1139
|
03 Apr 2025, 16:15 |
Sascha Menzel | XHEXP | Information | HIBEF Support |
Eine große Alu-Leiter (HIBEF) von der XHEXP1 in die LKW-Schleuse transportiert. |
1160
|
10 Apr 2025, 14:05 |
Sascha Menzel | XHEXP | Information | HIBEF Support |
Das Geniometer und das Rack verschoben.
Coworkers: B.Wolf, S.Menzel |
130
|
09 Jan 2023, 11:41 |
Orkidia Bilani | XHEXP | Information | HED: Update entry of 06.01.2023 |
-> The pallet with empty Kartonkisten as well as the other one with the big empty wooden box are removed from the hall (carried out by the HED colleagues).
-> The coffee rests and dirty mugs were cleaned up (carreied out by the HED colleagues).
|
13
|
15 Sep 2022, 15:42 |
Orkidia Bilani | XHEXP | Information | HED big flange in XHEXP1 |
10:30 -> Discussion between Andreas Schmidt und O.Bilani about a box containing a flange from HED (long term storage).
Decided to store it in XHE1 (QR:44463 )
The Hall Crew will take care about the transport into XHE1 (for the current status, see entry of S.Menzel) |
385
|
01 Sep 2023, 08:01 |
Sascha Menzel | General | Information | HED Support |
A.Schmidt fragt ob wir einen Rahmen mit Umrandung für den Reinraum in der HED Hutch bauen können.
R+K Profile (Reste aus dem Warehouse) in der Werkstatt auf Maaß geschnitten und mit Winkeln und Schrauben zu einen Rahmen verschraubt. 4 Aluplatten zugeschnitten, entgratet und Löcher gebohrt. Die Aluplatten an den R+K Rahmen montiert. |
859
|
11 Oct 2024, 14:01 |
Paul Schoenborn | XHEXP | Information | HED Support |
Support beim Abbau zweier Experiment Aufbauten von HiBEF
Coworkers: A.Schmidt, T.Feldmann, P.Schönborn |
898
|
30 Oct 2024, 09:45 |
Paul Schoenborn | XHEXP | Information | HED Support |
Geholfen ein Bauteil aus einer Reinraumbox zu heben und in eine andere Kiste zu verlagern.
Coworkers: A.Schmidt, P.Schönborn |
982
|
16 Dec 2024, 07:48 |
Sascha Menzel | XHEXP | Information | HED Support |
Eine Kammer auf einem Granitblock mit Airpads verschoben. |
1181
|
17 Apr 2025, 16:32 |
Kai-Erik Pfeiffer | XHEXP | Information | HED Support |
Einen Halter für HED umgearbeitet und mit Senkbohrungen versehen. |
719
|
16 Jun 2024, 21:22 |
Orkidia Bilani | XHEXP | Problem | HED : acoustic warning near A.22 |
An acoustic warning at HED near room A.22 (rack room). Attached a short video in which the acoustic warning signal can be heard (the other video was too large to upload)
Callled the PRC colleague, who informed HED. Up to now no Feedback. |
127
|
06 Jan 2023, 10:54 |
Orkidia Bilani | XHEXP | Information | HED |
Contacted S. Göde from HED to remove from the hall the wooden pallet with big empty boxes, currently located in front of the MID hutch. He/his colleagues will do so, and also a big wooden empty box (located next to this pallet) belongig to HED will get removed from the hall.
Also, talked to him about the coffee corner in front of the HED hutch, which is untidy and still with rest boiled coffee from the last user run and unwashed cups. He will take care of that quite soon.
|
174
|
09 Feb 2023, 14:08 |
Sascha Menzel | XHEXP | Information | HDMI Kabel angeschlossen |
4 mini HDMI Kabel von IT besorgt und die restlichen Monitore in der XO Hütte an den PC´s angeschlossen.
|
361
|
12 Jul 2023, 10:22 |
Sascha Menzel | General | Information | Großen Transport zum Außenlager vorbereitet |
Im XHE1 diverse eingelagerte Komponente für den Transport zum Außenlager Uetersen vorbereitet.
Coworkers: O.Bilani, S.Menzel |
1178
|
17 Apr 2025, 13:18 |
Sascha Menzel | XHEXP | Information | Gitterzäune umgestellt. |
Die Lagerflächen der Stahlträger mit Bauzäunen eingezäunt.
Coworkers: K.Pfeiffer, S.Menzel |
334
|
15 Jun 2023, 18:59 |
Sascha Menzel | XHEXP | Information | Gittertür vom XHCrew Lager mit einem Knauf versehen |
An der Gittertür vom XHCrew Lager die Drückeramatur demontiert, zwei Löcher in die Tür gebohrt und Gewinde geschnitten. Vierkannteisen gekürzt und einen Knauf an die Außentür montiert. |
344
|
30 Jun 2023, 13:07 |
Sascha Menzel | XHEXP | Information | Gittertür XHCrew Lager |
29.06 - Eine größere Alu Platte angefertigt und an die Gittertür vom XHCrew Lager angebracht, eine weitere an die andere Seite montiert. |
239
|
24 Mar 2023, 21:13 |
Sascha Menzel | General | Information | Gewinde instandgesetzt |
Innen und Aussengewinde von einer Schnellkupplung instandgesetzt, mit dem Gewindeschneider nachgeschnitten. |
150
|
19 Jan 2023, 09:03 |
Sascha Menzel | XHEXP | Information | Gestörte Klimaanlage Sase1 |
Auf Sase1 ist das Klimagerät Hütte D.09 in Störung (Nicht dringende Störung) Wartung Befeuchter. A.Kondraschew wurde informiert und der Alarm quittiert. Am Montag 23.01.23 kommt eine Firma und wartet diverse Klimaanlagen. |
576
|
01 Mar 2024, 14:05 |
Orkidia Bilani | XHEXP | Information | General |
-> Stromkabel @SQS:
The yellow and the orange ones was/is on the way in the experiment hall, posing thus a Stolpergefahr. Discussed with N. Rennhack and T. Baumann, the yellow one has been removed.
With the advice of O. Engelmann, the orange one will be shared and plugged in into the distributor with SCS (Oleg already informed SCS about). More details, next week.
-> Removed from the hall the waste originating from one of the empty tunnels.
|
822
|
17 Sep 2024, 15:59 |
Orkidia Bilani | General | Information | Gefahrengaslager |
An alarm was triggered in the "Gefahrengaslager", die Kühlung war ausgefallen. Informed P. Schmidt and he together with O.Engelmann took care of that. |