Group Selection Page HELP Controls Group Data Analysis Group ITDM WP76 DET Vacuum EEE WP78 WP74 FXE SCS SPB MID HED SQS SXP Sample Environment Operation PSPO XO TS Migrated2Zulip
XHCrew
  XHCrew logbook, Page 58 of 59  Not logged in ELOG logo
Entry   Regal fuer die Hall Crew Huette fertig gestellt, posted by Sascha Menzel on 28 Sep 2022, 18:48 IMG_6908.jpg

Rückwand vom Regal für die Hall Crew Hütte befestiegt und das Regal in der Hütte aufgestellt..

 

Coworkers: S.Menzel, M.Lüdeke

Entry   SQS: Support, posted by Orkidia Bilani on 28 Sep 2022, 13:44 

Yevheniy sent a ticket to XO Transport, as following:

"Hi   Hall Crew, 
We would like to transport from experimental hall to XHE1 the following
components:

-> Cluster source  with QR44455 
-> The DSSC components: QR 47932,  QR 47938, QR48494, QR48493

-> The big CF300 VAT valve for the DSSC experiments with QR44459

-> The pnCCD rack with QR5802 "

 

He was supported with the Ticket, QR and the XIM.

The transport will be carried out next week.

(A big laser table can also be stored to XHE1. T.Mullins will let know by latest end of the week.)

Coworkers: Y. Ovcharenko, O. Bilani

 

Entry   FXE Support, posted by Orkidia Bilani on 27 Sep 2022, 20:15 

FXE (P.Frankenberger, M.Knoll)  needs our support on craning Kappa Goniometer (ca.180kg) and attaching it into the beamline. Since the space is quite limited, one would need a special crane (the manual one that HiBEF has left to HallCrew to be used by all instruments when needed, which unfortunately, due to a leak problem, is out of service; the talk between S.Arslan and T. Toncian is still pending).

The support is needed on 10.10.2022, where only M.Lüdeke is available from Hall Crew and maybe P.Zalden from FXE (all the rest are on vacation).

We will discuss on Tuesday, 4.10., with S. Arslan to find a solution on time.

 

Entry   SQS: Transport to XHE1, posted by Orkidia Bilani on 27 Sep 2022, 17:32 

SQS asks for support to transport from Experimental Hall to XHE1 the following components:

-> Cluster source  with QR44455
-> The DSSC components: QR 47932,  QR 47938

Yevheniy will clairify, if  the racks with QR 47938 and  QR47932 (part of DSSC), have to be transported to XHE1 or not.

Coworkers: O.Bilani, Y. Ovcharenko

Entry   2 Dewars gefuellt, posted by Sascha Menzel on 27 Sep 2022, 16:46 

Am 26.09.2022 um 09:00 Uhr -> (TS Peter Schmidt bat um Unterstützung) 2 Dewars mit Flüssigstickstoff für Vasilii gefüllt.

 

Coworkers: S.Menzel 

Entry   Regal für Hall Crew Huette angepasst, posted by Sascha Menzel on 27 Sep 2022, 16:37 IMG_6906.jpg

Ein Holzregal was in die Hall Crew Hütte soll, mittels einer Stichsäge ausgesägt damit es wegen dem Kabelkanal ganz an die Wand passt.

 

Coworkers: S.Menzel, M.Lüdeke

Entry   Aluminiumplatten für das SQS Regal montiert, posted by Sascha Menzel on 27 Sep 2022, 16:33 IMG_6905.jpg

Aluminiumplatten an das R+K Regal für SQS montiert.

 

Coworkers: S.Menzel, M.Lüdeke

Entry   SQS Support, posted by Sascha Menzel on 26 Sep 2022, 15:23 

Granitsteine (wo der 1D XUV spectrometer drauf steht) mittels Hutch-Kran versetzt.

Coworkers: Th.Baumann, O.Bilani, M.Lüdeke, S.Menzel

Entry   SQS Support, posted by Orkidia Bilani on 22 Sep 2022, 19:44 sqs_22Sept2022_a.jpgsqs_22Sept2022_b.jpgsqs_22Sept2022_c.jpgsqs_22Sept2022_d.jpgsqs_22Sept2022_.jpg

SQS support:

-> Completed the building up of the vacuum pump and mounted it in the beamline (pic.a and b).

-> Craned and mounted (attached) the 1D XUV spectrometer (from Uppsala) into the beamline (pic.c and d).

