Group Selection Page HELP Controls Group Data Analysis Group ITDM WP76 DET Vacuum EEE WP78 WP74 FXE SCS SPB MID HED SQS SXP Sample Environment Operation PSPO XO TS Migrated2Zulip
XHCrew
  XHCrew logbook, Page 7 of 59  Not logged in ELOG logo
New entries since:Thu Jan 1 01:00:00 1970
Entry   Pulserraum: HiBEF, posted by Orkidia Bilani on 28 Nov 2022, 11:38 

C.Bähtz needs a temporary space in the hall, to place the materials (5 palltes and a 4m long frame) which be used during the buildiing up of the Pulserraum.

Delivery expected latest in January 2023.

Since no space is given without making space, he together with J.Hauser will sort out and remove from the hall parts and materials which are no longer needed there. :-)

 

 

Entry   TS, posted by Orkidia Bilani on 29 Nov 2022, 08:06 

TS (A.Kondraschew, D. Tscherwitschka) contacted for temporarily space in the hall.

They need to place the materials which will be used during the maintanance period. Currently these are located near and under the stairs of the XHVrew Hutch.

Entry   SCS Installation for Cleantent 22_11_29, posted by Michael Luedeke on 29 Nov 2022, 15:09 IMG_20221129_115237.jpgIMG_20221129_115244.jpgIMG_20221129_140907.jpgIMG_20221129_143636.jpgIMG_20221129_142735.jpg
 
Entry   SCS Cleantent Day 2 22-11-30, posted by Michael Luedeke on 30 Nov 2022, 14:49 IMG_20221130_134006.jpgIMG_20221130_134523.jpgIMG_20221130_134529.jpgIMG_20221130_134600.jpg
 
Entry   SCS clean tent installation 6.12.2022, posted by Michael Luedeke on 07 Dec 2022, 08:15 8x

Installation C-Profile

Moving Chamber 1

Moving Chamber 2

Material preparation

Entry   XHCrew Hutch, posted by Orkidia Bilani on 07 Dec 2022, 11:07 Lights_xhcrew_hutch.jpg

Under the XHallCrew office  lights have been installed and are functional.

Entry   HiBEF, posted by Orkidia Bilani on 07 Dec 2022, 11:09 

HiBEF colleauges (mainly J.Hauser) are cleaning up the spaces from the materials which no longer are needed in the hall.

They are preparing a 1-2 pallets with waste.

Many components will be stored in the shaft building XHE1 (will support them  wth Redmine Ticket and QR codes).

Meanwhile the "Montagehilfe für Cryofan" QR 47620 has been used and can be brought back to XHE1.

 

Entry   SCS: Transport (XHE1, XHEXP1), posted by Orkidia Bilani on 07 Dec 2022, 11:16 

Until the end of the year SCS needs back from XHE1 to XHEXP1 the components (QR 44265, QR 49608, QR 49609 and QR 49620).

Further, other components will be stored in the XHE1. Details will follow by next week.

 

Entry   SQS, posted by Orkidia Bilani on 07 Dec 2022, 14:07 

Together with T.Mazza checked the COMO source, which is located in XHE1.

This will be brought back in January in XHEXP1, details will follow in due time.

 

 

Entry   SCS clean tent 7.12.2022, posted by Michael Luedeke on 08 Dec 2022, 07:51 20221207_111414.jpg20221207_120127.jpg20221207_134755.jpg

Preparation top plate part 1 (drilling, cutting, mounting)

Entry   SCS Rack Room, posted by Orkidia Bilani on 08 Dec 2022, 08:32 

The door of the SCS Rack Room can't open, even when activation with the DACHS card shows a green light. It seems to be stucked.

S.Arslan informed via Redmine Ticket.

Entry   SCS Rack Room, posted by Orkidia Bilani on 08 Dec 2022, 13:12 

The door of the SCS rack room is functional again.

The cause of the SCS rack room door jamming was a piece of cardboard that was inserted into the door latch opening by a person. That has been removed and the door is working again.

Entry   SCS clean tent installation 8.12.2022, posted by Michael Luedeke on 09 Dec 2022, 07:55 20221208_135111.jpg20221208_135102.jpg20221208_150916.jpg20221208_150854.jpg

The big aluminium plate is mounted

The frame of the clean tent is well moving

Some small tasks are missing and will be done next week

 

Entry   HiBEF: Waste, posted by Orkidia Bilani on 09 Dec 2022, 09:44 HiBEF_Waste.jpg

A pallet with waste from HiBEF was removed from the hall and disposed.

 

 

Entry   HiBEF Rack , posted by Orkidia Bilani on 09 Dec 2022, 09:46 Rack_.jpg

A rack to give away from HiBEF has found a new owner , the SQS (N.Rennhack).

 

 

Entry   SQS, posted by Orkidia Bilani on 09 Dec 2022, 11:54 SQS_ThermalG_c.jpgSQS_ThermalG_a.jpg

Contacted SQS (N.Rennhack) and suggested solution  for three chemical kanisters "Thermal G for Julabo" located at the entrance of their hutch.

They have been removed from there, and are now located in the chemicals' storage.

Coworkers: V. Bazhenov, O. Bilani

 

Entry   HiBEF: Bellows and pipes to give away, posted by Orkidia Bilani on 09 Dec 2022, 13:32 Bellows_and_Pipes.jpg

HiBEF had a Gitterbox with various bellows and pipes to give away.

SQS is now the new owner. :-) Are now stored in SQS labs in the E floor.

Entry   Transport XHE1->XHEXP1, posted by Sascha Menzel on 13 Dec 2022, 16:49 8x

HiBEF Parts QR50374, QR50375, QR50373 und QR50372 zum XHE1 transportiert und eingelagert.

Vom XHE1 SCS Parts QR44265, QR49608, QR49609 und QR49620 zur XHEXP1 transportiert und in die SCS Assembly Area gestellt.

 

Coworkers: S.Menzel, M.Lüdeke, H.Heuer

Entry   Craning for SXP, posted by Orkidia Bilani on 14 Dec 2022, 07:27 

V. Vardanyan asked for the XHCrew support in craning in the SXP experiment hutch. Will meet him on 15.12 for further details.

Entry   Kranen und Transport zum XHE1, posted by Sascha Menzel on 14 Dec 2022, 14:30 6x

SCS Parts in der Hutch auf Paletten und Gitterbox gekrant, verzurrt und für den Transport zum XHE1 in die LKW Schleuse gebracht. SCS Parts und Palette von SPB/SFX nach Osdorf XHE1 transportiert.

Die Palette von SPB/SFX mit Hilfe von S.Arslan im XHE1 vom Anhänger gekrant.

SCS, SPB/SFX Parts eingelagert.

 

Coworkers: S.Menzel, M.Lüdeke, O.Bilani, S.Arslan

 

ELOG V3.1.4-7c3fd00