SCS: Pumpedisplay, posted by Orkidia Bilani on 11 May 2024, 13:36 
|
Near the SCS Clean Tent, where the big chamber is, below, on the pump there is a control monitor/display. It peeps and perhpas there is something with that.
|
SCS: Craning, posted by Orkidia Bilani on 20 Feb 2023, 10:05  
|
Supported SCS in their hutch: craned the DSSC Detector and mounted it on the final operation position.
Coworkers: S.Menzel, O.Bilani, JT. Delitz. L. Le Guyader
|
SCS: Consumables Storage, posted by Orkidia Bilani on 15 Mar 2024, 10:57
|
SCS gave a box full of consumables for the consumables storage. |
SCS support, posted by Frank Siyli on 13 Feb 2024, 14:39  
|
Carsten Broers SCS unterstützt.
3 Abstandsplatten getauscht.
Coworkers: Carsten Broers, Frank Siyli |
SCS support, posted by Frank Siyli on 27 Feb 2024, 15:27  
|
Supported Carsten Broers to unscrew parts of the experimental structure. |
SCS support, posted by Frank Siyli on 29 Feb 2024, 16:45
|
Air pad powered instrument move from SCS to the assembly area.
Coworkers: J.T. Delitz, C Broers, F.Siyli |
SCS support, posted by Frank Siyli on 11 Mar 2024, 16:32
|
SCS instrument assembly |
SCS clean tent installation 8.12.2022, posted by Michael Luedeke on 09 Dec 2022, 07:55   
|
The big aluminium plate is mounted
The frame of the clean tent is well moving
Some small tasks are missing and will be done next week
|
SCS clean tent installation 6.12.2022, posted by Michael Luedeke on 07 Dec 2022, 08:15 8x
|
Installation C-Profile
Moving Chamber 1
Moving Chamber 2
Material preparation |
SCS clean tent 7.12.2022, posted by Michael Luedeke on 08 Dec 2022, 07:51  
|
Preparation top plate part 1 (drilling, cutting, mounting) |
SCS bei Vacuum Problem unterstuezt, posted by Sascha Menzel on 16 Sep 2022, 15:50
|
SCS bat um Unterstüzung beim beheben einer defekten Vacuum-Leitung. Der Anschluß war defekt (Leitung abgerissen), die Hall Crew hat einen neuen Anschluß aus dem Vacuum-Lab. besorgt und die Leitung instand gesetzt und wieder angeschlossen.
Mitarbeiter: S.Menzel, M.Lüdeke, J.T.Delitz |
SCS Umbau Doppelboden, posted by Daniel Jaacks on 12 Sep 2025, 07:22 
|
Nachtrag 11.09.25
Doppelboden und Geländer vergrößert und angepasst.
Coworkers: K.Pfeiffer, D.Jaacks |
SCS Transport, posted by Orkidia Bilani on 19 Mar 2024, 14:32
|
Discussed with J.T. Delitz about the transport of their components. He will label the parts and where to be transported. We'll find them tomorrow ready in the hall.
|
SCS Support: Transport to Warehouse , posted by Orkidia Bilani on 20 Mar 2024, 10:55 
|
SCS: Brought a chiller and a pallet with boxes with equipment at the warehouse. |
SCS Support: Transport to Uetersen , posted by Orkidia Bilani on 19 Sep 2024, 17:38
|
A box with equipment from SCS (L. Le Guyader; QR 63576) brought to Ütersen in Block 9 and put inside the grey box where the rest of the same part are stored. |
SCS Support: Craning, posted by Orkidia Bilani on 16 Oct 2023, 16:50
|
Craned for SCS a component which belonged to Desy users/colleagues.
This will then be transported from SCS back to Desy.
Coworkers: O.Bilani, M.Peter, J.Shima |
SCS Support Transport XHE1, posted by Benjamin Wolf on 04 Jul 2025, 11:28 
|
CHEM DEP Setup (52494/52495) und die Waage(49642) ins XHE1 gebracht
Coworker: B.Wolf , K.Pfeiffer |
SCS Support (Nachtrag 23.10.2025), posted by Benjamin Wolf on 24 Oct 2025, 06:12
|
Die blaue Kammer vor der Hall Crew Hutch auf Carsten´s Arbeitsplatz verfahren.
Coworker:K.Pfeiffer,D.Jaacks,B.Wolf,C.Broers |
SCS Support , posted by Orkidia Bilani on 01 Nov 2023, 09:58
|
Supported SCS with craning of a shikane.
Co-workers: O.Bilani, JT.Delitz
|
SCS Support , posted by Orkidia Bilani on 05 Jan 2024, 13:36 
|
SCS Support:
Dismounted and craned the "Chem DPS" from the big "Chem".
Co-workers: O. Bilani, F. Siyli, JT. Delitz. |