SQS support, posted by Orkidia Bilani on 19 Sep 2022, 15:26
|
Support of the SQS with:
- dismounting of coils in the big coils' frame
- Tischfuss: brought into the workshop (M. Schrage) two times (gefräst 0.2mm and then again 0.1mm more) |
Gas cabinets: TüV, posted by Orkidia Bilani on 20 Sep 2022, 14:52
|
Tobias Bartsch wird bis ende nächste Woche die Gasschränke in SA1 and SA3 prüfen (die TüVs sind fällig). |
SQS support, posted by Orkidia Bilani on 21 Sep 2022, 15:47
|
SQS supported on building up and preparing for mounting the vacuum pump (see pic below).
Work on going...
Coworkers: O,Bilani, J. Montano |
SQS Support, posted by Orkidia Bilani on 22 Sep 2022, 19:44    
|
SQS support:
-> Completed the building up of the vacuum pump and mounted it in the beamline (pic.a and b).
-> Craned and mounted (attached) the 1D XUV spectrometer (from Uppsala) into the beamline (pic.c and d). |
SQS: Transport to XHE1, posted by Orkidia Bilani on 27 Sep 2022, 17:32
|
SQS asks for support to transport from Experimental Hall to XHE1 the following components:
-> Cluster source with QR44455 |
FXE Support, posted by Orkidia Bilani on 27 Sep 2022, 20:15
|
FXE (P.Frankenberger, M.Knoll) needs our support on craning Kappa Goniometer (ca.180kg) and attaching it into the beamline. Since the space is
quite limited, one would need a special crane (the manual one that HiBEF has left to HallCrew to be used by all instruments when needed, which unfortunately,
due to a leak problem, is out of service; the talk between S.Arslan and T. Toncian is still pending). |
SQS: Support, posted by Orkidia Bilani on 28 Sep 2022, 13:44
|
Yevheniy sent a ticket to XO Transport, as following:
"Hi Hall Crew, |
Hall Organization Meeting, posted by Orkidia Bilani on 29 Sep 2022, 10:39
|
-> FXE: mentioned, as two days ago, that they will need support on 10.10 for craning of the Kappa Goniometer: Hall Crew will try to find the
best solution for that and organize a meeting between FXE, HallCrew and S. Arslan.
They asked if we know when can they have He again, but we made |
Elevator at TH2, posted by Orkidia Bilani on 29 Sep 2022, 15:52
|
Nils Rennhack called because the elevator at TH2 has stopped between the floors.
L. Kersting was immediately informed, and he is taking care to solve the problem.
|
Joint Cleantent, posted by Orkidia Bilani on 29 Sep 2022, 19:25
|
Mr. Ch. Grüner from "Spetec" came to discuss about the build up of the joint clean tent in the Exp.Hall.
He proposed not to use R+K profiles, but their own, since the R+K profiles do not provide a good stability of the cleanroom modules.
We have most of the filter units, so we do not neccessary need to buy all of them (save money). |
XHE1, posted by Orkidia Bilani on 30 Sep 2022, 10:40
|
XHCrew went to shaft building and took note of the series numbers of the filter units. There are still 8 pieces left and their functionality is somehow
unclear.
Checked the spaces for the next week's transport. |
SCS: Transport to XHE1, posted by Orkidia Bilani on 30 Sep 2022, 10:47  
|
SCS have few components to store in XHE1:
QR 44263 (SCS Test Chamber) which was placed by XHCrew inside a wooden box from SCS.
QR 49608 (fast CCD motorized 4DOF-37394) and QR 49609 (Support for mot 5 DOF Detector-37400). |
HiBEF: Sorting out, posted by Orkidia Bilani on 30 Sep 2022, 10:52
|
HiBEF will start next week sorting out the four Gitterboxes and other things located around/infront of MID hutch:
- J.Hauser will sort out what is waste and what can be stored (long and/or short term storage)
- XHCrew offered support to speed up the action. |
SA1: Luftbefeuchter, posted by Orkidia Bilani on 04 Oct 2022, 08:51
|
Der Luftbefeuchter auf dem Balkon (SA1) hat (akustisches) Alarm gezeigt (seit mind. gestern) .
Die Hebeanlage war kapputt. TS informiert und das Problem behoben/die Hebeanlage wieder repariert. |
Transport to XHE1: Preparation, posted by Orkidia Bilani on 04 Oct 2022, 13:15 
|
We prepared and brought the components, which will be transported to XHE1, into the LKW-Schleuse.
The transport will be carried out tomorrow, 05.10.2022, very early in the morning.
|
Manual red Crane, posted by Orkidia Bilani on 04 Oct 2022, 14:29
|
The manual red crane (from HiBEF) was tested and it WORKS!
Nevertheless an external specialist will take care for the Inbetriebnahme/Zulassung very soon (S.Arslan will contact him).
Instruments (FXE, HiBEF, HED) happy about it |
Transport to XHE1: postponed for tomorrow, posted by Orkidia Bilani on 05 Oct 2022, 10:45
|
Unfortunately it did not succeed, because the elevator in XHE1 is out of service.
Technische Notdienst was there, but could not solve the problem. A technician from "Lutz Aufzüge" will look it up tomorrow.
The Anhänger with the components is in XHE1, the transporter is loaded and ready for the transport tomorrow. |
Hall Crew from 10.10 - 23.10.2022, posted by Orkidia Bilani on 07 Oct 2022, 11:04
|
Next week, 10.10 - 14.10.2022 only one Hall Crew member, M.Lüdeke, will be here. S.Menzel will be on vacation.
On 17.10 - 23.10.2022 Hall Crew is not there. M.Lüdeke and S.Menzel will attend a training
O.Bilani will the whole two weeks on vacation, but always verfügbar. |
Update of the Inventory List: Parts stored in XHE1, posted by Orkidia Bilani on 26 Oct 2022, 13:45
|
The latest/updated inventory list of the parts and components stored in the shaft building XHE1 can be found in Alfresco under:
https://docs.xfel.eu/share/page/site/x-ray-operations/document-details?nodeRef=workspace://SpacesStore/502fb8d6-d305-4447-b4f5-fc34f479ca64
|
Weissklima Technik at SA2, posted by Orkidia Bilani on 27 Oct 2022, 07:54
|
An acustic warning singal was triggered at the Weissklima Technik unit (QR 30755) at SA2- On the display: Nicht dringende Störung.
Acustic signal has been muted, TS will check.
|