 

Coworkers: O,Bilani, Th. Baumann, J. Montano

 

Entry   Hall Crew Techniker Fortbildung Fraesen , posted by Sascha Menzel on 22 Sep 2022, 17:14 11x

Vom 19.09.2022 bis 23.09.2022

Hall Crew Techniker zur Fortbildung (Fräsen) beim bfw (Berufsfortbildungswerk) siehe Bilder und Video.

Coworkers: S.Menzel, M.Lüdeke

Entry   SQS support, posted by Orkidia Bilani on 21 Sep 2022, 15:47 sqs_21Sept2022.jpg

SQS supported on building up and preparing for mounting the vacuum pump (see pic below).

Work on going...

Coworkers: O,Bilani, J. Montano

Entry   Gas cabinets: TüV, posted by Orkidia Bilani on 20 Sep 2022, 14:52 

Tobias Bartsch wird bis ende nächste Woche die Gasschränke in SA1 and SA3 prüfen (die TüVs sind fällig).

Entry   SQS support, posted by Orkidia Bilani on 19 Sep 2022, 15:26 sqs_19Sept2022.jpg

Support of the SQS with:

- dismounting of coils in the big coils' frame

- Tischfuss: brought into the workshop (M. Schrage)  two times  (gefräst 0.2mm and then again 0.1mm more)

- AQS chamber, dismounted, craned and mounted/attached  to another chamber

- Tomorrow more...

 

Coworkers: T. Baumann, J. Montano, A. de Fanis, O. Bilani

Entry   Transport zum XHE1, posted by Sascha Menzel on 16 Sep 2022, 17:41 IMG_6861.jpg

13:00 -> Die für den Transport vorbereitete Box mit HED Part aus der LKW Scheuse zum XHE1 gebracht und eingelagert.

Coworkers: S.Menzel, M.Lüdeke

Entry   SCS bei Vacuum Problem unterstuezt, posted by Sascha Menzel on 16 Sep 2022, 15:50 

SCS bat um Unterstüzung beim beheben einer defekten Vacuum-Leitung. Der Anschluß war defekt (Leitung abgerissen), die Hall Crew hat einen neuen Anschluß aus dem Vacuum-Lab. besorgt und die Leitung instand gesetzt und wieder angeschlossen.

Mitarbeiter: S.Menzel, M.Lüdeke, J.T.Delitz

Entry   Messpunkte am Hallenboden überklebt., posted by Sascha Menzel on 16 Sep 2022, 11:27 IMG_6860.jpg

Die Messpunkte am Hallenboden dür den Transport von Kammern mit Luftkissen (Newport) gereinigt und neu überklebt.

Coworkers: M.Lüdeke, S.Menzel

Entry   Bei MID Area Platz fuer Vaccum geschaffen, posted by Sascha Menzel on 16 Sep 2022, 11:13 IMG_6856.jpgIMG_6858.jpg

Nach Absprache von Orkidia Bilani mit Andreas Schmidt, wurde Platz für die neuen Stellplätze der Pumpen (Vacuum) durch aufrücken geschaffen.

Coworkers: O.Bilani, M.Lüdeke, S.Menzel

Entry   HED big flange in XHEXP1, posted by Orkidia Bilani on 15 Sep 2022, 15:42 

10:30 -> Discussion between Andreas Schmidt und O.Bilani about a box containing a flange from HED (long term storage).

             Decided to store it in XHE1 (QR:44463 )

            The Hall Crew will take care about the transport into XHE1 (for the current status, see entry of S.Menzel)

Entry   Pallet of the "MID AGIPD Stainless Steel Cover" , posted by Orkidia Bilani on 15 Sep 2022, 15:35 MID.jpg

12:45 -> Meeting Gabriele Ansaldi and O.Bilani about the pallet containing "MID AGIPD Stainless Steel Cover" (QR: 37702) located in the XHEXP1.

            Together we decided to bring it in the Warehouse (short term storage) and O.Bilani will provide Gabriele the updated status.

            Already brought by Hall Crew in the Warhouse and Stefan Quast updated it in XIM.

Entry   Transport zum XHE1 vorbereitet (MID), posted by Sascha Menzel on 15 Sep 2022, 14:43 IMG_6852.jpgIMG_6850.jpg

Einen Flansch von MID in einer Kunstoffbox verpackt, mit QR:44463 versehen und für den Transport am 16.09.2022 zum XHE1 in die LKW Schleuse gestellt.

Coworkers: S.Menzel, M.Lüdeke 

ELOG V3.1.4-7c3fd00