer über Sase2 an TS A.Kondraschew gemeldet. Weiss Klimatechnik kommt zur Wartung und wird die Undichtigkeit beheben.

Attachment 1: Image20230630130315.jpg
Image20230630130315.jpg
  344   30 Jun 2023, 13:07 Sascha MenzelXHEXPInformationGittertür XHCrew Lager

29.06 - Eine größere Alu Platte angefertigt und an die Gittertür vom XHCrew Lager angebracht, eine weitere an die andere Seite montiert.

Attachment 1: Image20230630130311.jpg