Group Selection Page HELP DOC Controls Group Data Analysis Group ITDM WP76 DET Vacuum XRO EEE WP78 WP74 FXE SCS SPB MID HED SQS SXP Sample Environment Photon Commissioning Team Operation PSPO XO TS
XHCrew
  XHCrew logbook, Page 48 of 49  Not logged in ELOG logo
Entry   SQS Support, posted by Sascha Menzel on 26 Sep 2022, 15:23 
Granitsteine (wo der 1D XUV spectrometer drauf steht) mittels Hutch-Kran versetzt.

Coworkers: Th.Baumann, O.Bilani, M.Lüdeke, S.Menzel
Entry   SQS Support, posted by Orkidia Bilani on 22 Sep 2022, 19:44 sqs_22Sept2022_a.jpgsqs_22Sept2022_b.jpgsqs_22Sept2022_c.jpgsqs_22Sept2022_d.jpgsqs_22Sept2022_.jpg
SQS support:

-> Completed the building up of the vacuum pump and mounted it in the beamline (pic.a and b).

-> Craned and mounted (attached) the 1D XUV spectrometer (from Uppsala) into the beamline (pic.c and d).
Entry   Hall Crew Techniker Fortbildung Fraesen , posted by Sascha Menzel on 22 Sep 2022, 17:14 11x
Vom 19.09.2022 bis 23.09.2022

Hall Crew Techniker zur Fortbildung (Fräsen) beim bfw (Berufsfortbildungswerk) siehe Bilder und Video.

Coworkers: S.Menzel, M.Lüdeke
Entry   SQS support, posted by Orkidia Bilani on 21 Sep 2022, 15:47 sqs_21Sept2022.jpg
SQS supported on building up and preparing for mounting the vacuum pump (see pic below).

Work on going...

Coworkers: O,Bilani, J. Montano
Entry   Gas cabinets: TüV, posted by Orkidia Bilani on 20 Sep 2022, 14:52 
Tobias Bartsch wird bis ende nächste Woche die Gasschränke in SA1 and SA3 prüfen (die TüVs sind fällig).
Entry   SQS support, posted by Orkidia Bilani on 19 Sep 2022, 15:26 sqs_19Sept2022.jpg
Support of the SQS with:

- dismounting of coils in the big coils' frame

- Tischfuss: brought into the workshop (M. Schrage)  two times  (gefräst 0.2mm and then again 0.1mm more)
Entry   Transport zum XHE1, posted by Sascha Menzel on 16 Sep 2022, 17:41 IMG_6861.jpg
13:00 -> Die für den Transport vorbereitete Box mit HED Part aus der LKW Scheuse zum XHE1 gebracht und eingelagert.

Coworkers: S.Menzel, M.Lüdeke
Entry   SCS bei Vacuum Problem unterstuezt, posted by Sascha Menzel on 16 Sep 2022, 15:50 
SCS bat um Unterstüzung beim beheben einer defekten Vacuum-Leitung. Der Anschluß war defekt (Leitung abgerissen), die Hall Crew hat einen
neuen Anschluß aus dem Vacuum-Lab. besorgt und die Leitung instand gesetzt und wieder angeschlossen.

Mitarbeiter: S.Menzel, M.Lüdeke, J.T.Delitz
Entry   Messpunkte am Hallenboden überklebt., posted by Sascha Menzel on 16 Sep 2022, 11:27 IMG_6860.jpg
Die Messpunkte am Hallenboden dür den Transport von Kammern mit Luftkissen (Newport) gereinigt und neu überklebt.

Coworkers: M.Lüdeke, S.Menzel
Entry   Bei MID Area Platz fuer Vaccum geschaffen, posted by Sascha Menzel on 16 Sep 2022, 11:13 IMG_6856.jpgIMG_6858.jpg
Nach Absprache von Orkidia Bilani mit Andreas Schmidt, wurde Platz für die neuen Stellplätze der Pumpen (Vacuum) durch aufrücken geschaffen.

Coworkers: O.Bilani, M.Lüdeke, S.Menzel
Entry   HED big flange in XHEXP1, posted by Orkidia Bilani on 15 Sep 2022, 15:42 
10:30 -> Discussion between Andreas Schmidt und O.Bilani about a box containing a flange from HED (long term storage).

             Decided to store it in XHE1 (QR:44463 )

            The Hall Crew will take care about the transport into XHE1 (for the current
Entry   Pallet of the "MID AGIPD Stainless Steel Cover" , posted by Orkidia Bilani on 15 Sep 2022, 15:35 MID.jpg
12:45 -> Meeting Gabriele Ansaldi and O.Bilani about the pallet containing "MID AGIPD Stainless
Steel Cover" (QR: 37702) located in the XHEXP1.

            Together we decided to bring it in the Warehouse (short term storage) and
Entry   Transport zum XHE1 vorbereitet (MID), posted by Sascha Menzel on 15 Sep 2022, 14:43 IMG_6852.jpgIMG_6850.jpg
Einen Flansch von MID in einer Kunstoffbox verpackt, mit QR:44463 versehen und für den Transport am 16.09.2022 zum XHE1 in die LKW Schleuse gestellt.

Coworkers: S.Menzel, M.Lüdeke 
Entry   Transport von XHEXP1 zum Warehouse für MID, posted by Sascha Menzel on 15 Sep 2022, 14:39 MID.jpg
Hall Crew hat diese Holzkiste von MID mit Schrauben verschlossen und von der Halle ins Warehouse gebracht.

Already updated in XIM by Stefan Quast.

Coworkers: O. Bilani, S.Menzel, M.Lüdeke, G. Ansaldi
Entry   R+K Regal fuer SQS montiert, posted by Sascha Menzel on 15 Sep 2022, 12:35 
Das zweite R+K Regal für SQS weiter montiert.

Coworkers: S.Menzel, M.Lüdeke
Entry   Hall Organization Meeting, posted by Orkidia Bilani on 15 Sep 2022, 11:32 
All instruments present, except for SPB/SFX.

SCS needs the Hall Crew support for today late afternoon and tomorrow.

SQS asked for Hall Crew support for the comming two weeks.
Entry   R+K Regal fuer SQS montiert, posted by Sascha Menzel on 14 Sep 2022, 16:03 
Angefangen fuer SQS das zweite R+K Regal zu montieren.

Coworkers: S.Menzel, M.Lüdeke 
Entry   SXP unterstuetzt: "Frame of the Momentum Microscope", posted by Sascha Menzel on 14 Sep 2022, 15:52 IMG_6843.jpg
Vom 05.09.2022 - 08.09.2022 

Frame of the  Momentum Microscope aus R+K Profile für SXP montiert.

Coworkers: S.Menzel, V.Vardanyan
Entry   SQS support, posted by Orkidia Bilani on 14 Sep 2022, 15:07 
The cold trap and all the contaminated components (SQS) have being placed in the small washing machine of the vacuum lab.

Coworkers: Hall Crew and Bianca D.

 
Entry   Transport of Helmholtz Coils (SQS) to XHE1, posted by Orkidia Bilani on 14 Sep 2022, 11:09 
The two Helmholtz coils have been transported into the shaftbuliding: XHE1.

Coworkers: Orkidia Bilani, Sascha Menzel

 
ELOG V3.1.4-7c3fd00