SQS Support, posted by Sascha Menzel on 04 May 2023, 14:45 
|
Für SQS ein Bauteil mit den Hallenkran angehoben, es wurde eine Dichtung ersetzt, anschließend das Bauteil wieder abgelassen. |
Schichtübergabe: 13.05 - 14.05.2023, posted by Orkidia Bilani on 14 May 2023, 07:17 7x
|
► The warning acoustic signal was activated (the Klimaanlage, X.TL_XHEXP1_D02 at the end of SA1, roof). Muted it, not a problem, still TS informed since O. Engelmann was onsite (see pic).
► FXE: For Monday, 15.05, the dewars # 25581 and # 25085 to be refilled. Contact M.Knoll or P. Frankenberger for the time to pick it up (since they do not have Zugang to the LKW Schleuse). They will need only one, ask which exactly they need.
► Brought the Wasserbehälter and a a pallet with Kabeln into the LKW Schleuse, which were at XTD8 and belonged to TS (see pic).
► Removed from the hall and disposed a useless pallet which was located in front of the Pulserraum (see pic).
► Thomas Baumann gave me a box with consumables/screws (see pic).
► Sorted out almost all the "Gewindestifte" and labeled them.
► Sorted out a lot of nuts and washers (Sascha please name them, I don't know their names :-)) see pic.
|
IT Support, posted by Sascha Menzel on 15 May 2023, 14:25
|
Für Firma IBM 6 Paletten mit Server und Festplatten auf den Balkon zum Serverraum mit dem Gabelstapler gehoben. |
Day and Evening Report, posted by Orkidia Bilani on 23 May 2023, 21:41    
|
► SQS: The chiller at SQS is running very hot, currently at 21:35 is by 36.3°C. A ventilator is nonstop trying to "cool down". No one from SQS now present (see pics 1 and 2)
► SCS: L.Adriano wants to bring a Werkzeugschrank and a Rollwagen (inkl. the box with liquid gases and accessories/supplies) into the shaft building. Transport on Tuesday at around 13:00. He also mentioned that he has 1-2 cabinets, to give us, but needs to check first where they are
(see pic 3)
► MID: They will dismount the clean tent located near their hutch (close to the yellow beam pipes). Sascha will support with craning on 24.05.2023 at ca. 13:00. Also they will remove/dispose non usable things from the hall. (see pics 4 and 5)
► ITDM: The waste of the IBM computers u.ä. was disposed.
► Consumables: The grey box is completely finished, :-) . Sascha please name them (I placed already the yellow sticky note to the drawer nr.4). Sorting out is almost at the end.
|
MID Support, posted by Sascha Menzel on 24 May 2023, 20:01 6x
|
Der Reinraum von MID ist demontiert worden und benötigte dabei Unterstützung von XHCrew. Die Filtereinheiten mit dem Hallenkran vom Reinraumdach auf Paletten gekrant, danach den ganzen Reinraum mit dem Hallenkran angehoben und die Beine/Füße demontiert. Die Dacheinheit abgelassen und den Rest demontiert. Diverse Profile und Lamellen auf Paletten gelegt. Die Paletten wurden in die Lkw-Schleuse transportiert und werden von der Desy Transportgruppe am 25.05 abgeholt.
Coworkers: S.Menzel, A.Bartmann, 4 Personen von Desy |
Metallschrank umgestellt, posted by Sascha Menzel on 25 May 2023, 16:34
|
Einen Metallschrank von der Vacuum Gruppe umgestellt. |
Transport zum XHE1, posted by Sascha Menzel on 30 May 2023, 14:35
|
Für SCS einen #56300 Metallschrank auf Rollen und einen #46867Rollwagen aus der Halle zum XHE1 transportiert und dort eingelagert.
Coworkers: O.Bilani, S.Menzel |
SCS Support, posted by Sascha Menzel on 31 May 2023, 20:35 6x
|
In der SCS Hutch 2 Rohrleitungen siehe Bild 1 mit dem Danish Sience Design und der Kammer im Reinraum miteinander verbunden.
