Entry   SQS Support, posted by Sascha Menzel on 02 Oct 2025, 17:42 

Eine Helium Flasche für Yevheniy (SQS) vom Gaselager zur Halle transportiert.

Entry   SQS Support, posted by Daniel Jaacks on 14 Oct 2025, 14:00 Image20251014135907.jpg

Halter für Silikonölauffangbehälter angefertigt und montiert.

 

Coworkers: K.Pfeiffer, D.Jaacks

Entry   SQS Schaltschränke, posted by Kai-Erik Pfeiffer on 16 Jul 2025, 14:24 Image20250716142345.jpg

Den zweiten Schaltschrank am Remis eingebaut.

 

Coworkers:

D. Jaacks, B. Wolf, K. Pfeiffer

Entry   SQS Schaltschränke, posted by Kai-Erik Pfeiffer on 04 Aug 2025, 10:35 Image20250804103452.jpg

Den letzten Schaltschrank an das Experiment gebaut. Dazu drei R+K Profile zurechtgesägt und montiert.

 

Coworkers:

D. Jaacks, K. Pfeiffer

Entry   SQS R+K Regal , posted by Sascha Menzel on 15 Mar 2023, 13:28 Image20230315132802.jpgImage20230315132805.jpg

Die beiden angefertigten Alu Profile an das R+K Regal montiert und das Regal in die SQS Area gestellt.

Entry   SQS Parts verladen, posted by Sascha Menzel on 28 Mar 2023, 20:41 Image20230328202830.jpgImage20230328202832.jpg

Die SQS parts die zum XHE1 transportiert werden sollen in den Transporter und dem Anhänger verladen.

Entry   SQS Laserboard Regal 2, posted by Michael Luedeke on 06 Oct 2022, 08:21 

5.10.2022 ---> Rose Krieger Profile gesägt und montiert

Entry   SQS Hutch Kühlwasser, posted by Michael Luedeke on 06 Oct 2022, 08:23 

29.9.22 ---> SQS Kühlwasser an einer Vacuumpumpe installiert

Entry   SQS Hutch 19" Gerät montiert, posted by Michael Luedeke on 06 Oct 2022, 08:25 

28.09.22 ---> 19" Gerät montiert, dazu Rose Krieger Winkel angepasst

Entry   SQS Gestell befestigen, posted by Michael Luedeke on 11 Oct 2022, 15:03 IMG_20221011_144045.jpgIMG_20221011_144026.jpgIMG_20221011_144031.jpg

11.10.22 ---> SQS Hutch, Doppelkreuz Rahmengestell am Boden befestigen, 4 Bohrungen

Entry   SQS Frame Installation for exaust air 20.12.2022, posted by Michael Luedeke on 21 Dec 2022, 07:48 20221220_135039.jpg20221220_135103.jpg20221220_135133.jpg20221220_135109.jpg20221220_135053.jpg
 
Entry   SQS, posted by Orkidia Bilani on 07 Dec 2022, 14:07 

Together with T.Mazza checked the COMO source, which is located in XHE1.

This will be brought back in January in XHEXP1, details will follow in due time.

 

 

Entry   SQS, posted by Orkidia Bilani on 09 Dec 2022, 11:54 SQS_ThermalG_c.jpgSQS_ThermalG_a.jpg

Contacted SQS (N.Rennhack) and suggested solution  for three chemical kanisters "Thermal G for Julabo" located at the entrance of their hutch.

They have been removed from there, and are now located in the chemicals' storage.

Coworkers: V. Bazhenov, O. Bilani

 

Entry   SPB/SFX: Transport-Storage to Ütersen, posted by Orkidia Bilani on 21 May 2024, 14:43 SPB-SFX.jpg

Jayanath Koliyadu - SPB/SFX wants to store in Ütersen  another Optical Table, QR 48796. It is currently located in the experiment hall near the xhcrew hutch.

 

Entry   SPB/SFX: Craning the Julabo chiller, posted by Orkidia Bilani on 23 Nov 2023, 15:07 IMG_20231123_123243_MP.jpg

Supported SPB/SFX with craning down the Julabo Chiller from the rack room.

It will be shipped to the manufacturer for repair.

 

Co-workers: O. Bilani, T. Dietze 

Entry   SPB/SFX Support: Craning, posted by Orkidia Bilani on 11 Oct 2023, 20:51 

SPB/SFX got a new chiller, which was then craned into the rack room. 

The borrowed chiller (the one they borrowed from SCS) was craned out of the rack room.

Coworkers: O.Bilani, S.Menzel, M. Peter, M. Sikorski, T. Dietze

 

Entry   SPB/SFX Support: Craning, posted by Orkidia Bilani on 20 Nov 2023, 12:22 

Craned the Julabo chiller up to the rarck room for SPB/SFX.

Co-workers: O. Bilani, M. Peter, Th. Dietze

 

Entry   SPB/SFX Support, posted by Sascha Menzel on 30 Sep 2022, 14:29 

N.Reimers bat die XH Crew um unterstützung, Im Gasschrank wurde eine Stickstoffflasche durch eine Heliumflasche ersetzt. P.Schmidt gab die Heliumflasche heraus und Stickstoffflasche wurde im Gaslager eingelagert.

 

Coworkers: N.Reimers, P.Schmidt, S.Menzel

Entry   SPB/SFX Support, posted by Sascha Menzel on 02 Nov 2023, 14:57 

Einen Chiller von einer Palette mittels Hallenkran gekrant.

Coworkers: O.Bilani, S.Menzel, Th.Dietze

Entry   SPB/SFX Support, posted by Orkidia Bilani on 10 Nov 2023, 11:34 IMG_20231110_104226_MP.jpgIMG_20231110_110437_MP.jpg

With P. Vagovic, SPB/SFX, sorted out components and trash from the hall.

Brought the table and the small box (Pic.1) to their Lab 303.

Discarded the things on the trolley and the black transport box was placed near SEC lab, 400 area (Pic.2).

 