ID |
Date |
Author |
Location |
Severity |
Subject |
114
|
09 Dec 2022, 13:32 |
Orkidia Bilani | XHEXP | Information | HiBEF: Bellows and pipes to give away |
HiBEF had a Gitterbox with various bellows and pipes to give away.
SQS is now the new owner. :-) Are now stored in SQS labs in the E floor. |
Attachment 1: Bellows_and_Pipes.jpg
|
|
113
|
09 Dec 2022, 11:54 |
Orkidia Bilani | XHEXP | Information | SQS |
Contacted SQS (N.Rennhack) and suggested solution for three chemical kanisters "Thermal G for Julabo" located at the entrance of their hutch.
They have been removed from there, and are now located in the chemicals' storage.
Coworkers: V. Bazhenov, O. Bilani
|
Attachment 1: SQS_ThermalG_c.jpg
|
|
Attachment 2: SQS_ThermalG_a.jpg
|
|
112
|
09 Dec 2022, 09:46 |
Orkidia Bilani | XHEXP | Information | HiBEF Rack |
A rack to give away from HiBEF has found a new owner , the SQS (N.Rennhack).
|
Attachment 1: Rack_.jpg
|
|
111
|
09 Dec 2022, 09:44 |
Orkidia Bilani | XHEXP | Information | HiBEF: Waste |
A pallet with waste from HiBEF was removed from the hall and disposed.
|
Attachment 1: HiBEF_Waste.jpg
|
|
110
|
09 Dec 2022, 07:55 |
Michael Luedeke | General | Information | SCS clean tent installation 8.12.2022 |
The big aluminium plate is mounted
The frame of the clean tent is well moving
Some small tasks are missing and will be done next week
|
Attachment 1: 20221208_135111.jpg
|
|
Attachment 2: 20221208_135102.jpg
|
|
Attachment 3: 20221208_150916.jpg
|
|
Attachment 4: 20221208_150854.jpg
|
|
109
|
08 Dec 2022, 13:12 |
Orkidia Bilani | XHEXP | Information | SCS Rack Room |
The door of the SCS rack room is functional again.
The cause of the SCS rack room door jamming was a piece of cardboard that was inserted into the door latch opening by a person. That has been removed and the door is working again. |
108
|
08 Dec 2022, 08:32 |
Orkidia Bilani | XHEXP | Information | SCS Rack Room |
The door of the SCS Rack Room can't open, even when activation with the DACHS card shows a green light. It seems to be stucked.
S.Arslan informed via Redmine Ticket. |
107
|
08 Dec 2022, 07:51 |
Michael Luedeke | General | Information | SCS clean tent 7.12.2022 |
Preparation top plate part 1 (drilling, cutting, mounting) |
Attachment 1: 20221207_111414.jpg
|
|
Attachment 2: 20221207_120127.jpg
|
|
Attachment 3: 20221207_134755.jpg
|
|
106
|
07 Dec 2022, 14:07 |
Orkidia Bilani | XHEXP | Information | SQS |
Together with T.Mazza checked the COMO source, which is located in XHE1.
This will be brought back in January in XHEXP1, details will follow in due time.
|
105
|
07 Dec 2022, 11:16 |
Orkidia Bilani | XHEXP | Information | SCS: Transport (XHE1, XHEXP1) |
Until the end of the year SCS needs back from XHE1 to XHEXP1 the components (QR 44265, QR 49608, QR 49609 and QR 49620).
Further, other components will be stored in the XHE1. Details will follow by next week.
|
104
|
07 Dec 2022, 11:09 |
Orkidia Bilani | XHEXP | Information | HiBEF |
HiBEF colleauges (mainly J.Hauser) are cleaning up the spaces from the materials which no longer are needed in the hall.
They are preparing a 1-2 pallets with waste.
Many components will be stored in the shaft building XHE1 (will support them wth Redmine Ticket and QR codes).
