SXP Support, posted by Orkidia Bilani on 25 Jul 2024, 14:53
|
-> Connected the dewar in the exp. hutch.
-> Emptied a (more or less broken) table located in the experiment hall (at their small assembly area)
and disposed it. |
SXP: LN2 Dewar, posted by Orkidia Bilani on 24 Jul 2024, 13:44
|
SXP had a leaking issue from their ventile (Hahn). It couldn't be exchanged so quick, since they had to order a new one. P. Schmidt sugessted that
a dewar with "Schlauch" should solve in a short time the problem. Thus the two dewars filled by P. Schmidt on Monday, are not needed any more.
Filled one dewar with "Schlauch" for SXP. |
Uetersen: Transport and Structuring, posted by Orkidia Bilani on 24 Jul 2024, 13:32 
|
-> Transport a box with parts of the Mechanical Engineering group. This will be needed always during the maintenance periods.
-> Structured Block 10
|
LN2 Dewar, posted by Orkidia Bilani on 22 Jul 2024, 11:42
|
Filled dewar #25283 for L. Batchelor. He needed it to XHE2, and O. Smith transported it there. |
Dewar gefüllt, posted by Sascha Menzel on 19 Jul 2024, 08:08
|
Zwei Dewar für Vacuum gefüllt. |
SXP Support, posted by Sascha Menzel on 18 Jul 2024, 10:26
|
Bei 5 Metallschränken auf der Balkon Ebene nahe SXP Kontroll Hutch jeweils 2 Schubladen und einen Fachboden zusätzlich eingebaut. |
Transport nach Uetersen, posted by Sascha Menzel on 17 Jul 2024, 12:15
|
Eine Box mit Anbaumaterial für Lasertische von Uetersen zum XFEL transportiert und T.Dietze/N.Reimers übergeben. |
Transport zum XHE1, posted by Sascha Menzel on 17 Jul 2024, 09:23
|
Zwei Gitterboxen QR44213 und QR52724 von HIBEF zum XHE1 transportiert.
Coworkers: S.Menzel, O.Bilani |
Dewar gefüllt, posted by Sascha Menzel on 16 Jul 2024, 13:51
|
Dewar #25089 für J.Moore gefüllt. |
SPB Support, posted by Sascha Menzel on 16 Jul 2024, 13:49
|
Zwei Lasertische von Palette auf einen R+K Rollwagen mit dem Hallenkran gekrant.
Coworkers: S.Menzel, T.Dietze |
SQS Support, posted by Sascha Menzel on 12 Jul 2024, 13:17
|
In der SQS Hutch mit dem mobilen (roten) Kran und Hutch-Kran das imaging Spektromete auf Granitblöcke gekrant.
Coworkers: S.Menzel, T.Baumann, J.Montano, A.Igharas |
Dewar gefüllt, posted by Sascha Menzel on 12 Jul 2024, 11:24
|
Zwei Dewar für Vacuum gefüllt. |
Dewar gefüllt, posted by Sascha Menzel on 11 Jul 2024, 14:06
|
Zwei Dewar #25584 u. #25580 für Robin Schubert gefüllt. |
SCS Support, posted by Sascha Menzel on 10 Jul 2024, 10:26
|
Den DSSC Detektor mit dem Hutch-Kran auf ein rollbares Gestell gekrant und in die SCS Area gestellt. |
Schrank für Kranfernbedienung, posted by Sascha Menzel on 10 Jul 2024, 10:23
|
Den Schrank für die Kranferbedienung in die XHCrew Hutch mittels Gabelstapler gehoben.
Coworkers: S.Menzel, M.Pooch |
Transport nach Uetersen und XHE1, posted by Sascha Menzel on 09 Jul 2024, 12:29   
|
Einen Lasertisch von SPB QR44209 und eine leere Holzbox von SQS ohne QR nach Uetersen transportiert und dort eingelagert. Einen Deckel von MID QR62855
zum XHE1 transportiert und dort eingelagert, auf den Rückweg einen Pumpenstand und eine Kammer QR58407 von HIBEF zur XHEXP1 transportiert.
Coworkers: S.Menzel, O.Bilani, M.Pooch |
SCS Support, posted by Sascha Menzel on 08 Jul 2024, 12:53
|
Den blauen Rahmen zur Stellprobe an die richtige Position gekrant, Maaß genommen und wieder an die Seite gekrant. |
Vacuum Support, posted by Sascha Menzel on 08 Jul 2024, 11:26
|
Zwei Paletten mit Vacuum Parts aus dem XHE2 und XHE3 zur LKW-Schleuse transportiert.
Coworkers: S.Menzel, M.Pooch, J.Eidam |
Dewar gefüllt, posted by Sascha Menzel on 05 Jul 2024, 11:44
|
Zwei Dewar für Vacuum gefüllt. |
SCS Support, posted by Sascha Menzel on 04 Jul 2024, 13:42
|
In der SCS Hutch mit dem Hutch-Kran ein R+K Gestell über einen Bellow gekrant.
Coworkers: S.Menzel, Loïc |