Metallschränke , posted by Sascha Menzel on 20 Dec 2023, 14:55 
|
4 Metallschränke aus der E-Werkstatt in die Halle transportiert und im Lager aufgestellt. |
Metallschrank umgestellt, posted by Sascha Menzel on 25 May 2023, 16:34
|
Einen Metallschrank von der Vacuum Gruppe umgestellt. |
Messpunkte überklebt, posted by Sascha Menzel on 15 Jun 2023, 19:06
|
Dieverse Messpunkte am Boden in der Halle mit Klebeband überklebt. |
Messpunkte vom Storage bis zu SCS, posted by Paul Schoenborn on 16 Sep 2024, 14:29
|
Messpunkte vom Storage bis zu SCS mit neuem Warnklebeband überklebt nachdem das alte beschädigt war. |
Messpunkte am Hallenboden überklebt., posted by Sascha Menzel on 16 Sep 2022, 11:27
|
Die Messpunkte am Hallenboden dür den Transport von Kammern mit Luftkissen (Newport) gereinigt und neu überklebt.
Coworkers: M.Lüdeke, S.Menzel |
Materialgewinnung, posted by Benjamin Wolf on 20 Feb 2025, 17:56
|
R und K Profile eines alten Reinraumzeltes zerlegt und die Materialien dem Bestand zugeführt. |
Manual red Crane, posted by Orkidia Bilani on 04 Oct 2022, 14:29
|
The manual red crane (from HiBEF) was tested and it WORKS!
Nevertheless an external specialist will take care for the Inbetriebnahme/Zulassung very soon (S.Arslan will contact him).
Instruments (FXE, HiBEF, HED) happy about it |
MID: LN2 Dewars, posted by Orkidia Bilani on 30 Sep 2023, 11:56
|
M. Petrich called in the morning saying that MID needed two more dewars than originally planned.
A. Zouzoulya did write and called that he didn't have access to the LKW Schleuse. So I came as well to support on that and to show him the
dewars in the cage, since there were other filled (ohne Schlauch). |
MID: He 5.0, posted by Orkidia Bilani on 11 May 2024, 12:24
|
Moin Sascha,
wie telefonisch besprochen, am Montag früh braucht MID He 5.0. Es sind fünf flaschen beim Gasenlager (nahe Guesthouse) und zwei bei
den Stickstoffgitter. Es müssten vielleicht/eventuell (je nach dem was für Experimentzwecke/Experimentverbrauch) alle 2 Stunden welche eingebaut/ausgetauscht |
MID: Consumables for the XHCrew Storage, posted by Orkidia Bilani on 04 Nov 2024, 14:21  
|
A. Schmidt donated consumables for the XHCrew storage. To be placed in the cabinets during the week. |
MID: Consumables for the XHCrew Storage, posted by Orkidia Bilani on 24 Jan 2025, 10:53
|
MID (A. Schmidt) donated consumables for the XHCrew Storage.
Sorted out and placed in the respective drawers.
Co-Workers: B. Wolf; K-E- Pfeiffer; O. Bilani |
MID support, posted by Frank Siyli on 19 Feb 2024, 14:37 
|
Support for Gabriele Ansaldi.
Switched mounting direction of the adapter plate and mounted the component on the MDS_2.
Coworkers: Gabriele Ansaldi, Frank Siyli |
MID pump on the exp. hutch roof, posted by Orkidia Bilani on 02 Jan 2023, 09:14
|
On the roof of the MID exp. hutch one of the pumps is making strange loud noises (laut zischen). The display is off,
same as the other pump close to that (which is switched off).
Contacted/called Andreas Schmidt, he assumed that, that is not good with the pump, but cannot solve the problem |
MID Support , posted by Orkidia Bilani on 29 Nov 2023, 19:57
|
R. Shayduk wanted urgently the vacuum steel cover and didn't really know its location and QR code.
This was stored in our Warehouse in September 2022 (G. Ansaldi, O. Smith and O. Bilani) , QR 37702.
Informed Roman about that, and he will pick it up tomorrow in the Warehouse. |
MID Support, posted by Orkidia Bilani on 09 Feb 2023, 15:15
|
MID (K.Sukharnikov) asked for our support for the Change of Configuration in their hutch. This will take place next week Thursday, 16.02.2023 after
the Hall Organization Meeting (around 10:15) |
MID Support, posted by Sascha Menzel on 14 Feb 2023, 13:58   
|
MID unterstüzt beim abkoppeln/abschrauben der Strahl (Bellow) leitung und diese anschließend verschoben. Den Mamorboden zum
schutz mit Gummibelag ausgelegt und die neue Strahlleitung für das anschließen vorbereitet.
Die Arbeiten werden am 15.02 ab 10:00 fortgeführt. |
MID Support, posted by Sascha Menzel on 22 Feb 2023, 14:27  
|
G.Ansaldi beim Aufbau des R+K Gestell für das SDL-LiquidJet Project unterstützt.
Coworkers: O.Bilani, G.Ansaldi, S.Menzel |
MID Support, posted by Sascha Menzel on 27 Feb 2023, 17:22  
|
MID unterstüzt beim hochklappen der Strahlleitung, danach den Gummibelag vom Marmorboden entfernt und den Bellow wieder verschoben.
Coworkers: G.Ansaldi, O.Bilani, S.Menzel |
MID Support, posted by Sascha Menzel on 28 Feb 2023, 13:52 
|
MID unterstüzt bei der Montage des PINK Modul und das Gestell SDL-LiquidJet Project in deren Hutch.
Cowokers: G.Ansaldi, S.Menzel |
MID Support, posted by Sascha Menzel on 22 Mar 2023, 13:59
|
An einem frame an den unteren Seiten 4 Luftkissen montiert.
Coworkers: G.Ansaldi, O.Bilani, S.Menzel |