SQS Support, posted by Daniel Jaacks on 24 Sep 2025, 11:00
|
Mit Ares eine 6m Tube aus dem Warehouse zum SQS Hutch verbracht.
Coworkers: B.Wolf, A,Igharas und D.Jaacks |
SQS Support, posted by Sascha Menzel on 02 Oct 2025, 17:42
|
Eine Helium Flasche für Yevheniy (SQS) vom Gaselager zur Halle transportiert. |
SQS Support, posted by Daniel Jaacks on 14 Oct 2025, 14:00
|
Halter für Silikonölauffangbehälter angefertigt und montiert.
Coworkers: K.Pfeiffer, D.Jaacks |
SQS Support, posted by Daniel Jaacks on 05 Nov 2025, 12:28
|
Schaltkasten am Remi, Position nach wünschen von Rebecca und Nils angepasst.
Coworkers: A.Scherz,B.Wolf, D.Jaacks |
SQS Support, posted by Benjamin Wolf on 05 Nov 2025, 12:41
|
2 Komponenten ( manipulator) von einer Kammer abgekrant. |
SQS Schaltschränke, posted by Kai-Erik Pfeiffer on 16 Jul 2025, 14:24
|
Den zweiten Schaltschrank am Remis eingebaut.
Coworkers:
D. Jaacks, B. Wolf, K. Pfeiffer |
SQS Schaltschränke, posted by Kai-Erik Pfeiffer on 04 Aug 2025, 10:35
|
Den letzten Schaltschrank an das Experiment gebaut. Dazu drei R+K Profile zurechtgesägt und montiert.
Coworkers:
D. Jaacks, K. Pfeiffer |
SQS R+K Regal , posted by Sascha Menzel on 15 Mar 2023, 13:28 
|
Die beiden angefertigten Alu Profile an das R+K Regal montiert und das Regal in die SQS Area gestellt. |
SQS Parts verladen, posted by Sascha Menzel on 28 Mar 2023, 20:41 
|
Die SQS parts die zum XHE1 transportiert werden sollen in den Transporter und dem Anhänger verladen. |
SQS Laserboard Regal 2, posted by Michael Luedeke on 06 Oct 2022, 08:21
|
5.10.2022 ---> Rose Krieger Profile gesägt und montiert |
SQS Hutch Kühlwasser, posted by Michael Luedeke on 06 Oct 2022, 08:23
|
29.9.22 ---> SQS Kühlwasser an einer Vacuumpumpe installiert |
SQS Hutch 19" Gerät montiert, posted by Michael Luedeke on 06 Oct 2022, 08:25
|
28.09.22 ---> 19" Gerät montiert, dazu Rose Krieger Winkel angepasst |
SQS Gestell befestigen, posted by Michael Luedeke on 11 Oct 2022, 15:03  
|
11.10.22 ---> SQS Hutch, Doppelkreuz Rahmengestell am Boden befestigen, 4 Bohrungen |
SQS Frame Installation for exaust air 20.12.2022, posted by Michael Luedeke on 21 Dec 2022, 07:48    
|
| |
SQS, posted by Orkidia Bilani on 07 Dec 2022, 14:07
|
Together with T.Mazza checked the COMO source, which is located in XHE1.
This will be brought back in January in XHEXP1, details will follow in due time.
|
SQS, posted by Orkidia Bilani on 09 Dec 2022, 11:54 
|
Contacted SQS (N.Rennhack) and suggested solution for three chemical kanisters "Thermal G for Julabo" located at the entrance of their hutch.
They have been removed from there, and are now located in the chemicals' storage.
Coworkers: V. Bazhenov, O. Bilani
|
SPB/SFX: Transport-Storage to Ütersen, posted by Orkidia Bilani on 21 May 2024, 14:43
|
Jayanath Koliyadu - SPB/SFX wants to store in Ütersen another Optical Table, QR 48796. It is currently located in the experiment hall near the xhcrew hutch.
|
SPB/SFX: Craning the Julabo chiller, posted by Orkidia Bilani on 23 Nov 2023, 15:07
|
Supported SPB/SFX with craning down the Julabo Chiller from the rack room.
It will be shipped to the manufacturer for repair.
Co-workers: O. Bilani, T. Dietze |
SPB/SFX Support: Craning, posted by Orkidia Bilani on 11 Oct 2023, 20:51
|
SPB/SFX got a new chiller, which was then craned into the rack room.
The borrowed chiller (the one they borrowed from SCS) was craned out of the rack room.
Coworkers: O.Bilani, S.Menzel, M. Peter, M. Sikorski, T. Dietze
|
SPB/SFX Support: Craning, posted by Orkidia Bilani on 20 Nov 2023, 12:22
|
Craned the Julabo chiller up to the rarck room for SPB/SFX.
Co-workers: O. Bilani, M. Peter, Th. Dietze
|