Group Selection Page HELP DOC Controls Group Data Analysis Group ITDM WP76 DET Vacuum XRO EEE WP78 WP74 FXE SCS SPB MID HED SQS SXP Sample Environment Photon Commissioning Team Operation PSPO XO TS
XHCrew
  XHCrew logbook, Page 48 of 49  Not logged in ELOG logo
ID Date Author Location Severity Subject
  24   26 Sep 2022, 15:23 Sascha MenzelXHEXPInformationSQS Support

Granitsteine (wo der 1D XUV spectrometer drauf steht) mittels Hutch-Kran versetzt.

Coworkers: Th.Baumann, O.Bilani, M.Lüdeke, S.Menzel

  23   22 Sep 2022, 19:44 Orkidia BilaniXHEXPInformationSQS Support

SQS support:

-> Completed the building up of the vacuum pump and mounted it in the beamline (pic.a and b).

-> Craned and mounted (attached) the 1D XUV spectrometer (from Uppsala) into the beamline (pic.c and d).

 

Coworkers: O,Bilani, Th. Baumann, J. Montano

 

  22   22 Sep 2022, 17:14 Sascha MenzelGeneralInformationHall Crew Techniker Fortbildung Fraesen

Vom 19.09.2022 bis 23.09.2022

Hall Crew Techniker zur Fortbildung (Fräsen) beim bfw (Berufsfortbildungswerk) siehe Bilder und Video.

Coworkers: S.Menzel, M.Lüdeke

  21   21 Sep 2022, 15:47 Orkidia BilaniXHEXPInformationSQS support

SQS supported on building up and preparing for mounting the vacuum pump (see pic below).

Work on going...

Coworkers: O,Bilani, J. Montano

  20   20 Sep 2022, 14:52 Orkidia BilaniXHEXPInformationGas cabinets: TüV

Tobias Bartsch wird bis ende nächste Woche die Gasschränke in SA1 and SA3 prüfen (die TüVs sind fällig).

  19   19 Sep 2022, 15:26 Orkidia BilaniXHEXPInformationSQS support

Support of the SQS with:

- dismounting of coils in the big coils' frame

- Tischfuss: brought into the workshop (M. Schrage)  two times  (gefräst 0.2mm and then again 0.1mm more)

- AQS chamber, dismounted, craned and mounted/attached  to another chamber

- Tomorrow more...

 

Coworkers: T. Baumann, J. Montano, A. de Fanis, O. Bilani

  18   16 Sep 2022, 17:41 Sascha MenzelGeneralInformationTransport zum XHE1

13:00 -> Die für den Transport vorbereitete Box mit HED Part aus der LKW Scheuse zum XHE1 gebracht und eingelagert.

Coworkers: S.Menzel, M.Lüdeke

  16   16 Sep 2022, 15:50 Sascha MenzelXHEXPInformationSCS bei Vacuum Problem unterstuezt

SCS bat um Unterstüzung beim beheben einer defekten Vacuum-Leitung. Der Anschluß war defekt (Leitung abgerissen), die Hall Crew hat einen neuen Anschluß aus dem Vacuum-Lab. besorgt und die Leitung instand gesetzt und wieder angeschlossen.

Mitarbeiter: S.Menzel, M.Lüdeke, J.T.Delitz

  15   16 Sep 2022, 11:27 Sascha MenzelXHEXPInformationMesspunkte am Hallenboden überklebt.

Die Messpunkte am Hallenboden dür den Transport von Kammern mit Luftkissen (Newport) gereinigt und neu überklebt.

Coworkers: M.Lüdeke, S.Menzel

  14   16 Sep 2022, 11:13 Sascha MenzelXHEXPInformationBei MID Area Platz fuer Vaccum geschaffen

Nach Absprache von Orkidia Bilani mit Andreas Schmidt, wurde Platz für die neuen Stellplätze der Pumpen (Vacuum) durch aufrücken geschaffen.

Coworkers: O.Bilani, M.Lüdeke, S.Menzel

  13   15 Sep 2022, 15:42 Orkidia BilaniXHEXPInformationHED big flange in XHEXP1

10:30 -> Discussion between Andreas Schmidt und O.Bilani about a box containing a flange from HED (long term storage).

             Decided to store it in XHE1 (QR:44463 )

            The Hall Crew will take care about the transport into XHE1 (for the current status, see entry of S.Menzel)

  12   15 Sep 2022, 15:35 Orkidia BilaniXHEXPInformationPallet of the "MID AGIPD Stainless Steel Cover"

12:45 -> Meeting Gabriele Ansaldi and O.Bilani about the pallet containing "MID AGIPD Stainless Steel Cover" (QR: 37702) located in the XHEXP1.

            Together we decided to bring it in the Warehouse (short term storage) and O.Bilani will provide Gabriele the updated status.

            Already brought by Hall Crew in the Warhouse and Stefan Quast updated it in XIM.

  11   15 Sep 2022, 14:43 Sascha MenzelXHEXPInformationTransport zum XHE1 vorbereitet (MID)

Einen Flansch von MID in einer Kunstoffbox verpackt, mit QR:44463 versehen und für den Transport am 16.09.2022 zum XHE1 in die LKW Schleuse gestellt.

Coworkers: S.Menzel, M.Lüdeke 

  10   15 Sep 2022, 14:39 Sascha MenzelXHEXPInformationTransport von XHEXP1 zum Warehouse für MID

Hall Crew hat diese Holzkiste von MID mit Schrauben verschlossen und von der Halle ins Warehouse gebracht.

Already updated in XIM by Stefan Quast.

Coworkers: O. Bilani, S.Menzel, M.Lüdeke, G. Ansaldi

  9   15 Sep 2022, 12:35 Sascha MenzelXHEXPInformationR+K Regal fuer SQS montiert

Das zweite R+K Regal für SQS weiter montiert.

Coworkers: S.Menzel, M.Lüdeke

  8   15 Sep 2022, 11:32 Orkidia BilaniXHEXPInformationHall Organization Meeting

All instruments present, except for SPB/SFX.

SCS needs the Hall Crew support for today late afternoon and tomorrow.

SQS asked for Hall Crew support for the comming two weeks.

Waste topic from SXP still pending.

A.Schmidt has a vaccum part to store in XHE1, and another box with a component inside can also be stored in XHE1 (for this still to talk with G. Ansaldi).

S.Menzel and M. Lüdeke will be from 19.09-23.09 on a training outside XFEL.

 

  7   14 Sep 2022, 16:03 Sascha MenzelXHEXPInformationR+K Regal fuer SQS montiert

Angefangen fuer SQS das zweite R+K Regal zu montieren.

Coworkers: S.Menzel, M.Lüdeke 

  6   14 Sep 2022, 15:52 Sascha MenzelXHEXPInformationSXP unterstuetzt: "Frame of the Momentum Microscope"

Vom 05.09.2022 - 08.09.2022 

Frame of the  Momentum Microscope aus R+K Profile für SXP montiert.

Coworkers: S.Menzel, V.Vardanyan

  5   14 Sep 2022, 15:07 Orkidia BilaniXHEXPInformationSQS support

The cold trap and all the contaminated components (SQS) have being placed in the small washing machine of the vacuum lab.

Coworkers: Hall Crew and Bianca D.

 

  4   14 Sep 2022, 11:09 Orkidia BilaniXHEXPInformationTransport of Helmholtz Coils (SQS) to XHE1

The two Helmholtz coils have been transported into the shaftbuliding: XHE1.

Coworkers: Orkidia Bilani, Sascha Menzel

 

ELOG V3.1.4-7c3fd00