Group Selection Page HELP Controls Group ITDM WP76 DET Vacuum EEE WP78 FXE SPB HED SQS SXP Sample Environment Operation PSPO XO TS Migrated2Zulip MigratedByGroup
XHCrew
  XHCrew logbook, Page 19 of 69  Not logged in ELOG logo
Entry   SXP Support, posted by Sascha Menzel on 11 Jul 2023, 10:52 

Das Momentum Mikroscope wieder auf das Gestell gekrant.

Entry   SXP Support, posted by Sascha Menzel on 12 Sep 2023, 10:56 Image20230912105622.jpgImage20230912105625.jpgImage20230912105627.jpg

Zwei R+K Profile an Momentum Microscope frame montiert und zwei Eletroboxen versetzt.

Coworkers: M.Peter, S.Menzel

Entry   SXP Support, posted by Sascha Menzel on 18 Sep 2023, 14:41 Image20230918144632.jpg

Das Momentum Mikroskope vom Gestell mittels Hutch-Kran gekrant.

Coworkers: O.Bilani, M.Peter, S.Menzel, M.Izquierdo, V.Vardanyan, D.Doblas Jiménez

Entry   SXP Support, posted by Sascha Menzel on 10 Nov 2023, 12:25 Image20231110113433.jpgImage20231110113437.jpgImage20231110113439.jpgImage20231110113441.jpgImage20231110113444.jpg

Eine Edelstahlleitung gekürzt und auf Maaß gebogen, diverse Adapter und eine Flexschlauch an die Leitung montiert. Die fertige Leitung angeschlossen und an das R+K Gestell befestigt. Die Leitung und Adapter kamen von P.Schmidt (TS).

 

Entry   SXP Support, posted by Orkidia Bilani on 17 Nov 2023, 20:48 

SXP support yesterday (M. Izquierdo) and today (V.Vardanyans) with practical things :-)

Entry   SXP Support, posted by Sascha Menzel on 16 Jan 2024, 09:21 Image20240116090555.jpgImage20240116090558.jpg

R+K Profile und ein Stützrad an das R+K Gestell montiert.

Coworkers: F.Siyli, S.Menzel, V.Vardanyan

Entry   SXP Support, posted by Sascha Menzel on 17 Jan 2024, 14:49 

Ein weiteres R+K Profil und ein Stützrad an das R+K Gestell montiert.

Entry   SXP Support, posted by Sascha Menzel on 25 Jan 2024, 08:53 Image20240125085309.jpg

Die letzten R+K Profile und höhenverstellbare Rollen montiert.

Coworkers: O.Bilani, S.Menzel, V.Vardanyan

Entry   SXP Support, posted by Sascha Menzel on 11 Mar 2024, 17:55 IMG_8258_1.jpg

Einen kleinen und einen großen Metallschrank vom XHCrew Lager zur SXP Hutch transportiert. Einen Holzschrank in der Hutch ausgeräumt und nach draußen transportiert und entsorgt. Die beiden Metallschränke in der Hutch aufgestellt.

Coworkers: S.Menzel, O.Bilani, V.Vardanyan 

Entry   SXP Support, posted by Sascha Menzel on 27 May 2024, 14:41 Image20240527144002.jpg

An 2 Posterrahmen Magnete montiert und diese an die SXP exp.Hutch Stahltür geheftet.

Entry   SXP Support, posted by Sascha Menzel on 05 Jun 2024, 13:58 

Einen Granit in der SCS Hutch an den Verstellschrauben in eine andere Position verstellt.

Entry   SXP Support, posted by Sascha Menzel on 06 Jun 2024, 15:05 Image20240606150515.jpgImage20240606150518.jpgImage20240606150520.jpg

Die oberen Monitore in der Kontoll Hutch von SXP abgenommen, die Halter nach links verschoben und die Monitore an die HAlter wieder angehängt und angeschlossen.

Coworkers: S.Menzel, M.Pooch (TS)

Entry   SXP Support, posted by Sascha Menzel on 18 Jul 2024, 10:26 Image20240719111251.jpg

Bei 5 Metallschränken auf der Balkon Ebene nahe SXP Kontroll Hutch jeweils 2 Schubladen und einen Fachboden zusätzlich eingebaut.

Entry   SXP Support, posted by Orkidia Bilani on 25 Jul 2024, 14:53 

-> Connected the dewar in the exp. hutch.

-> Emptied a (more or less broken) table located in the experiment hall (at their small assembly area) and disposed it.

-> Prepared (Anschlagen") a chamber for craning, which s. Arslan will carry out tomorrow.

 

Co-Workers: O. Bilani, V. Vardanyan

Entry   SXP Support, posted by Orkidia Bilani on 31 Jul 2024, 14:17 

-> Emptied another (more or less broken) table located in the experiment hall (at SXP small assembly area) and disposed it.

-> V. Vardanyan placed in SXP cabinets most of the content of the SXP boxes in the Hall.

-> Brought to the 2nd life shelf a box with a non-fitting hose for the air pads (Der Schlauchanschluß passt nicht zu den Anschluß der Druckluftinstallation in der Halle).

-> Got a box full of small sorting boxes for our consumables' storage and placed it in the cabinet.

Co-workers: V. Vardanyan; O. Bilani

Entry   SXP Support, posted by Sascha Menzel on 22 Aug 2024, 21:04 Image20240822192317.jpg

Einen Verteiler mit Absperrventilen für die Entnahme von LN2 zusammengebaut und eine Dichtheitsprüfung an einen Dewar durchgeführt.

Entry   SXP Support, posted by Sascha Menzel on 12 Sep 2024, 15:08 Image20240912150022.jpgImage20240912150024.jpgImage20240912150027.jpg

Am Montag 16.09. wird eine Kammer getrennt und mit dem Hutch-Kran angehoben damit eine Fremdfirma aus Frankreich an der Kammer arbeiten kann. Um die Kammer sicher abzusetzen, wurde ein Gestell aus R+K Profilen gebaut.

Coworkers: J.Ohnesorge, V.Vardanyan, P.Schönborn, S.Menzel

Entry   SXP Support, posted by Sascha Menzel on 13 Sep 2024, 12:22 Image20240913122655.jpgImage20240913122657.jpg

Für das kranen am Montag 16.09. muss eine Pumpe von der Kammer entfernt werden. Die Kammer wurde befüftet, anschließend wurde die Pumpe demontiert und die Kammer mit einem Blindflansch wieder verschlossen und ein Vacuum-Test durchgeführt.

Coworkers: J.Ohnesorge, S.Menzel

Entry   SXP Support, posted by Sascha Menzel on 16 Sep 2024, 14:25 Image20240916142209.jpgImage20240916142212.jpgImage20240916142214.jpg

Eine Kammer auf 600mm mit dem Hutch-Kran angehoben und mit R+K Profilen unterbaut. Die Kammer auf die R+K Profile abgesetzt.

Entry   SXP Support, posted by Sascha Menzel on 17 Sep 2024, 12:33 Image20240918141658.jpg

Einen 55 zoll Monitor in der SXP Kontrollhütte an Hilti Profilen angebracht. Der Monitorhalter hat keine Neigungswinkeleinstellung und wird von P.Grychtol neu bestellt.

Coworkers: P.Schönborn, S.Menzel

ELOG V3.1.4-7c3fd00