Group Selection Page HELP Controls Group Data Analysis Group ITDM WP76 DET Vacuum EEE WP78 WP74 FXE SCS SPB MID HED SQS SXP Sample Environment Operation PSPO XO TS Migrated2Zulip
XHCrew
  XHCrew logbook, Page 32 of 60  Not logged in ELOG logo
New entries since:Thu Jan 1 01:00:00 1970
ID Date Author Location Severity Subjectdown
  511   20 Dec 2023, 14:55 Sascha MenzelGeneralInformationMetallschränke

4 Metallschränke aus der E-Werkstatt in die Halle transportiert und im Lager aufgestellt.

Attachment 1: Image20231220145447.jpg
Image20231220145447.jpg
Attachment 2: Image20231220145450.jpg
Image20231220145450.jpg
  308   25 May 2023, 16:34 Sascha MenzelXHEXPInformationMetallschrank umgestellt

Einen Metallschrank von der Vacuum Gruppe umgestellt.

Attachment 1: Image20230525163435.jpg
Image20230525163435.jpg
  335   15 Jun 2023, 19:06 Sascha MenzelXHEXPInformationMesspunkte überklebt

Dieverse Messpunkte am Boden in der Halle mit Klebeband überklebt.

Attachment 1: Image20230615185747.jpg
Image20230615185747.jpg
  817   16 Sep 2024, 14:29 Paul SchoenbornXHEXPInformationMesspunkte vom Storage bis zu SCS

Messpunkte vom Storage bis zu SCS mit neuem Warnklebeband überklebt nachdem das alte beschädigt war.

  15   16 Sep 2022, 11:27 Sascha MenzelXHEXPInformationMesspunkte am Hallenboden überklebt.

Die Messpunkte am Hallenboden dür den Transport von Kammern mit Luftkissen (Newport) gereinigt und neu überklebt.

Coworkers: M.Lüdeke, S.Menzel

Attachment 1: IMG_6860.jpg
IMG_6860.jpg
  1062   20 Feb 2025, 17:56 Benjamin WolfGeneralInformationMaterialgewinnung

R und K Profile eines alten Reinraumzeltes zerlegt und die Materialien dem Bestand zugeführt.

  51   04 Oct 2022, 14:29 Orkidia BilaniXHEXPInformationManual red Crane

The manual red crane (from HiBEF) was tested and it WORKS!

Nevertheless an external specialist will take care for the Inbetriebnahme/Zulassung  very soon (S.Arslan will contact him).

Instruments (FXE, HiBEF, HED) happy about it

Attachment 1: Manual_Crane.jpg
Manual_Crane.jpg
  424   30 Sep 2023, 11:56 Orkidia BilaniXHEXPProblemMID: LN2 Dewars

M. Petrich called in the morning saying that MID needed two more dewars than originally planned.

A. Zouzoulya did write and called that he didn't have access to the LKW Schleuse. So I came as well to support on that and to show him the dewars in the cage, since there were other filled (ohne Schlauch).

When I arrived Sascha was alreaday here and he did fill the two dewars with transferschlauch (#25578 & #25087)  for MID.

 

  681   11 May 2024, 12:24 Orkidia BilaniXHEXPInformationMID: He 5.0

Moin Sascha,

wie telefonisch besprochen, am Montag früh braucht MID He 5.0. Es sind fünf flaschen beim Gasenlager (nahe Guesthouse) und zwei bei den Stickstoffgitter. Es müssten vielleicht/eventuell (je nach dem was für Experimentzwecke/Experimentverbrauch) alle 2 Stunden welche eingebaut/ausgetauscht in deren Gasschrank. 

Ulrike (sie hat am Montag Frühschicht)  bzw. MID Kollegen werden dir den Druckminderer im Schrank zeigen. Inzwischen sie wird SRP (Vasilii) kontaktieren, dass sie eine Einweisung/Safety vorziehen um später das Flaschenwechsel selbst machen zu können (ab der Zeitpunkt wann Safety gemacht ist/wenn du Feierabend hast, in deren Spät- und Nachtschicht) 

Mehr wirst du am Montag erfahren. 

Lorenz rief um 12:18 an und teilte mit, dass Peter sich bei ihn meldete und zwar auch Peter hätte/kann den Druck nicht höher stellen, es geht nicht. Also bleibt die Flaschenlösung.

LG,

Orkidia

  905   04 Nov 2024, 14:21 Orkidia BilaniXHEXPInformationMID: Consumables for the XHCrew Storage

A. Schmidt donated consumables for the XHCrew storage. To be placed in the cabinets during the week.

Attachment 1: IMG_20241104_125740_HDR.jpg
IMG_20241104_125740_HDR.jpg
Attachment 2: IMG_20241104_130955_HDR.jpg
IMG_20241104_130955_HDR.jpg
Attachment 3: IMG_20241104_125752_HDR.jpg
IMG_20241104_125752_HDR.jpg
  1009   24 Jan 2025, 10:53 Orkidia BilaniXHEXPInformationMID: Consumables for the XHCrew Storage

MID (A. Schmidt) donated consumables for the XHCrew Storage.

