Group Selection Page HELP Controls Group Data Analysis Group ITDM WP76 DET Vacuum EEE WP78 WP74 FXE SCS SPB MID HED SQS SXP Sample Environment Operation PSPO XO TS Migrated2Zulip
XHCrew
  XHCrew logbook, Page 22 of 59  Not logged in ELOG logo
New entries since:Thu Jan 1 01:00:00 1970
ID Date Author Location Severity Subjectdown
  40   30 Sep 2022, 10:47 Orkidia BilaniXHEXPInformationSCS: Transport to XHE1

SCS have few components to store in XHE1:

QR 44263 (SCS Test Chamber) which was placed by XHCrew inside a wooden box from SCS.

QR 49608 (fast CCD motorized 4DOF-37394) and QR 49609 (Support for mot 5 DOF Detector-37400).

A big Gestell Traverse (QR 49620) in the SCS Hutch craned onto pallets and brought into the LKW Schleuse (pic.3).

This transport will take place on 5.10.2022

 

Coworkers: S.Menzel, O.Bilani

 

 

Attachment 1: Image20220930141811.jpg
Image20220930141811.jpg
Attachment 2: IMG_6918.jpg
IMG_6918.jpg
Attachment 3: 30Sept2022.jpg
30Sept2022.jpg
  105   07 Dec 2022, 11:16 Orkidia BilaniXHEXPInformationSCS: Transport (XHE1, XHEXP1)

Until the end of the year SCS needs back from XHE1 to XHEXP1 the components (QR 44265, QR 49608, QR 49609 and QR 49620).

Further, other components will be stored in the XHE1. Details will follow by next week.

 

  682   11 May 2024, 13:36 Orkidia BilaniXHEXPInformationSCS: Pumpedisplay

Near the SCS Clean Tent, where the big chamber is, below, on the pump there is a control monitor/display. It peeps and perhpas there is something with that.

 

Attachment 1: IMG_20240511_125033.jpg
IMG_20240511_125033.jpg
Attachment 2: IMG_20240511_125056_MP.jpg
IMG_20240511_125056_MP.jpg
  191   20 Feb 2023, 10:05 Orkidia BilaniXHEXPInformationSCS: Craning

Supported SCS in their hutch:  craned the DSSC Detector and mounted it on the final operation position.

Coworkers: S.Menzel, O.Bilani, JT. Delitz. L. Le Guyader

 

Attachment 1: Image20230220095950.jpg
Image20230220095950.jpg
Attachment 2: Image20230220095953.jpg
Image20230220095953.jpg
Attachment 3: Image20230220095956.jpg
Image20230220095956.jpg
  603   15 Mar 2024, 10:57 Orkidia BilaniXHEXPInformationSCS: Consumables Storage

SCS gave a box full of consumables for the consumables storage.

Attachment 1: IMG_20240315_095619_MP.jpg
IMG_20240315_095619_MP.jpg
  554   13 Feb 2024, 14:39 Frank SiyliXHEXPInformationSCS support

Carsten Broers SCS unterstützt.

3 Abstandsplatten getauscht.

Coworkers: Carsten Broers, Frank Siyli

Attachment 1: IMG_4738.jpg
IMG_4738.jpg
Attachment 2: IMG_4739.jpg
IMG_4739.jpg
Attachment 3: IMG_4740.jpg
IMG_4740.jpg
  572   27 Feb 2024, 15:27 Frank SiyliXHEXPInformationSCS support

Supported Carsten Broers to unscrew parts of the experimental structure.

Attachment 1: IMG_4773.jpg
IMG_4773.jpg
Attachment 2: IMG_4774.jpg
IMG_4774.jpg
Attachment 3: IMG_4775.jpg
IMG_4775.jpg
  574   29 Feb 2024, 16:45 Frank SiyliXHEXPInformationSCS support

Air pad powered instrument move from SCS to the assembly area.

 

Coworkers: J.T. Delitz, C Broers, F.Siyli 

Attachment 1: IMG_4784.jpg
IMG_4784.jpg
  593   11 Mar 2024, 16:32 Frank SiyliXHEXPInformationSCS support

SCS instrument assembly

Attachment 1: IMG_4827.jpg
IMG_4827.jpg
  110   09 Dec 2022, 07:55 Michael LuedekeGeneralInformationSCS clean tent installation 8.12.2022

The big aluminium plate is mounted

The frame of the clean tent is well moving

Some small tasks are missing and will be done next week

 

