ID Date Author Location Severity Subjectdown
  1139   03 Apr 2025, 16:15 Sascha MenzelXHEXPInformationHIBEF Support

Eine große Alu-Leiter (HIBEF) von der XHEXP1 in die LKW-Schleuse transportiert.

  1160   10 Apr 2025, 14:05 Sascha MenzelXHEXPInformationHIBEF Support

Das Geniometer und das Rack verschoben.

Coworkers: B.Wolf, S.Menzel

  130   09 Jan 2023, 11:41 Orkidia BilaniXHEXPInformationHED: Update entry of 06.01.2023

-> The pallet with empty Kartonkisten as well as the other one with the big empty wooden box are removed from the hall (carried out by the HED colleagues).

-> The coffee rests and dirty mugs were cleaned up (carreied out by the HED colleagues).

 

  13   15 Sep 2022, 15:42 Orkidia BilaniXHEXPInformationHED big flange in XHEXP1

10:30 -> Discussion between Andreas Schmidt und O.Bilani about a box containing a flange from HED (long term storage).

             Decided to store it in XHE1 (QR:44463 )

            The Hall Crew will take care about the transport into XHE1 (for the current status, see entry of S.Menzel)

  385   01 Sep 2023, 08:01 Sascha MenzelGeneralInformationHED Support

A.Schmidt fragt ob wir einen Rahmen mit Umrandung für den Reinraum in der HED Hutch bauen können.

R+K Profile (Reste aus dem Warehouse) in der Werkstatt auf Maaß geschnitten und mit Winkeln und Schrauben zu einen Rahmen verschraubt. 4 Aluplatten zugeschnitten, entgratet und Löcher gebohrt. Die Aluplatten an den R+K Rahmen montiert.

  859   11 Oct 2024, 14:01 Paul SchoenbornXHEXPInformationHED Support

Support beim Abbau zweier Experiment Aufbauten von HiBEF
Coworkers: A.Schmidt, T.Feldmann, P.Schönborn

  898   30 Oct 2024, 09:45 Paul SchoenbornXHEXPInformationHED Support

Geholfen ein Bauteil aus einer Reinraumbox zu heben und in eine andere Kiste zu verlagern.
Coworkers: A.Schmidt, P.Schönborn

  982   16 Dec 2024, 07:48 Sascha MenzelXHEXPInformationHED Support

Eine Kammer auf einem Granitblock mit Airpads verschoben.

  1181   17 Apr 2025, 16:32 Kai-Erik PfeifferXHEXPInformationHED Support

Einen Halter für HED umgearbeitet und mit Senkbohrungen versehen.

  719   16 Jun 2024, 21:22 Orkidia BilaniXHEXPProblemHED : acoustic warning near A.22

An acoustic warning at HED near room A.22 (rack room). Attached a short video in which the acoustic warning signal can be heard (the other video was too large to upload)

 

Callled the PRC colleague, who informed HED. Up to now no Feedback.

  127   06 Jan 2023, 10:54 Orkidia BilaniXHEXPInformationHED

Contacted S. Göde from HED to remove from the hall the wooden pallet with big empty boxes, currently located in front of the MID hutch. He/his colleagues will do so, and also a big wooden empty box (located next to this pallet)  belongig to HED will get removed from the hall.

Also, talked to him about the coffee corner in front of the HED hutch, which is untidy and still with rest boiled coffee from the last user run and unwashed cups. He will take care of that quite soon.

 

 

  174   09 Feb 2023, 14:08 Sascha MenzelXHEXPInformationHDMI Kabel angeschlossen

4 mini HDMI Kabel von IT besorgt und die restlichen Monitore in der XO Hütte an den PC´s angeschlossen.

 

  361   12 Jul 2023, 10:22 Sascha MenzelGeneralInformationGroßen Transport zum Außenlager vorbereitet

Im XHE1 diverse eingelagerte Komponente für den Transport zum Außenlager Uetersen vorbereitet. 

Coworkers: O.Bilani, S.Menzel

  1178   17 Apr 2025, 13:18 Sascha MenzelXHEXPInformationGitterzäune umgestellt.

Die Lagerflächen der Stahlträger mit Bauzäunen eingezäunt.

Coworkers: K.Pfeiffer, S.Menzel

  334   15 Jun 2023, 18:59 Sascha MenzelXHEXPInformationGittertür vom XHCrew Lager mit einem Knauf versehen

An der Gittertür vom XHCrew Lager die Drückeramatur demontiert, zwei Löcher in die Tür gebohrt und Gewinde geschnitten. Vierkannteisen gekürzt und einen Knauf an die Außentür montiert.

  344   30 Jun 2023, 13:07 Sascha MenzelXHEXPInformationGittertür XHCrew Lager

29.06 - Eine größere Alu Platte angefertigt und an die Gittertür vom XHCrew Lager angebracht, eine weitere an die andere Seite montiert.

  239   24 Mar 2023, 21:13 Sascha MenzelGeneralInformationGewinde instandgesetzt

Innen und Aussengewinde von einer Schnellkupplung instandgesetzt, mit dem Gewindeschneider nachgeschnitten.

  150   19 Jan 2023, 09:03 Sascha MenzelXHEXPInformationGestörte Klimaanlage Sase1

Auf Sase1 ist das Klimagerät Hütte D.09 in Störung (Nicht dringende Störung) Wartung Befeuchter. A.Kondraschew wurde informiert und der Alarm quittiert. Am Montag 23.01.23 kommt eine Firma und wartet diverse Klimaanlagen.

  576   01 Mar 2024, 14:05 Orkidia BilaniXHEXPInformationGeneral

-> Stromkabel @SQS:

The yellow and the orange ones was/is on the way in the experiment hall, posing thus a Stolpergefahr. Discussed with N. Rennhack and T. Baumann, the yellow one has been removed.

With the advice of O. Engelmann, the orange one will be shared and plugged in into the distributor with SCS (Oleg already informed SCS about). More details, next week.

-> Removed from the hall the waste originating from one of the empty tunnels.

 

  822   17 Sep 2024, 15:59 Orkidia BilaniGeneralInformationGefahrengaslager

An alarm was triggered in the "Gefahrengaslager", die Kühlung war ausgefallen. Informed P. Schmidt and he together with O.Engelmann took care of that.