Coworkers: S.Menzel, B.Hübner, A.Reich |
MID Support, posted by Sascha Menzel on 01 Jun 2023, 14:38   
|
Einen Aludeckel zur Passprobe an eine Kammer mit dem Hallenkran anschließend an den Deckel einen Flansch zur Probe angebaut und danach alles wieder zurückgebaut.
Coworkers: S.Menzel, G.Ansaldi |
Shift report, posted by Orkidia Bilani on 06 Jun 2023, 20:52  
|
► SPB/SFX: gave to XHCrew (more or less sorted out) various screws and Gewindestifte (pic. 1). Sorted them out in boxes and placed in the cabinet (pic.2, pic.3).
► SQS: I gave back the Rollwagen (placed it by the door near the control hutch).
► SCS: Needs our support by next week. The plan "when will happen what and who is needed when" will be sent soon by Jan Torben.
► TS: The elevator near the LKW Schleuse seemed to have some real troubles. A Redmine Ticket already sent to TS bzw. Süleyman.
|
Vorgeschichte des Aufuzgs: Hatte doch Störung, posted by Orkidia Bilani on 09 Jun 2023, 14:43
|
The S. Arslan answer of the Redmine Ticket concerning the elevator (see pic below). And today the elevator was again out of order, see the previous entry frpm S. Menzel.
|
Elevator in TH2, posted by Orkidia Bilani on 09 Jun 2023, 18:52
|
The elevator in TH2 is again <Out of Order>. The door doesn't close and it got stuck in U3.
S.Arslan (in cc.L.Kersting) were informed via email.
Still called S.Arslan to notify the staff via email, as well as to talk to the "Lutzaufzüge" technicians. Süleyman called back, a technician from "Lutz" will possibly come (until now not yet here).
|
XHCrew Storage, posted by Orkidia Bilani on 09 Jun 2023, 19:02
|
► In the consumables' storage found this box with various M3 screws.
► No idea from whom, anyway a "thank you" for the anonymous donator :-) |
Weiss Klimatechnik: SASE 1, posted by Orkidia Bilani on 09 Jun 2023, 19:04  
|
► @SASE1 an mehreren Weiss Klimatechnik : die Verkleidung der Rohre löst sich (siehe Bilder)
► Redmine Ticket sent to D. Tscherwitschka and A. Kondraschew |
Elevator TH2, posted by Orkidia Bilani on 09 Jun 2023, 19:27
|
► The elevator is functional again.
► Talked to the technician from "Lutzaufzüge" and he said that he fixed the bug caused by "short waiting times" during transportations. He set a longer time now. |
SCS Support, posted by Sascha Menzel on 14 Jun 2023, 20:25    
|
Am 13.06 SCS bei der Demontage der pipes und beim kranen auf Paletten unterstüzt.
Heute wurde das große blaue Gestell zum Transport zum XHE1 am 19.06 vorbereitet, dafür ein kleines vom großen getrennt, auf Paletten gekrant und mit Gurten verzurrt. |
Platte angefertigt, posted by Sascha Menzel on 14 Jun 2023, 20:34 
|
Für die Tür von unserem Lager eine Platte im XHWS angefertigt und an die Tür angebracht. |
SCS Support, posted by Sascha Menzel on 14 Jun 2023, 20:39 
|
An einer pipe von SCS einen Kunststoffflansch an den bellow angebracht und mit drei Gewindestangen fixiert. |
Gittertür vom XHCrew Lager mit einem Knauf versehen, posted by Sascha Menzel on 15 Jun 2023, 18:59  
|
An der Gittertür vom XHCrew Lager die Drückeramatur demontiert, zwei Löcher in die Tür gebohrt und Gewinde geschnitten. Vierkannteisen gekürzt und einen Knauf an die Außentür montiert. |
Messpunkte überklebt, posted by Sascha Menzel on 15 Jun 2023, 19:06
|
Dieverse Messpunkte am Boden in der Halle mit Klebeband überklebt. |