Attachment 1: 20221208_135111.jpg
20221208_135111.jpg
Attachment 2: 20221208_135102.jpg
20221208_135102.jpg
Attachment 3: 20221208_150916.jpg
20221208_150916.jpg
Attachment 4: 20221208_150854.jpg
20221208_150854.jpg
  102   07 Dec 2022, 08:15 Michael LuedekeGeneralInformationSCS clean tent installation 6.12.2022

Installation C-Profile

Moving Chamber 1

Moving Chamber 2

Material preparation

Attachment 1: 20221206_113121.jpg
20221206_113121.jpg
Attachment 2: 20221206_113133_01.jpg
20221206_113133_01.jpg
Attachment 3: 20221206_113439.jpg
20221206_113439.jpg
Attachment 4: 20221206_131938.jpg
20221206_131938.jpg
Attachment 5: 20221206_150354.jpg
20221206_150354.jpg
Attachment 6: 20221206_133226.jpg
20221206_133226.jpg
Attachment 7: 20221206_134043.jpg
20221206_134043.jpg
Attachment 8: 20221206_140010.jpg
20221206_140010.jpg
  107   08 Dec 2022, 07:51 Michael LuedekeGeneralInformationSCS clean tent 7.12.2022

Preparation top plate part 1 (drilling, cutting, mounting)

Attachment 1: 20221207_111414.jpg
20221207_111414.jpg
Attachment 2: 20221207_120127.jpg
20221207_120127.jpg
Attachment 3: 20221207_134755.jpg
20221207_134755.jpg
  16   16 Sep 2022, 15:50 Sascha MenzelXHEXPInformationSCS bei Vacuum Problem unterstuezt

SCS bat um Unterstüzung beim beheben einer defekten Vacuum-Leitung. Der Anschluß war defekt (Leitung abgerissen), die Hall Crew hat einen neuen Anschluß aus dem Vacuum-Lab. besorgt und die Leitung instand gesetzt und wieder angeschlossen.

Mitarbeiter: S.Menzel, M.Lüdeke, J.T.Delitz

  610   19 Mar 2024, 14:32 Orkidia BilaniXHEXPInformationSCS Transport

Discussed with J.T. Delitz about the transport of their components. He will label the parts and where to be transported. We'll find them tomorrow ready in the hall.

 

  611   20 Mar 2024, 10:55 Orkidia BilaniXHEXPInformationSCS Support: Transport to Warehouse

SCS: Brought a chiller and a pallet with boxes with equipment at the warehouse.

Attachment 1: IMG_20240320_102226_MP.jpg
IMG_20240320_102226_MP.jpg
Attachment 2: IMG_20240320_102653_MP.jpg
IMG_20240320_102653_MP.jpg
  832   19 Sep 2024, 17:38 Orkidia BilaniXHEXPInformationSCS Support: Transport to Uetersen

A box with equipment from SCS (L. Le Guyader; QR 63576) brought to Ütersen in Block 9 and put inside the grey box where the rest of the same part are stored.

Attachment 1: IMG_20240919_094209_HDR.jpg
IMG_20240919_094209_HDR.jpg
  444   16 Oct 2023, 16:50 Orkidia BilaniXHEXPInformationSCS Support: Craning

Craned for SCS a component which belonged to Desy users/colleagues.

This will then be transported from SCS back to Desy.

Coworkers: O.Bilani, M.Peter, J.Shima

Attachment 1: IMG_20231016_141659_MP.jpg
IMG_20231016_141659_MP.jpg
  455   01 Nov 2023, 09:58 Orkidia BilaniXHEXPInformationSCS Support

Supported SCS with craning of a shikane.

Co-workers: O.Bilani, JT.Delitz

 

Attachment 1: IMG_20231101_084556_MP.jpg
IMG_20231101_084556_MP.jpg
  514   05 Jan 2024, 13:36 Orkidia BilaniXHEXPInformationSCS Support

SCS Support:

Dismounted and craned the "Chem DPS" from the big "Chem". 

Co-workers: O. Bilani, F. Siyli, JT. Delitz.

Attachment 1: IMG_20240105_114458_MP.jpg
IMG_20240105_114458_MP.jpg
Attachment 2: IMG_20240105_120721_MP.jpg
IMG_20240105_120721_MP.jpg
  1095   12 Mar 2025, 14:19 Benjamin WolfXHEXPInformationSCS Support

Halterung für einen Positionssensor gebaut und diesen am GRD Modul verbaut

 

 

 

Attachment 1: 20250312_141535.jpg
20250312_141535.jpg
Attachment 2: 20250312_141544.jpg
20250312_141544.jpg
ELOG V3.1.4-7c3fd00