Group Selection Page HELP Controls Group Data Analysis Group ITDM WP76 DET Vacuum EEE WP78 FXE SPB MID HED SQS SXP Sample Environment Operation PSPO XO TS Migrated2Zulip
XHCrew
  XHCrew logbook, Page 22 of 65  Not logged in ELOG logo
New entries since:Thu Jan 1 01:00:00 1970
ID Date Author Locationdown Severity Subject
  827   19 Sep 2024, 09:16 Sascha MenzelXHEXPInformationMID Support

Eine Pumpe auf die MID Hutch gekrant und auf den vorgesehenen Platz gestellt.

Coworkers: P.Schönborn, S.Menzel

Attachment 1: Image20240919091523.jpg
Image20240919091523.jpg
Attachment 2: Image20240919091526.jpg
Image20240919091526.jpg
  830   19 Sep 2024, 11:18 Sascha MenzelXHEXPInformationSXP Support

Den Deckel wieder runter gekrant und die Kammer verschlossen.

 

Attachment 1: Image20240916142209.jpg
Image20240916142209.jpg
  832   19 Sep 2024, 17:38 Orkidia BilaniXHEXPInformationSCS Support: Transport to Uetersen

A box with equipment from SCS (L. Le Guyader; QR 63576) brought to Ütersen in Block 9 and put inside the grey box where the rest of the same part are stored.

Attachment 1: IMG_20240919_094209_HDR.jpg
IMG_20240919_094209_HDR.jpg
  834   24 Sep 2024, 11:28 Paul SchoenbornXHEXPInformationSQS Support

Helped SQS transport their REMI-Microscope to their hutch
Coworkers: N. Rennack, A. Igharas, R.Boll, P. Schönborn

  835   24 Sep 2024, 11:32 Paul SchoenbornXHEXPInformationHIBEF Support

Brought back a two chiller from Uetersen
Coworkers: S.Menzel, O.Bilani, P.Schönborn

 

Attachment 1: Image20240924123007.jpg
Image20240924123007.jpg
  836   24 Sep 2024, 12:33 Paul SchoenbornXHEXPInformationSQS Support

Brought back a Rackcabinet from Osdorf
Coworkers: S.Menzel, O.Bilani, P.Schönborn

Attachment 1: Image20240924125752.jpg
Image20240924125752.jpg
Attachment 2: Image20240924143647.jpg
Image20240924143647.jpg
  839   25 Sep 2024, 20:33 Paul SchoenbornXHEXPInformationSXP Support

Dismounted the two remaining R+K Profiles and placed them on the trolley under the stairs.

Attachment 1: 1000000031.jpg
1000000031.jpg
Attachment 2: 1000000032.jpg
1000000032.jpg
  840   25 Sep 2024, 20:35 Paul SchoenbornXHEXPInformationConsumables Storage XO

Sorted the screws, nuts, studs and washers that were donated to us into the Screwcabinet aswell as the Special Wishes Cabinet.

  841   26 Sep 2024, 09:21 Sascha MenzelXHEXPInformationSCS Support

Auf den XHCrew Rollwagen zwei 80er R+K Profile gelegt und darauf ein SCS Part (Arm/Banane) gekrant und verschraubt. Das ganzein den SCS Reinraum gestellt. Der Rollwagen wird für ca. 3Wochen an SCS ausgeliehen.

Attachment 1: Image20240926091926.jpg
Image20240926091926.jpg
Attachment 2: Image20240926091928.jpg
Image20240926091928.jpg
  843   28 Sep 2024, 19:31 Paul SchoenbornXHEXPInformationScrew´s Storage

Sorted the Special´s Screws storage from M1 to M10 in rising numbers from drawer 2 until 5.

  847   01 Oct 2024, 14:52 Sascha MenzelXHEXPInformationSCS Support

Einen Helium Dewar von und zur SCS Hutch transportiert und getauscht. Einen halb leeren Dewar mit Füllstand draußen im Gitter gekennzeichnet.

  850   02 Oct 2024, 14:23 Sascha MenzelXHEXPInformationSCS Support

Einen Helium Dewar auf die Waage gestellt und eine defekte Pumpe im Pumpenraum ausgebaut und durch eine neue ersetzt.

