ID |
Date |
Author |
Location |
Severity |
Subject |
399
|
18 Sep 2023, 14:41 |
Sascha Menzel | XHEXP | Information | SXP Support |
Das Momentum Mikroskope vom Gestell mittels Hutch-Kran gekrant.
Coworkers: O.Bilani, M.Peter, S.Menzel, M.Izquierdo, V.Vardanyan, D.Doblas Jiménez |
Attachment 1: Image20230918144632.jpg
|
|
467
|
10 Nov 2023, 12:25 |
Sascha Menzel | XHEXP | Information | SXP Support |
Eine Edelstahlleitung gekürzt und auf Maaß gebogen, diverse Adapter und eine Flexschlauch an die Leitung montiert. Die fertige Leitung angeschlossen und an das R+K Gestell befestigt. Die Leitung und Adapter kamen von P.Schmidt (TS).
|
Attachment 1: Image20231110113433.jpg
|
|
Attachment 2: Image20231110113437.jpg
|
|
Attachment 3: Image20231110113439.jpg
|
|
Attachment 4: Image20231110113441.jpg
|
|
Attachment 5: Image20231110113444.jpg
|
|
476
|
17 Nov 2023, 20:48 |
Orkidia Bilani | XHEXP | Information | SXP Support |
SXP support yesterday (M. Izquierdo) and today (V.Vardanyans) with practical things :-) |
528
|
16 Jan 2024, 09:21 |
Sascha Menzel | XHEXP | Information | SXP Support |
R+K Profile und ein Stützrad an das R+K Gestell montiert.
Coworkers: F.Siyli, S.Menzel, V.Vardanyan |
Attachment 1: Image20240116090555.jpg
|
|
Attachment 2: Image20240116090558.jpg
|
|
530
|
17 Jan 2024, 14:49 |
Sascha Menzel | XHEXP | Information | SXP Support |
Ein weiteres R+K Profil und ein Stützrad an das R+K Gestell montiert. |
536
|
25 Jan 2024, 08:53 |
Sascha Menzel | XHEXP | Information | SXP Support |
Die letzten R+K Profile und höhenverstellbare Rollen montiert.
Coworkers: O.Bilani, S.Menzel, V.Vardanyan |
Attachment 1: Image20240125085309.jpg
|
|
594
|
11 Mar 2024, 17:55 |
Sascha Menzel | XHEXP | Information | SXP Support |
Einen kleinen und einen großen Metallschrank vom XHCrew Lager zur SXP Hutch transportiert. Einen Holzschrank in der Hutch ausgeräumt und nach draußen transportiert und entsorgt. Die beiden Metallschränke in der Hutch aufgestellt.
Coworkers: S.Menzel, O.Bilani, V.Vardanyan |
Attachment 1: IMG_8258_1.jpg
|
|
694
|
27 May 2024, 14:41 |
Sascha Menzel | XHEXP | Information | SXP Support |
An 2 Posterrahmen Magnete montiert und diese an die SXP exp.Hutch Stahltür geheftet. |
Attachment 1: Image20240527144002.jpg
|
|
703
|
05 Jun 2024, 13:58 |
Sascha Menzel | XHEXP | Information | SXP Support |
Einen Granit in der SCS Hutch an den Verstellschrauben in eine andere Position verstellt. |
707
|
06 Jun 2024, 15:05 |
Sascha Menzel | XHEXP | Information | SXP Support |
Die oberen Monitore in der Kontoll Hutch von SXP abgenommen, die Halter nach links verschoben und die Monitore an die HAlter wieder angehängt und angeschlossen.
Coworkers: S.Menzel, M.Pooch (TS) |
Attachment 1: Image20240606150515.jpg
|
|
Attachment 2: Image20240606150518.jpg
|
|
Attachment 3: Image20240606150520.jpg
|
|
750
|
18 Jul 2024, 10:26 |
Sascha Menzel | XHEXP | Information | SXP Support |
Bei 5 Metallschränken auf der Balkon Ebene nahe SXP Kontroll Hutch jeweils 2 Schubladen und einen Fachboden zusätzlich eingebaut. |
Attachment 1: Image20240719111251.jpg
|
|
755
|
25 Jul 2024, 14:53 |
Orkidia Bilani | XHEXP | Information | SXP Support |
-> Connected the dewar in the exp. hutch.
