Dewar gefüllt, posted by Sascha Menzel on 28 Feb 2025, 20:00
|
Zwei Dewar für Vacuum gefüllt. |
Dewar gefüllt, posted by Sascha Menzel on 07 Mar 2025, 12:52
|
2 Dewar für Vacuum gefüllt. |
Dewar gefüllt, posted by Sascha Menzel on 21 Mar 2025, 13:26
|
2 Dewar für Vacuum gefüllt. |
Dewar gefüllt, posted by Sascha Menzel on 02 Apr 2025, 19:43
|
2 LN2 Dewar vom XHE2 mit dem Gabelstapler abgeholt, die Dewar für Lewis Batchelor gefüllt und zurück zum XHE2 transportiert. |
Dewar gefüllt, posted by Sascha Menzel on 04 Apr 2025, 20:49
|
Zwei LN2 Dewar für Vacuum gefüllt. |
Dewar gefüllt, posted by Sascha Menzel on 07 Apr 2025, 17:23
|
Zwei LN2 Dewar #25583 & #25088 für SXP gefüllt |
Dewar gefüllt, posted by Sascha Menzel on 14 Apr 2025, 10:39
|
Einen LN2 Dewar für SXP aufgefüllt. |
Dewar for Luigi Adriano, posted by Frank Siyli on 27 Feb 2024, 11:12
|
Filled the dewar QR25087. |
Dewar befüllt, posted by Benjamin Wolf on 30 Mar 2025, 16:34
|
Einen Dewar für SEC befüllt |
Dewar Transport, posted by Sascha Menzel on 15 Jun 2023, 18:58
|
Einen kleinen Dewar vom XHE2 zum Außengitter transportiert.
|
Dewar, posted by Benjamin Wolf on 04 Dec 2024, 12:47
|
Dewar#25579 für J.Moore gefüllt. |
Desy Support Reinraumzelt, posted by Kai-Erik Pfeiffer on 03 Mar 2025, 14:16
|
Das Reinraumzelt mit den Leuten von Desy zerlegt, damit es später abtransportiert werden kann.
Coworkers: B. Wolf, K. Pfeiffer |
Day and Evening Report, posted by Orkidia Bilani on 23 May 2023, 21:41    
|
► SQS:
The chiller at SQS is running very hot, currently at 21:35 is by 36.3°C. A ventilator is nonstop trying to "cool down". No one from SQS now
present (see pics 1 and 2) |
Damaged concrete floor in SASE3 and SASE2, posted by Orkidia Bilani on 05 Mar 2024, 14:42
|
The damages of the concrete floor in SCS area and SASE3 in general, as well as the damages in SASE2 under the truck bay were discussed with K. Löptien.
The repair from the care takers will start very soon.
|
DET Support, posted by Sascha Menzel on 18 Feb 2025, 15:37
|
Amgad Nasr bat um Support beim kranen von drei Holzboxen in der Technikzentrale 3.
Coworkers: K.Pfeiffer, S.Menzel |
DET Support, posted by Sascha Menzel on 02 Apr 2025, 19:39
|
Den Detektor DSSC2 auf das Supportgestell gekrant und befestigt.
Coworkers: A.Reich, DET Gruppe, K.Pfeiffer, S.Menzel |
Craning for SXP, posted by Orkidia Bilani on 14 Dec 2022, 07:27
|
V. Vardanyan asked for the XHCrew support in craning in the SXP experiment hutch. Will meet him on 15.12 for further details. |
Consumables' storage , posted by Orkidia Bilani on 26 Apr 2024, 16:19 
|
The four pallets with consumables, which O.Smith gave, have been all placed ordered in the cabinets of XHCrew consumables' storage.
Brought the empty pallets and boxes back to the warehouse.
|
Consumables' Storage, posted by Orkidia Bilani on 20 Apr 2023, 20:03
|
Only a few screws are left over to sort out.
Next steps would than be: nuts, waschers, Gewindestifte and vacuum parts.
:-) |
Consumables Storage XO, posted by Paul Schoenborn on 25 Sep 2024, 20:35
|
Sorted the screws, nuts, studs and washers that were donated to us into the Screwcabinet aswell as the Special Wishes Cabinet. |