Meanwhile the "Montagehilfe für Cryofan" QR 47620 has been used and can be brought back to XHE1.
|
103
|
07 Dec 2022, 11:07 |
Orkidia Bilani | XHEXP | Information | XHCrew Hutch |
Under the XHallCrew office lights have been installed and are functional. |
Attachment 1: Lights_xhcrew_hutch.jpg
|
|
102
|
07 Dec 2022, 08:15 |
Michael Luedeke | General | Information | SCS clean tent installation 6.12.2022 |
Installation C-Profile
Moving Chamber 1
Moving Chamber 2
Material preparation |
Attachment 1: 20221206_113121.jpg
|
|
Attachment 2: 20221206_113133_01.jpg
|
|
Attachment 3: 20221206_113439.jpg
|
|
Attachment 4: 20221206_131938.jpg
|
|
Attachment 5: 20221206_150354.jpg
|
|
Attachment 6: 20221206_133226.jpg
|
|
Attachment 7: 20221206_134043.jpg
|
|
Attachment 8: 20221206_140010.jpg
|
|
101
|
30 Nov 2022, 14:49 |
Michael Luedeke | General | Information | SCS Cleantent Day 2 22-11-30 |
|
Attachment 1: IMG_20221130_134006.jpg
|
|
Attachment 2: IMG_20221130_134523.jpg
|
|
Attachment 3: IMG_20221130_134529.jpg
|
|
Attachment 4: IMG_20221130_134600.jpg
|
|
100
|
29 Nov 2022, 15:09 |
Michael Luedeke | General | Information | SCS Installation for Cleantent 22_11_29 |
|
Attachment 1: IMG_20221129_115237.jpg
|
|
Attachment 2: IMG_20221129_115244.jpg
|
|
Attachment 3: IMG_20221129_140907.jpg
|
|
Attachment 4: IMG_20221129_143636.jpg
|
|
Attachment 5: IMG_20221129_142735.jpg
|
|
99
|
29 Nov 2022, 08:06 |
Orkidia Bilani | XHEXP | Information | TS |
TS (A.Kondraschew, D. Tscherwitschka) contacted for temporarily space in the hall.
They need to place the materials which will be used during the maintanance period. Currently these are located near and under the stairs of the XHVrew Hutch. |
98
|
28 Nov 2022, 11:38 |
Orkidia Bilani | XHEXP | Information | Pulserraum: HiBEF |
C.Bähtz needs a temporary space in the hall, to place the materials (5 palltes and a 4m long frame) which be used during the buildiing up of the Pulserraum.
Delivery expected latest in January 2023.
Since no space is given without making space, he together with J.Hauser will sort out and remove from the hall parts and materials which are no longer needed there. :-)
|
97
|
24 Nov 2022, 10:38 |
Orkidia Bilani | XHEXP | Information | SCS Support |
A zoom discussion with A. Reich from SCS.
SCS needs the support of the XHCrew starting from monday afternoon next week, in craning in their hutch the plates for the cleanroom. Also in building up the clean room in their hutch, our support is asked.
Further detIails will be discussed on monday in person. |
96
|
18 Nov 2022, 10:40 |
Sascha Menzel | General | Information | Dewar gefüllt |
Da P.Schmidt (TS) heute nicht vor Ort ist hat die XHCrew für Vacuum zwei Dewar mit flüssigem Stickstoff gefüllt. |
95
|
17 Nov 2022, 17:21 |
Sascha Menzel | XHEXP | Information | SXP Support |
Am 15.11 hat S.Arslan in der SXP Hutch das Mikroskop auf dem frame mittels Kran angehoben und es für einen Strahlversuch angeschlagen gelassen. Heute 17.11 hat die XHCrew mittels Kran das Mikroskop wieder in vorherige Position gebracht und befestigt. Anschläge demontiert und verräumt.
Coworkers: S.Menzel, M.Lüdeke, V.Vardanyan |