-> Emptied a (more or less broken) table located in the experiment hall (at their small assembly area) and disposed it.
-> Prepared (Anschlagen") a chamber for craning, which s. Arslan will carry out tomorrow.
Co-Workers: O. Bilani, V. Vardanyan |
757
|
31 Jul 2024, 14:17 |
Orkidia Bilani | XHEXP | Information | SXP Support |
-> Emptied another (more or less broken) table located in the experiment hall (at SXP small assembly area) and disposed it.
-> V. Vardanyan placed in SXP cabinets most of the content of the SXP boxes in the Hall.
-> Brought to the 2nd life shelf a box with a non-fitting hose for the air pads (Der Schlauchanschluß passt nicht zu den Anschluß der Druckluftinstallation in der Halle).
-> Got a box full of small sorting boxes for our consumables' storage and placed it in the cabinet.
Co-workers: V. Vardanyan; O. Bilani |
779
|
22 Aug 2024, 21:04 |
Sascha Menzel | XHEXP | Information | SXP Support |
Einen Verteiler mit Absperrventilen für die Entnahme von LN2 zusammengebaut und eine Dichtheitsprüfung an einen Dewar durchgeführt. |
Attachment 1: Image20240822192317.jpg
|
|
809
|
12 Sep 2024, 15:08 |
Sascha Menzel | General | Information | SXP Support |
Am Montag 16.09. wird eine Kammer getrennt und mit dem Hutch-Kran angehoben damit eine Fremdfirma aus Frankreich an der Kammer arbeiten kann. Um die Kammer sicher abzusetzen, wurde ein Gestell aus R+K Profilen gebaut.
Coworkers: J.Ohnesorge, V.Vardanyan, P.Schönborn, S.Menzel |
Attachment 1: Image20240912150022.jpg
|
|
Attachment 2: Image20240912150024.jpg
|
|
Attachment 3: Image20240912150027.jpg
|
|
811
|
13 Sep 2024, 12:22 |
Sascha Menzel | XHEXP | Information | SXP Support |
Für das kranen am Montag 16.09. muss eine Pumpe von der Kammer entfernt werden. Die Kammer wurde befüftet, anschließend wurde die Pumpe demontiert und die Kammer mit einem Blindflansch wieder verschlossen und ein Vacuum-Test durchgeführt.
Coworkers: J.Ohnesorge, S.Menzel |
Attachment 1: Image20240913122655.jpg
|
|
Attachment 2: Image20240913122657.jpg
|
|
816
|
16 Sep 2024, 14:25 |
Sascha Menzel | XHEXP | Information | SXP Support |
Eine Kammer auf 600mm mit dem Hutch-Kran angehoben und mit R+K Profilen unterbaut. Die Kammer auf die R+K Profile abgesetzt. |
Attachment 1: Image20240916142209.jpg
|
|
Attachment 2: Image20240916142212.jpg
|
|
Attachment 3: Image20240916142214.jpg
|
|
818
|
17 Sep 2024, 12:33 |
Sascha Menzel | XHEXP | Information | SXP Support |
Einen 55 zoll Monitor in der SXP Kontrollhütte an Hilti Profilen angebracht. Der Monitorhalter hat keine Neigungswinkeleinstellung und wird von P.Grychtol neu bestellt.
Coworkers: P.Schönborn, S.Menzel |
Attachment 1: Image20240918141658.jpg
|
|
830
|
19 Sep 2024, 11:18 |
Sascha Menzel | XHEXP | Information | SXP Support |
Den Deckel wieder runter gekrant und die Kammer verschlossen.
|
Attachment 1: Image20240916142209.jpg
|
|
839
|
25 Sep 2024, 20:33 |
Paul Schoenborn | XHEXP | Information | SXP Support |
Dismounted the two remaining R+K Profiles and placed them on the trolley under the stairs. |
Attachment 1: 1000000031.jpg
|
|
Attachment 2: 1000000032.jpg
|
|