Coworkers: J.T.Delitz, S.Menzel

  852   08 Oct 2024, 15:05 Orkidia BilaniXHEXPInformationTasks of the day

1) Transport for HiBEF ( Doppelwiege fürs Goniometer, QR 47963) from XHE1 to the exp.hall. Coworkers: O. Bilani; H. Heuer

2) Craning the protection curtains/Gestell  of the HiBEF Goniometer and moved the goniometer outside. Coworkers: S. Arslan; O. Bilani; B. Näser; C. Baehtz

3) Organized the transport of the red manual crane with the fork lift from XHE2 to the LKW Schluese (Thanks to M. Pooch). Together with P. Frankenberger we'll bring it tomorrow to the exp.hall.

4) Supported MID colleagues with 160-Gaskets in the consumable' storage.

5) SXP (V. Vrdanyan)  does not need the LN2 dewar on 09.10. Perhaps one on 13.10, but he will let us know in advance.

6) Transport from Ütersen to the exp.hall of a Rollensystem (QR47964) for HiBEF on 09.10. (they need it at ~13:00)

7) Weiss-Klima Technik: muted acoustic signals for three of them. No warning/error/malfunction, just the standard  "Wartung - Meldung"

Attachment 1: IMG_20241008_140345_HDR.jpg
IMG_20241008_140345_HDR.jpg
Attachment 2: IMG_20241008_135703_HDR.jpg
IMG_20241008_135703_HDR.jpg
Attachment 3: IMG_20241008_140539_HDR.jpg
IMG_20241008_140539_HDR.jpg
  857   10 Oct 2024, 14:32 Paul SchoenbornXHEXPInformationMID Support

Building Table Extensions for MID with ITEM profiles and prepared them with threadcutters.

Attachment 1: 20241010_140703.jpg
20241010_140703.jpg
  858   11 Oct 2024, 13:55 Paul SchoenbornXHEXPInformationMID Support

Die Tischverlängerungen vollständig an den Tisch angebracht

Attachment 1: 20241011_130359.jpg
20241011_130359.jpg
  859   11 Oct 2024, 14:01 Paul SchoenbornXHEXPInformationHED Support

Support beim Abbau zweier Experiment Aufbauten von HiBEF
Coworkers: A.Schmidt, T.Feldmann, P.Schönborn

Attachment 1: 20241011_093242.jpg
20241011_093242.jpg
  861   13 Oct 2024, 20:40 Sascha MenzelXHEXPInformation12.10. Arbeiten im XHCrew Lager
  1. Einen Schrank für Vacuum parts leer geräumt und mit Lagerboxen bestückt.
  2. Aus dem Warehouse Lagerboxen besorgt und angefangen RK Rose+Krieger parts zu sortieren, in die Boxen zu verräumen und zu beschriften. 
Attachment 1: Image20241013203947.jpg
Image20241013203947.jpg
  862   13 Oct 2024, 20:47 Sascha MenzelXHEXPInformationArbeiten im XHCrew Lager

Weiter RK Rose+Krieger parts sortiert und in die Boxen verräumt und beschriftet. Einen Schrank ausgeräumt und mit weiteren Regalböden bestückt und die Boxen einsortiert.

Attachment 1: Image20241013203940.jpg
Image20241013203940.jpg
Attachment 2: Image20241013203944.jpg
Image20241013203944.jpg
  863   14 Oct 2024, 14:12 Paul SchoenbornXHEXPInformationStorage Washer sortiert

M8 Washer anfegangen zu sortieren und noch ein paar verschiedene Schraubengrößen einsortiert.

  866   15 Oct 2024, 15:52 Sascha MenzelXHEXPInformationMID Support

Das Reinraumzelt von MID im Bereich XO Hutch umgesetzt, dafür wurde der Reinraum angekrant und auf Rollbretter gestellt und darauf zum Abstellort transportiert und abgesetzt.

Coworkers: A.Schmidt, O.Bilani, S.Menzel

Attachment 1: Image20241015155733.jpg
Image20241015155733.jpg
ELOG V3.1.4-7c3fd00