Sorted out and placed in the respective drawers.

Co-Workers: B. Wolf; K-E- Pfeiffer; O. Bilani

  562   19 Feb 2024, 14:37 Frank SiyliXHEXPInformationMID support

Support for Gabriele Ansaldi.

Switched mounting direction of the adapter plate and mounted the component on the MDS_2.

Coworkers: Gabriele Ansaldi, Frank Siyli

 

Attachment 1: IMG_4747.jpg
IMG_4747.jpg
Attachment 2: IMG_4749.jpg
IMG_4749.jpg
  123   02 Jan 2023, 09:14 Orkidia BilaniXHEXPInformationMID pump on the exp. hutch roof

On the roof of the MID exp. hutch one of the pumps is making  strange loud noises (laut zischen). The display is off, same as the other pump close to that (which is switched off).

Contacted/called Andreas Schmidt, he assumed that, that is not good with the pump, but cannot solve the problem because he is in home office today and directed me to A.Bartmann.

Tried to reach A. Bartmann, without success (for the moment).

-----10:15----: Reached A. Bartmann, problem solved. Er hat die Stickstoffleitung ausgestellt.

 

Attachment 1: MiD_pump_roof.jpg
MiD_pump_roof.jpg
  483   29 Nov 2023, 19:57 Orkidia BilaniXHEXPInformationMID Support

R. Shayduk  wanted urgently the vacuum steel cover and didn't really know its location and QR code.

This was stored  in our Warehouse in September 2022 (G. Ansaldi, O. Smith and O. Bilani) , QR 37702.

Informed Roman about that, and he will pick it up tomorrow in the Warehouse.

  176   09 Feb 2023, 15:15 Orkidia BilaniXHEXPInformationMID Support

MID (K.Sukharnikov)  asked for our support for the Change of Configuration in their hutch. This will take place next week Thursday, 16.02.2023 after the Hall Organization Meeting (around 10:15)

  179   14 Feb 2023, 13:58 Sascha MenzelXHEXPInformationMID Support

MID unterstüzt beim abkoppeln/abschrauben der Strahl (Bellow) leitung  und diese anschließend verschoben. Den Mamorboden zum schutz mit Gummibelag ausgelegt und die neue Strahlleitung für das anschließen vorbereitet.

Die Arbeiten werden am 15.02 ab 10:00 fortgeführt.

 

Coworkers: K.Sukharnikov, A.Bartmann, O.Biliani, S.Menzel, M.Lüdeke

Attachment 1: Image20230214135148.jpg
Image20230214135148.jpg
Attachment 2: Image20230214141444.jpg
Image20230214141444.jpg
Attachment 3: Image20230214141638.jpg
Image20230214141638.jpg
Attachment 4: Image20230214135151.jpg
Image20230214135151.jpg
  195   22 Feb 2023, 14:27 Sascha MenzelGeneralInformationMID Support

G.Ansaldi beim Aufbau des R+K Gestell für das SDL-LiquidJet Project unterstützt.

Coworkers: O.Bilani, G.Ansaldi, S.Menzel

Attachment 1: Image20230222142713.jpg
Image20230222142713.jpg
Attachment 2: Image20230222142717.jpg
Image20230222142717.jpg
Attachment 3: Image20230222142719.jpg
Image20230222142719.jpg
  201   27 Feb 2023, 17:22 Sascha MenzelXHEXPInformationMID Support

MID unterstüzt beim hochklappen der Strahlleitung, danach den Gummibelag vom Marmorboden entfernt und den Bellow wieder verschoben.

Coworkers: G.Ansaldi, O.Bilani, S.Menzel

Attachment 1: Image20230214135151.jpg
Image20230214135151.jpg
Attachment 2: Image20230214141638.jpg
Image20230214141638.jpg
Attachment 3: Image20230227172015.jpg
Image20230227172015.jpg
  202   28 Feb 2023, 13:52 Sascha MenzelXHEXPInformationMID Support

MID unterstüzt bei der Montage des PINK Modul und das Gestell SDL-LiquidJet Project in deren Hutch.

Cowokers: G.Ansaldi, S.Menzel

Attachment 1: Image20230228135022.jpg
Image20230228135022.jpg
Attachment 2: Image20230228135034.jpg
Image20230228135034.jpg
  233   22 Mar 2023, 13:59 Sascha MenzelXHEXPInformationMID Support

An einem frame an den unteren Seiten 4 Luftkissen montiert.

Coworkers: G.Ansaldi, O.Bilani, S.Menzel

Attachment 1: Image20230322135856.jpg
Image20230322135856.jpg
ELOG V3.1.4-7c3fd00