Entry   Hall Organization Meeting, posted by Orkidia Bilani on 15 Sep 2022, 11:32 
All instruments present, except for SPB/SFX.

SCS needs the Hall Crew support for today late afternoon and tomorrow.

SQS asked for Hall Crew support for the comming two weeks.
Entry   Pallet of the "MID AGIPD Stainless Steel Cover" , posted by Orkidia Bilani on 15 Sep 2022, 15:35 MID.jpg
12:45 -> Meeting Gabriele Ansaldi and O.Bilani about the pallet containing "MID AGIPD Stainless
Steel Cover" (QR: 37702) located in the XHEXP1.

            Together we decided to bring it in the Warehouse (short term storage) and
Entry   HED big flange in XHEXP1, posted by Orkidia Bilani on 15 Sep 2022, 15:42 
10:30 -> Discussion between Andreas Schmidt und O.Bilani about a box containing a flange from HED (long term storage).

             Decided to store it in XHE1 (QR:44463 )

            The Hall Crew will take care about the transport into XHE1 (for the current
Entry   SQS support, posted by Orkidia Bilani on 19 Sep 2022, 15:26 sqs_19Sept2022.jpg
Support of the SQS with:

- dismounting of coils in the big coils' frame

- Tischfuss: brought into the workshop (M. Schrage)  two times  (gefräst 0.2mm and then again 0.1mm more)
Entry   Gas cabinets: TüV, posted by Orkidia Bilani on 20 Sep 2022, 14:52 
Tobias Bartsch wird bis ende nächste Woche die Gasschränke in SA1 and SA3 prüfen (die TüVs sind fällig).
Entry   SQS support, posted by Orkidia Bilani on 21 Sep 2022, 15:47 sqs_21Sept2022.jpg
SQS supported on building up and preparing for mounting the vacuum pump (see pic below).

Work on going...

Coworkers: O,Bilani, J. Montano
Entry   SQS Support, posted by Orkidia Bilani on 22 Sep 2022, 19:44 sqs_22Sept2022_a.jpgsqs_22Sept2022_b.jpgsqs_22Sept2022_c.jpgsqs_22Sept2022_d.jpgsqs_22Sept2022_.jpg
SQS support:

-> Completed the building up of the vacuum pump and mounted it in the beamline (pic.a and b).

-> Craned and mounted (attached) the 1D XUV spectrometer (from Uppsala) into the beamline (pic.c and d).
Entry   SQS: Transport to XHE1, posted by Orkidia Bilani on 27 Sep 2022, 17:32 
SQS asks for support to transport from Experimental Hall to XHE1 the following components:

-> Cluster source  with QR44455
Entry   FXE Support, posted by Orkidia Bilani on 27 Sep 2022, 20:15 
FXE (P.Frankenberger, M.Knoll)  needs our support on craning Kappa Goniometer (ca.180kg) and attaching it into the beamline. Since the space is
quite limited, one would need a special crane (the manual one that HiBEF has left to HallCrew to be used by all instruments when needed, which unfortunately,
due to a leak problem, is out of service; the talk between S.Arslan and T. Toncian is still pending).
Entry   SQS: Support, posted by Orkidia Bilani on 28 Sep 2022, 13:44 
Yevheniy sent a ticket to XO Transport, as following:




"Hi   Hall Crew, 
Entry   Hall Organization Meeting, posted by Orkidia Bilani on 29 Sep 2022, 10:39 
-> FXE:  mentioned, as two days ago, that they will need support on 10.10 for craning of the Kappa Goniometer: Hall Crew will try to find the
best solution for that and organize a meeting between FXE, HallCrew and S. Arslan.

              They asked if we know when can they have He again, but we made
Entry   Elevator at TH2, posted by Orkidia Bilani on 29 Sep 2022, 15:52 
Nils Rennhack called because the elevator at TH2 has stopped between the floors. 

L. Kersting was immediately informed, and he is taking care to solve the problem.

 
Entry   Joint Cleantent, posted by Orkidia Bilani on 29 Sep 2022, 19:25 
Mr. Ch. Grüner from "Spetec" came to discuss about the build up of the joint clean tent in the Exp.Hall.

He proposed not to use R+K profiles, but their own, since the R+K profiles do not provide a good stability of the cleanroom modules.

We have most of the filter units, so we do not neccessary need to buy all of them (save money).
Entry   XHE1, posted by Orkidia Bilani on 30 Sep 2022, 10:40 
XHCrew went to shaft building and took note of the series numbers of the filter units. There are still 8 pieces left and their functionality is somehow
unclear.

Checked the spaces for the next week's transport.
Entry   SCS: Transport to XHE1, posted by Orkidia Bilani on 30 Sep 2022, 10:47 Image20220930141811.jpgIMG_6918.jpg30Sept2022.jpg
SCS have few components to store in XHE1:

QR 44263 (SCS Test Chamber) which was placed by XHCrew inside a wooden box from SCS.

QR 49608 (fast CCD motorized 4DOF-37394) and QR 49609 (Support for mot 5 DOF Detector-37400).
Entry   HiBEF: Sorting out, posted by Orkidia Bilani on 30 Sep 2022, 10:52 
HiBEF will start next week sorting out the four Gitterboxes and other things located around/infront of MID hutch:

- J.Hauser will sort out what is waste and what can be stored (long and/or short term storage)

- XHCrew offered support to speed up the action.
Entry   SA1: Luftbefeuchter, posted by Orkidia Bilani on 04 Oct 2022, 08:51 Image20221004091403.jpg
Der Luftbefeuchter auf dem Balkon (SA1) hat (akustisches) Alarm gezeigt (seit mind. gestern) .

Die Hebeanlage war kapputt. TS informiert und das Problem behoben/die Hebeanlage wieder repariert.
Entry   Transport to XHE1: Preparation, posted by Orkidia Bilani on 04 Oct 2022, 13:15 Transport_Vorbereitung_1.jpgTransport_Vorbereitung_2.jpg
We prepared and brought the components, which will be transported to XHE1, into the LKW-Schleuse.

The transport will be carried out tomorrow, 05.10.2022, very early in the morning.

 
Entry   Manual red Crane, posted by Orkidia Bilani on 04 Oct 2022, 14:29 Manual_Crane.jpg
The manual red crane (from HiBEF) was tested and it WORKS!

Nevertheless an external specialist will take care for the Inbetriebnahme/Zulassung  very soon (S.Arslan will contact him).

Instruments (FXE, HiBEF, HED) happy about it
Entry   Transport to XHE1: postponed for tomorrow, posted by Orkidia Bilani on 05 Oct 2022, 10:45 
Unfortunately it did not succeed, because the elevator in XHE1 is out of service.

Technische Notdienst was there, but could not solve the problem. A technician from "Lutz Aufzüge" will look it up  tomorrow.

The Anhänger with the components is in XHE1, the transporter is loaded and ready for the transport tomorrow.