40
|
30 Sep 2022, 10:47 |
Orkidia Bilani | XHEXP | Information | SCS: Transport to XHE1 |
SCS have few components to store in XHE1:
QR 44263 (SCS Test Chamber) which was placed by XHCrew inside a wooden box from SCS.
QR 49608 (fast CCD motorized 4DOF-37394) and QR 49609 (Support for mot 5 DOF Detector-37400).
A big Gestell Traverse (QR 49620) in the SCS Hutch craned onto pallets and brought into the LKW Schleuse (pic.3).
This transport will take place on 5.10.2022
Coworkers: S.Menzel, O.Bilani
|
Attachment 1: Image20220930141811.jpg
|
|
Attachment 2: IMG_6918.jpg
|
|
Attachment 3: 30Sept2022.jpg
|
|
105
|
07 Dec 2022, 11:16 |
Orkidia Bilani | XHEXP | Information | SCS: Transport (XHE1, XHEXP1) |
Until the end of the year SCS needs back from XHE1 to XHEXP1 the components (QR 44265, QR 49608, QR 49609 and QR 49620).
Further, other components will be stored in the XHE1. Details will follow by next week.
|
682
|
11 May 2024, 13:36 |
Orkidia Bilani | XHEXP | Information | SCS: Pumpedisplay |
Near the SCS Clean Tent, where the big chamber is, below, on the pump there is a control monitor/display. It peeps and perhpas there is something with that.
|
Attachment 1: IMG_20240511_125033.jpg
|
|
Attachment 2: IMG_20240511_125056_MP.jpg
|
|
191
|
20 Feb 2023, 10:05 |
Orkidia Bilani | XHEXP | Information | SCS: Craning |
Supported SCS in their hutch: craned the DSSC Detector and mounted it on the final operation position.
Coworkers: S.Menzel, O.Bilani, JT. Delitz. L. Le Guyader
|
Attachment 1: Image20230220095950.jpg
|
|
Attachment 2: Image20230220095953.jpg
|
|
Attachment 3: Image20230220095956.jpg
|
|
603
|
15 Mar 2024, 10:57 |
Orkidia Bilani | XHEXP | Information | SCS: Consumables Storage |
SCS gave a box full of consumables for the consumables storage. |
Attachment 1: IMG_20240315_095619_MP.jpg
|
|
554
|
13 Feb 2024, 14:39 |
Frank Siyli | XHEXP | Information | SCS support |
Carsten Broers SCS unterstützt.
3 Abstandsplatten getauscht.
Coworkers: Carsten Broers, Frank Siyli |
Attachment 1: IMG_4738.jpg
|
|
Attachment 2: IMG_4739.jpg
|
|
Attachment 3: IMG_4740.jpg
|
|
572
|
27 Feb 2024, 15:27 |
Frank Siyli | XHEXP | Information | SCS support |
Supported Carsten Broers to unscrew parts of the experimental structure. |
Attachment 1: IMG_4773.jpg
|
|
Attachment 2: IMG_4774.jpg
|
|
Attachment 3: IMG_4775.jpg
|
|
574
|
29 Feb 2024, 16:45 |
Frank Siyli | XHEXP | Information | SCS support |
Air pad powered instrument move from SCS to the assembly area.
