685
|
21 May 2024, 14:37 |
Orkidia Bilani | XHEXP | Information | SEC Solvents Supply | From the fume hood of the SEC solvents
supply, an acoustic warning signal is activated.
Wrote Vasilii B. about this, and |
|
40
|
30 Sep 2022, 10:47 |
Orkidia Bilani | XHEXP | Information | SCS: Transport to XHE1 | SCS have few components to store in XHE1:
QR 44263 (SCS Test Chamber) which
was placed by XHCrew inside a wooden box |
  |
105
|
07 Dec 2022, 11:16 |
Orkidia Bilani | XHEXP | Information | SCS: Transport (XHE1, XHEXP1) | Until the end of the year SCS needs back
from XHE1 to XHEXP1 the components (QR 44265,
QR 49608, QR 49609 and QR 49620). |
|
682
|
11 May 2024, 13:36 |
Orkidia Bilani | XHEXP | Information | SCS: Pumpedisplay | Near the SCS Clean Tent, where the big
chamber is, below, on the pump there is a
control monitor/display. It peeps and perhpas |
 |
191
|
20 Feb 2023, 10:05 |
Orkidia Bilani | XHEXP | Information | SCS: Craning | Supported SCS in their hutch: craned
the DSSC Detector and mounted it on the final
operation position. |
  |
603
|
15 Mar 2024, 10:57 |
Orkidia Bilani | XHEXP | Information | SCS: Consumables Storage | SCS gave a box full
of consumables for the consumables storage. |
|
554
|
13 Feb 2024, 14:39 |
Frank Siyli | XHEXP | Information | SCS support | Carsten Broers SCS unterstützt.
3 Abstandsplatten getauscht.
Coworkers: Carsten Broers, Frank |
  |
572
|
27 Feb 2024, 15:27 |
Frank Siyli | XHEXP | Information | SCS support | Supported Carsten Broers to unscrew parts
of the experimental structure. |
  |
574
|
29 Feb 2024, 16:45 |
Frank Siyli | XHEXP | Information | SCS support | Air pad powered instrument move from SCS
to the assembly area.
|
|
593
|
11 Mar 2024, 16:32 |
Frank Siyli | XHEXP | Information | SCS support | SCS instrument assembly |
|
110
|
09 Dec 2022, 07:55 |
Michael Luedeke | General | Information | SCS clean tent installation 8.12.2022 | The big aluminium plate is mounted
The frame of the clean tent is
well moving |
   |
102
|
07 Dec 2022, 08:15 |
Michael Luedeke | General | Information | SCS clean tent installation 6.12.2022 | Installation C-Profile
Moving Chamber 1
Moving Chamber 2 |
8x |
107
|
08 Dec 2022, 07:51 |
Michael Luedeke | General | Information | SCS clean tent 7.12.2022 | Preparation top plate part 1 (drilling,
cutting, mounting) |
  |
16
|
16 Sep 2022, 15:50 |
Sascha Menzel | XHEXP | Information | SCS bei Vacuum Problem unterstuezt | SCS bat um Unterstüzung beim beheben
einer defekten Vacuum-Leitung. Der Anschluß
war defekt (Leitung abgerissen), die Hall |
|
610
|
19 Mar 2024, 14:32 |
Orkidia Bilani | XHEXP | Information | SCS Transport | Discussed with J.T. Delitz about the transport
of their components. He will label the parts
and where to be transported. We'll find |
|
611
|
20 Mar 2024, 10:55 |
Orkidia Bilani | XHEXP | Information | SCS Support: Transport to Warehouse | SCS: Brought a chiller and a pallet with
boxes with equipment at the warehouse. |
 |
832
|
19 Sep 2024, 17:38 |
Orkidia Bilani | XHEXP | Information | SCS Support: Transport to Uetersen | A box with equipment from SCS (L. Le Guyader;
QR 63576) brought to Ütersen in Block
9 and put inside the grey box where the rest |
|
444
|
16 Oct 2023, 16:50 |
Orkidia Bilani | XHEXP | Information | SCS Support: Craning | Craned for SCS a component which belonged
to Desy users/colleagues.
This will then be transported from |
|
455
|
01 Nov 2023, 09:58 |
Orkidia Bilani | XHEXP | Information | SCS Support | Supported SCS with craning of a shikane.
Co-workers: O.Bilani, JT.Delitz
|
|
514
|
05 Jan 2024, 13:36 |
Orkidia Bilani | XHEXP | Information | SCS Support | SCS Support:
Dismounted and craned the "Chem
DPS" from the big "Chem". |
 |