Coworkers: J.T. Delitz, C Broers, F.Siyli |
Attachment 1: IMG_4784.jpg
|
|
593
|
11 Mar 2024, 16:32 |
Frank Siyli | XHEXP | Information | SCS support |
SCS instrument assembly |
Attachment 1: IMG_4827.jpg
|
|
110
|
09 Dec 2022, 07:55 |
Michael Luedeke | General | Information | SCS clean tent installation 8.12.2022 |
The big aluminium plate is mounted
The frame of the clean tent is well moving
Some small tasks are missing and will be done next week
|
Attachment 1: 20221208_135111.jpg
|
|
Attachment 2: 20221208_135102.jpg
|
|
Attachment 3: 20221208_150916.jpg
|
|
Attachment 4: 20221208_150854.jpg
|
|
102
|
07 Dec 2022, 08:15 |
Michael Luedeke | General | Information | SCS clean tent installation 6.12.2022 |
Installation C-Profile
Moving Chamber 1
Moving Chamber 2
Material preparation |
Attachment 1: 20221206_113121.jpg
|
|
Attachment 2: 20221206_113133_01.jpg
|
|
Attachment 3: 20221206_113439.jpg
|
|
Attachment 4: 20221206_131938.jpg
|
|
Attachment 5: 20221206_150354.jpg
|
|
Attachment 6: 20221206_133226.jpg
|
|
Attachment 7: 20221206_134043.jpg
|
|
Attachment 8: 20221206_140010.jpg
|
|
107
|
08 Dec 2022, 07:51 |
Michael Luedeke | General | Information | SCS clean tent 7.12.2022 |
Preparation top plate part 1 (drilling, cutting, mounting) |
Attachment 1: 20221207_111414.jpg
|
|
Attachment 2: 20221207_120127.jpg
|
|
Attachment 3: 20221207_134755.jpg
|
|
16
|
16 Sep 2022, 15:50 |
Sascha Menzel | XHEXP | Information | SCS bei Vacuum Problem unterstuezt |
SCS bat um Unterstüzung beim beheben einer defekten Vacuum-Leitung. Der Anschluß war defekt (Leitung abgerissen), die Hall Crew hat einen neuen Anschluß aus dem Vacuum-Lab. besorgt und die Leitung instand gesetzt und wieder angeschlossen.
Mitarbeiter: S.Menzel, M.Lüdeke, J.T.Delitz |
610
|
19 Mar 2024, 14:32 |
Orkidia Bilani | XHEXP | Information | SCS Transport |
Discussed with J.T. Delitz about the transport of their components. He will label the parts and where to be transported. We'll find them tomorrow ready in the hall.
|
611
|
20 Mar 2024, 10:55 |
Orkidia Bilani | XHEXP | Information | SCS Support: Transport to Warehouse |
SCS: Brought a chiller and a pallet with boxes with equipment at the warehouse. |
Attachment 1: IMG_20240320_102226_MP.jpg
|
|
Attachment 2: IMG_20240320_102653_MP.jpg
|
|
832
|
19 Sep 2024, 17:38 |
Orkidia Bilani | XHEXP | Information | SCS Support: Transport to Uetersen |
A box with equipment from SCS (L. Le Guyader; QR 63576) brought to Ütersen in Block 9 and put inside the grey box where the rest of the same part are stored. |
Attachment 1: IMG_20240919_094209_HDR.jpg
|
|
444
|
16 Oct 2023, 16:50 |
Orkidia Bilani | XHEXP | Information | SCS Support: Craning |
Craned for SCS a component which belonged to Desy users/colleagues.
This will then be transported from SCS back to Desy.
Coworkers: O.Bilani, M.Peter, J.Shima |
Attachment 1: IMG_20231016_141659_MP.jpg
|
|
455
|
01 Nov 2023, 09:58 |
Orkidia Bilani | XHEXP | Information | SCS Support |
Supported SCS with craning of a shikane.
Co-workers: O.Bilani, JT.Delitz
|
Attachment 1: IMG_20231101_084556_MP.jpg
|
|
514
|
05 Jan 2024, 13:36 |
Orkidia Bilani | XHEXP | Information | SCS Support |
SCS Support:
Dismounted and craned the "Chem DPS" from the big "Chem".
Co-workers: O. Bilani, F. Siyli, JT. Delitz. |
Attachment 1: IMG_20240105_114458_MP.jpg
|
|
Attachment 2: IMG_20240105_120721_MP.jpg
|
|
1095
|
12 Mar 2025, 14:19 |
Benjamin Wolf | XHEXP | Information | SCS Support |
Halterung für einen Positionssensor gebaut und diesen am GRD Modul verbaut
|
Attachment 1: 20250312_141535.jpg
|
|
Attachment 2: 20250312_141544.jpg
|
|